I want to search for...
Permit #2023051520
Permit Details
Status: COED
| Parcel Id: 07-11-31-7017-00050-0050 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00050 |
| Subdivision: 2129 - SECTION 17-BELLE TERRE |
| Job Phone: 912-258-2201 |
| Location Address: 10 BOSTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/27/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0050 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/27/2024 | FINAL APPROVED | MKRASKI |
| ROW - STORMWATER FINAL | 03/27/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE CLEAN THE LITTLE BIT OF DIRT OUT OF THE CULVERT PIPE PASSING AS NOTED THAT YOU WILL TAKE CARE OF THIS. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/27/2024 | FINAL APPROVED | DHANEY |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/26/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE IN THE FIELD. ------------------------------------------------------------------------- 3/19/2024 - PREVIOUS INSPECTION NOTES 3/19/23 UPON WALKING PROPERTY DETERMINED THAT ON THE LEFT SIDE PROPERTY LINE THERE IS A HIGH SPOT MARKED IN WHITE PAINT. ALSO YOU WILL NEDD TO MAKE A MORE PRONOUNCED SWALE/BERM IN THE OUTLINED AREA. YOU WILL NEDD TO REMOVE ALL SOD 4" FROM OFF THE FENCE AROUND THE YARD. ON THE RIGHT SIDE PROPERTY LINE THAT WILL REQUIRE YOU TO RELOCATE THE SWALE FURTHER IN FROM OFF OF THE FENCE TO INSIDE THE PROPERTY LINE AND GRADE ACCORDINGLY SO IT HAS POSITIVE FLOW FROM REAR YARD TO FRONT SWALE. Inspector Notes from Inspection 9463 CORRECTIONS REQUIRED MADE AT THE TIME OF THI INSPECTION. APPROVING THIS AS NOTED. 3/11/2024 - PREVIOUS INSPECTION NOTES NEED TO MAKE ALL ADJACENT LOTS THAT ARE IMPROVED ON SURVEY ALSO NEED TO GET ALL FFE OF ALL IMPROVED LOT THAT IMPROVED. ALSO NEED TO GET CULVERT INVERT WITH IN 100' FROM YOUR LOT. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/26/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/19/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: CORRECTIONS REQUIRED MADE AT THE TIME OF THI INSPECTION. APPROVING THIS AS NOTED. 3/11/2024 - PREVIOUS INSPECTION NOTES NEED TO MAKE ALL ADJACENT LOTS THAT ARE IMPROVED ON SURVEY ALSO NEED TO GET ALL FFE OF ALL IMPROVED LOT THAT IMPROVED. ALSO NEED TO GET CULVERT INVERT WITH IN 100' FROM YOUR LOT. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/19/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 3/19/23 UPON WALKING PROPERTY DETERMINED THAT ON THE LEFT SIDE PROPERTY LINE THERE IS A HIGH SPOT MARKED IN WHITE PAINT. ALSO YOU WILL NEDD TO MAKE A MORE PRONOUNCED SWALE/BERM IN THE OUTLINED AREA. YOU WILL NEDD TO REMOVE ALL SOD 4" FROM OFF THE FENCE AROUND THE YARD. ON THE RIGHT SIDE PROPERTY LINE THAT WILL REQUIRE YOU TO RELOCATE THE SWALE FURTHER IN FROM OFF OF THE FENCE TO INSIDE THE PROPERTY LINE AND GRADE ACCORDINGLY SO IT HAS POSITIVE FLOW FROM REAR YARD TO FRONT SWALE. Inspector Notes from Inspection 9463 CORRECTIONS REQUIRED MADE AT THE TIME OF THI INSPECTION. APPROVING THIS AS NOTED. 3/11/2024 - PREVIOUS INSPECTION NOTES NEED TO MAKE ALL ADJACENT LOTS THAT ARE IMPROVED ON SURVEY ALSO NEED TO GET ALL FFE OF ALL IMPROVED LOT THAT IMPROVED. ALSO NEED TO GET CULVERT INVERT WITH IN 100' FROM YOUR LOT. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/11/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: NEED TO MAKE ALL ADJACENT LOTS THAT ARE IMPROVED ON SURVEY ALSO NEED TO GET ALL FFE OF ALL IMPROVED LOT THAT IMPROVED. ALSO NEED TO GET CULVERT INVERT WITH IN 100' FROM YOUR LOT. | |||
| U-CROSS CONNECTION | 03/05/2024 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 01/16/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 01/16/24 PLEASE TURN CLAMP BOLT DOWN THEY SHOULD NOT FACE UPWARDS. MAKE SURE POUR AREA IS PUMPED DRY AND MITER ENDS MAINTAIN 6X6 FOOTER AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. | |||
| ELECTRIC - EARLY POWER | 01/08/2024 | APPROVED | RMARTIN |
| U - SEWER TIE IN | 12/21/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 11/30/2023 | APPROVED | FWILLIS |
| INSULATION | 11/27/2023 | APPROVED | JSTEWART |
| ALL ROUGH | 11/20/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/16/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 11/14/2023 | APPROVED | JSTEWART |
| ROW - DRAINAGE | 11/13/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, EVERYTHING LOOK GOOD | |||
| WALL SHEATHING | 11/02/2023 | APPROVED | JSTEWART |
| Note: 11/2/23- Not needed. | |||
| ROOF SHEATHING | 10/31/2023 | APPROVED | JSTEWART |
| TIE BEAM / LINTEL | 10/23/2023 | APPROVED | JSTEWART |
| Note: 10/19/2023 - PREVIOUS INSPECTION NOTES 10/19/23- (5) sill course exceeds 3/8" max morter bed. R606.3.1 Bed and head joints.....head and bed joints shall be 3/8 inch (9.5 mm) thick, | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/23/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/19/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 10/19/23- (5) sill course exceeds 3/8" max morter bed. R606.3.1 Bed and head joints.....head and bed joints shall be 3/8 inch (9.5 mm) thick, | |||
| MONOLITHIC SLAB | 10/04/2023 | APPROVED | FWILLIS |
| Note: 9/29/2023 - PREVIOUS INSPECTION NOTES MISSINING PROOF OF COMPACTION. REBAR MISSING ON RIGHT SIDE REAR AS PER PLAN. (Highlighted on Plans.) | |||
| MONOLITHIC SLAB | 09/29/2023 | Disapproved -FEE REQUIRED | FWILLIS |
| Note: MISSINING PROOF OF COMPACTION. REBAR MISSING ON RIGHT SIDE REAR AS PER PLAN. (Highlighted on Plans.) | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/27/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/27/2023 | APPROVED | MGIBSON |
| ROW - DRAINAGE | 09/19/2023 | APPROVED | PFLANAGAN |
| Note: 9/14/2023 - PREVIOUS INSPECTION NOTES 9/14/23=NEEDS TO REMOVE THE POTTY FROM THE SWALE INSPECTOR BE BACK 9/19/23 ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/7/2023 - PREVIOUS INSPECTION NOTES 9/7/23= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEEDS TO REMOVE THE POTTY FROM THE SWALE NEED TO REMOVE THE DUMPSTER FROM THE SWALE. INSPECCTOR BE BACK ON 09/14/23 | |||
| ROW - DRAINAGE | 09/14/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 9/14/23=NEEDS TO REMOVE THE POTTY FROM THE SWALE ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 9/7/2023 - PREVIOUS INSPECTION NOTES 9/7/23= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEEDS TO REMOVE THE POTTY FROM THE SWALE NEED TO REMOVE THE DUMPSTER FROM THE SWALE. INSPECCTOR BE BACK ON 09/14/23 | |||
| ROW - DRAINAGE | 09/07/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 9/7/23= NEED TO INSTALL SILT FENCE ALL AROUND THE CONSTRUCTION SITE Erosion Control Inspection (119), Section 300.04 Lot Grading Permit Requirements for Vacant Lots When necessary, an Erosion Control Inspection (119) NEEDS TO REMOVE THE POTTY FROM THE SWALE NEED TO REMOVE THE DUMPSTER FROM THE SWALE. INSPECCTOR BE BACK ON 09/14/23 | |||
| WATER METER INSTALLATION REQUEST | 08/28/2023 | APPROVED | CBOWERMASTER |
| Note: 8/21/2023 8:31:17 AM- PREVIOUS INSPECTION NOTES wooded lot | |||
| WATER METER INSTALLATION REQUEST | 08/18/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: wooded lot |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 03/18/2024 | 03/18/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/08/2023 | 11/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/23/2023 | 10/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/23/2023 | 10/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/24/2023 | 07/24/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/20/2023 | 07/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/20/2023 | 07/21/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| MECH | COMPLETE | 07/20/2023 | 07/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/12/2023 | 06/12/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/31/2023 | 06/02/2023 |
| Note: Held By: JPI 1. The SF on the energy calcs varies from the floor plan SF. Please cure. 107.2.6 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 05/31/2023 | 06/02/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/31/2023 | 06/01/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing in bed 2 behind door. NEC 2017 210.52 | |||
| ENGIN1 | COMPLETE | 05/31/2023 | 05/31/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/31/2023 | 05/31/2023 |
| LOCATE | COMPLETE | 05/31/2023 | 06/01/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/31/2023 | 05/31/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs do not match house plans | |||
| BADMIN | COMPLETE | 05/31/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 05/31/2023 | 07/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/27/2024 |
| REINSPECTION FEE | ¤40.00 | 03/27/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/27/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/27/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/27/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/27/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/27/2023 |
| SEWER CREDIT | (¤1,147.00) | 07/27/2023 |
| SEWER INSPECTION | ¤25.00 | 07/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/27/2023 |
| SITE PLAN 30 | ¤30.00 | 07/27/2023 |
| SURCHARGE FS 533.721 | ¤5.34 | 07/27/2023 |
| SURCHARGE - FS 468.631 | ¤8.01 | 07/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/27/2023 |
| WATER- TURN ON | ¤25.00 | 07/27/2023 |
| ADJUSTMENT 50% | (¤533.91) | 07/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/27/2023 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 07/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 07/27/2023 |
| CONNECTION FEES | ¤1,166.26 | 07/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/27/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/27/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,449.89 |