I want to search for...
Permit #2023051581
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00150-0030 |
| CONDITIONED SPACE: 1876 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2358 sqft |
| Block: 00150 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 904-268-7730 |
| Location Address: 151 ROLLING SANDS DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/28/2023 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤179,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
DANIEL GREGORY PUGLISI
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
EC13011195 (Exp: 08/31/2024) | 407-302-7800 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1165 SOUTH 5TH MACCLENNY, FL 32063 |
CCC1330709 (Exp: 08/31/2026) | 904-322-9409 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 12/13/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - STORMWATER FINAL | 12/07/2023 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved ------------------------------------------------------------------------------------ 12/6/2023 - PREVIOUS INSPECTION NOTES STILL NEED TO HAVE ALL BARE AREAS IN ADJACENT LOT SODED ------------------------------------------------------------------------------------- 12/5/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT 2) NEED TO HAVE ALL BARE AREAS ON THE RIGHT SIDE PROPERTY LINE SODED AND THE SOD NEEDS TO MATCH SOD EXISTING ON THE ADJACENT LOT | |||
| ROW - FINAL APRON (AFTER POUR) | 12/06/2023 | APPROVED | PFLANAGAN |
| Note: CONTRACTOR HERE AT THE TIME OF THE INSPECTION DOING ROAD DAMAGE PATCH --------------------------------------------------------------------------------- 12/5/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE THE ROAD DAMAGE PATCHED WITH HOT PATCH BEFORE PASSING | |||
| ROW - STORMWATER FINAL | 12/06/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL NEED TO HAVE ALL BARE AREAS IN ADJACENT LOT SODED ------------------------------------------------------------------------------------- 12/5/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT 2) NEED TO HAVE ALL BARE AREAS ON THE RIGHT SIDE PROPERTY LINE SODED AND THE SOD NEEDS TO MATCH SOD EXISTING ON THE ADJACENT LOT | |||
| ROW - STORMWATER FINAL | 12/05/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT 2) NEED TO HAVE ALL BARE AREAS ON THE RIGHT SIDE PROPERTY LINE SODED AND THE SOD NEEDS TO MATCH SOD EXISTING ON THE ADJACENT LOT | |||
| ROW - FINAL APRON (AFTER POUR) | 12/05/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO HAVE THE ROAD DAMAGE PATCHED WITH HOT PATCH BEFORE PASSING | |||
| BLD - BUILDING FINAL | 12/05/2023 | FINAL APPROVED | JWALKER |
| Note: 12/4/2023 - PREVIOUS INSPECTION NOTES 1. GFI outlet under the exterior meter can is not working. 2. While testing the bedroom smoke detectors they are only setting off the hallway smoke detectore and not the other bedrooms. There is possible compatability issue due to the different types of smokes used. | |||
| BLD - BUILDING FINAL | 12/04/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. GFI outlet under the exterior meter can is not working. 2. While testing the bedroom smoke detectors they are only setting off the hallway smoke detectore and not the other bedrooms. There is possible compatability issue due to the different types of smokes used. | |||
| ROW - FINAL APRON (AFTER POUR) | 12/04/2023 | CANCELLED BY APPLICANT | WEB |
| ROW - STORMWATER FINAL | 12/04/2023 | CANCELLED BY APPLICANT | WEB |
| U -UTILITY RESIDENTIAL FINAL | 12/04/2023 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/01/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/01/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/09/2023 | CANCELLED BY APPLICANT | WEB |
| ROW- PRE-APRON (PRE-POUR) | 11/08/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 10/26/2023 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2200 9/26/2023 - PREVIOUS INSPECTION NOTES SCH 80 pedestal conduit still has not been anchored to the wall. Job box hidden by dumpster does not meet requirements of R319.1 addressing 9/25/2023 - PREVIOUS INSPECTION NOTES 9/25/23 Below listed corrections have not been made. Schedule 80 conduit will also need to be anchored to the wall now that the siding has been installed. 8/31/2023 - PREVIOUS INSPECTION NOTES 1. The metal and the Sch 80 Conduit connections are missing weather tight gaskets where they connect to the panels. 9-28-23 1. Emailed FPL at 10:53. | |||
| ELECTRIC-TUG | 09/28/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 9/26/2023 - PREVIOUS INSPECTION NOTES SCH 80 pedestal conduit still has not been anchored to the wall. Job box hidden by dumpster does not meet requirements of R319.1 addressing 9/25/2023 - PREVIOUS INSPECTION NOTES 9/25/23 Below listed corrections have not been made. Schedule 80 conduit will also need to be anchored to the wall now that the siding has been installed. 8/31/2023 - PREVIOUS INSPECTION NOTES 1. The metal and the Sch 80 Conduit connections are missing weather tight gaskets where they connect to the panels. 9-28-23 1. Emailed FPL at 10:53. | |||
| ELECTRIC-TUG | 09/26/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: SCH 80 pedestal conduit still has not been anchored to the wall. Job box hidden by dumpster does not meet requirements of R319.1 addressing 9/25/2023 - PREVIOUS INSPECTION NOTES 9/25/23 Below listed corrections have not been made. Schedule 80 conduit will also need to be anchored to the wall now that the siding has been installed. 8/31/2023 - PREVIOUS INSPECTION NOTES 1. The metal and the Sch 80 Conduit connections are missing weather tight gaskets where they connect to the panels. | |||
| ELECTRIC-TUG | 09/25/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 9/25/23 Below listed corrections have not been made. Schedule 80 conduit will also need to be anchored to the wall now that the siding has been installed. 8/31/2023 - PREVIOUS INSPECTION NOTES 1. The metal and the Sch 80 Conduit connections are missing weather tight gaskets where they connect to the panels. | |||
| INSULATION | 09/20/2023 | APPROVED | JWALKER |
| Note: 9/19/2023 - PREVIOUS INSPECTION NOTES 9/14/23 The microwave duct has not been corrected. Check at insulation. | |||
| INSULATION | 09/19/2023 | CANCELLED BY APPLICANT | JWALKER |
| Note: 9/14/23 The microwave duct has not been corrected. Check at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 09/15/2023 | APPROVED | JWALKER |
| Note: 9/14/2023 - PREVIOUS INSPECTION NOTES 9/14/23 1. The rear slider has not been corrected. 2. The fornt door and the corners at the front entry ceiling have not been corrected. 9/13/2023 - PREVIOUS INSPECTION NOTES 1. The rear slider and the front door have not had the self adhereing flashing installed. Details on WP of the prints. 2. Front entry ceiling, zip sheating not sealed. | |||
| ALL ROUGH | 09/14/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 9/14/23 The microwave duct has not been corrected. Check at insulation. 9/13/2023 - PREVIOUS INSPECTION NOTES 1. Electrical sevrice feeder wire needs to be supported minnimum 4.5' o.c. where it runs parallel with the roof trusses. NEC 334.30 2. Service feeder wires need to be connected at the subpanel, connect and tourqe. NEC 110.14 3. Fill the shower liner for water tight test. 4. The kitchen knee wall concrete cut out at the sink drain needs to be sealed. 5. Seal the microwave exhaust duct mechanical joints. | |||
| LATH/BRICK/ WATER BARRIER | 09/14/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 9/14/23 1. The rear slider has not been corrected. 2. The fornt door and the corners at the front entry ceiling have not been corrected. 9/13/2023 - PREVIOUS INSPECTION NOTES 1. The rear slider and the front door have not had the self adhereing flashing installed. Details on WP of the prints. 2. Front entry ceiling, zip sheating not sealed. | |||
| LATH/BRICK/ WATER BARRIER | 09/13/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The rear slider and the front door have not had the self adhereing flashing installed. Details on WP of the prints. 2. Front entry ceiling, zip sheating not sealed. | |||
| ALL ROUGH | 09/13/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Electrical sevrice feeder wire needs to be supported minnimum 4.5' o.c. where it runs parallel with the roof trusses. NEC 334.30 2. Service feeder wires need to be connected at the subpanel, connect and tourqe. NEC 110.14 3. Fill the shower liner for water tight test. 4. The kitchen knee wall concrete cut out at the sink drain needs to be sealed. 5. Seal the microwave exhaust duct mechanical joints. | |||
| ROOF VALLEY & METAL | 09/08/2023 | APPROVED | JWALKER |
| ROOF VALLEY & METAL | 09/07/2023 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 09/07/2023 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 09/05/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 09/05/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/01/2023 | APPROVED | JWALKER |
| Note: 8/29/2023 - PREVIOUS INSPECTION NOTES | |||
| ELECTRIC-TUG | 08/31/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The metal and the Sch 80 Conduit connections are missing weather tight gaskets where they connect to the panels. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/29/2023 | CANCELLED BY APPLICANT | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING | 08/24/2023 | APPROVED | JWALKER |
| WALL SHEATHING | 08/24/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 08/10/2023 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 08/09/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/08/2023 | APPROVED | JWALKER |
| Note: 1 stop 9:21 am workers still preparing site. | |||
| U - SEWER TIE IN | 08/07/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 08/04/2023 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 08/04/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/17/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/08/2023 | 08/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/08/2023 | 08/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/23/2023 | 06/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 06/12/2023 | 06/12/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/01/2023 | 07/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/31/2023 | 06/01/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/31/2023 | 06/02/2023 |
| Note: Held By: JPI 2023051575 1 hour not approved 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 05/31/2023 | 06/02/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/31/2023 | 06/01/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 M.Bed behind door | |||
| ENGIN1 | COMPLETE | 05/31/2023 | 06/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/31/2023 | 06/01/2023 |
| LOCATE | COMPLETE | 05/31/2023 | 06/02/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/31/2023 | 06/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 05/31/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 12/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/12/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 12/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/28/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/28/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/28/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/28/2023 |
| SEWER CREDIT | (¤1,466.00) | 06/28/2023 |
| SEWER INSPECTION | ¤25.00 | 06/28/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/28/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/28/2023 |
| SITE PLAN 30 | ¤30.00 | 06/28/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/28/2023 |
| WATER- TURN ON | ¤25.00 | 06/28/2023 |
| ADJUSTMENT 50% | (¤417.42) | 06/28/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/28/2023 |
| INSPECTION - RESIDENTIAL | ¤627.00 | 06/28/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤177.84 | 06/28/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/28/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/28/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/28/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/28/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/28/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/28/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/28/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/28/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/28/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/28/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/28/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/28/2023 |
| SURCHARGE FS 533.721 | ¤4.17 | 06/28/2023 |
| SURCHARGE - FS 468.631 | ¤6.26 | 06/28/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/28/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/28/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/28/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,051.48 |