I want to search for...
Permit #2023051582
Permit Details
Status: COED
| Parcel Id: 07-11-31-7024-00010-0020 |
| CONDITIONED SPACE: 1876 sqft |
| GARAGE: 414 sqft |
| OPENED PORCH (WITH ROOF) : 68 sqft |
| Total Square Footage: 2358 sqft |
| Block: 00010 |
| Subdivision: 2167 - SECTION 24-PINE GROVE |
| Job Phone: 904-268-7730 |
| Location Address: 4 PRITCHARD DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/13/2023 |
| NOC: RECORDED |
| Applicant name: SCOTT CHRISTIAN HOWARD |
| Owner: FOCUS HOMES LLC OF FLORIDA |
|
Address 5220 SHAD RD JACKSONVILLE, FL 32257 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤179,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
FOCUS HOMES LLC OF FLORIDA
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
5220 SHAD RD JACKSONVILLE, FL 32257 |
# 202 JACKSONVILLE, FL 32257 |
CRC1332443 (Exp: 08/31/2026) | 904-268-7730 |
Sub Contractors
RONALD KEVIN HAUPT
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CAC058534 (Exp: 08/31/2026) | 407-321-0064 |
CLINTON J HULSLANDER SR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
CFC1430632 (Exp: 08/31/2026) | 407-321-0064 | 407-688-8534 |
DANIEL GREGORY PUGLISI
| Status | Location Address | State License Number | Phone |
| INACTIVE |
4005 MARONDA WAY SANFORD, FL 32771 |
EC13011195 (Exp: 08/31/2024) | 407-302-7800 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1165 SOUTH 5TH MACCLENNY, FL 32063 |
CCC1330709 (Exp: 08/31/2026) | 904-322-9409 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/30/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NOTHING HAS CHANGED FROM YESTERDAYS INSPECTION STILL TO MUCH CONCRETE AT THE END OF THE CULVERT MITER ENDS NEED TO REMOVE SO CONCRETE IS FLUSH WITH THE MITER ENDS ------------------------------------------------------------------------ 11/29/2023 - PREVIOUS INSPECTION NOTES STILL TO MUCH CONCRETE AT THE END OF THE CULVERT MITER ENDS NEED TO REMOVE SO CONCRETE IS FLUSH WITH THE MITER ENDS ----------------------------------------------------------------------------------- 11/28/2023 - PREVIOUS INSPECTION NOTES NEED TO CHIP ALL OVER POURED CONCRETE FROM THE END OF CULVERT THERE IS TO MUCH | |||
| ROW - STORMWATER FINAL | 11/30/2023 | APPROVED | GBERTOLA |
| Note: AS A COURTESY INSPECTOR WENT BACK AND RE-INSPECTED I stopped by at the end of the day and they were working on their concrete overpour in the swale AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL TO THE CONCRETE POUR. 11/30/2023 - PREVIOUS INSPECTION NOTES NOTHING HAS CHANGED FROM YESTERDAYS INSPECTION STILL TO MUCH CONCRETE AT THE END OF THE CULVERT MITER ENDS NEED TO REMOVE SO CONCRETE IS FLUSH WITH THE MITER ENDS ------------------------------------------------------------------------ 11/29/2023 - PREVIOUS INSPECTION NOTES STILL TO MUCH CONCRETE AT THE END OF THE CULVERT MITER ENDS NEED TO REMOVE SO CONCRETE IS FLUSH WITH THE MITER ENDS ----------------------------------------------------------------------------------- 11/28/2023 - PREVIOUS INSPECTION NOTES NEED TO CHIP ALL OVER POURED CONCRETE FROM THE END OF CULVERT THERE IS TO MUCH | |||
| ROW - STORMWATER FINAL | 11/29/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: STILL TO MUCH CONCRETE AT THE END OF THE CULVERT MITER ENDS NEED TO REMOVE SO CONCRETE IS FLUSH WITH THE MITER ENDS ----------------------------------------------------------------------------------- 11/28/2023 - PREVIOUS INSPECTION NOTES NEED TO CHIP ALL OVER POURED CONCRETE FROM THE END OF CULVERT THERE IS TO MUCH | |||
| ROW - STORMWATER FINAL | 11/28/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NEED TO CHIP ALL OVER POURED CONCRETE FROM THE END OF CULVERT THERE IS TO MUCH | |||
| U -UTILITY RESIDENTIAL FINAL | 11/28/2023 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 11/28/2023 | FINAL APPROVED | KSANDOE |
| U-CROSS CONNECTION | 11/28/2023 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 11/28/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/27/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------- 11/21/2023 - PREVIOUS INSPECTION NOTES DRAINAGE CONVEYANCE ON THE RIGHT SIDE IS NOT CONSISTENT, Section 300.01 (A)(1)(C)(6). The subject lot drainage must not negatively impact any adjacent property. (B) THERE APPEARS TO BE A SWALE ON THE RIGHT SIDE OF THE PROPERTY LINE IN THE FINAL SURVEY, BUT IT WAS NOT VISIBLE DURING MY INSPECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/27/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ----------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 11/22/23= FINAL SURVEY NEED TO BE APPROVED FIRST ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/21/2023 - PREVIOUS INSPECTION NOTES DRAINAGE CONVEYANCE ON THE RIGHT SIDE IS NOT CONSISTENT, Section 300.01 (A)(1)(C)(6). The subject lot drainage must not negatively impact any adjacent property. (B) THERE APPEARS TO BE A SWALE ON THE RIGHT SIDE OF THE PROPERTY LINE IN THE FINAL SURVEY, BUT IT WAS NOT VISIBLE DURING MY INSPECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/22/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 11/22/23= FINAL SURVEY NEED TO BE APPROVED FIRST ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/21/2023 - PREVIOUS INSPECTION NOTES DRAINAGE CONVEYANCE ON THE RIGHT SIDE IS NOT CONSISTENT, Section 300.01 (A)(1)(C)(6). The subject lot drainage must not negatively impact any adjacent property. (B) THERE APPEARS TO BE A SWALE ON THE RIGHT SIDE OF THE PROPERTY LINE IN THE FINAL SURVEY, BUT IT WAS NOT VISIBLE DURING MY INSPECTION. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/21/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: DRAINAGE CONVEYANCE ON THE RIGHT SIDE IS NOT CONSISTENT, Section 300.01 (A)(1)(C)(6). The subject lot drainage must not negatively impact any adjacent property. (B) THERE APPEARS TO BE A SWALE ON THE RIGHT SIDE OF THE PROPERTY LINE IN THE FINAL SURVEY, BUT IT WAS NOT VISIBLE DURING MY INSPECTION. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/21/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: DRAINAGE CONVEYANCE ON THE RIGHT SIDE IS NOT CONSISTENT, Section 300.01 (A)(1)(C)(6). The subject lot drainage must not negatively impact any adjacent property. (B) THERE APPEARS TO BE A SWALE ON THE RIGHT SIDE OF THE PROPERTY LINE IN THE FINAL SURVEY, BUT IT WAS NOT VISIBLE DURING MY INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/03/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 10/20/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1050. Release Power Inspector Notes from Inspection 2200 Emailed FPL @ 1205. Release Power New inspection due to canceled inspection 9/26/2023 - PREVIOUS INSPECTION NOTES Liquid tuff not installed correctly allowing water and moisture into gfi 8/29/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed. Not ready for inspection. | |||
| U - SEWER TIE IN | 10/16/2023 | APPROVED | MGIBSON |
| Note: 8/3/2023 - PREVIOUS INSPECTION NOTES 8/2/2023 - PREVIOUS INSPECTION NOTES TAP NOT MADE tap not made | |||
| ELECTRIC-TUG | 09/28/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1205. Release Power New inspection due to canceled inspection 9/26/2023 - PREVIOUS INSPECTION NOTES Liquid tuff not installed correctly allowing water and moisture into gfi 8/29/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed. Not ready for inspection. | |||
| ELECTRIC-TUG | 09/27/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 9/26/2023 - PREVIOUS INSPECTION NOTES Liquid tuff not installed correctly allowing water and moisture into gfi 8/29/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed. Not ready for inspection. | |||
| ELECTRIC-TUG | 09/26/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Liquid tuff not installed correctly allowing water and moisture into gfi 8/29/2023 - PREVIOUS INSPECTION NOTES No meter can or pedestal installed. Not ready for inspection. | |||
| INSULATION | 09/19/2023 | APPROVED | KSANDOE |
| LATH/BRICK/ WATER BARRIER | 09/12/2023 | APPROVED | KSANDOE |
| Note: 9/11/2023 - PREVIOUS INSPECTION NOTES need front door installed for inspection | |||
| ALL ROUGH | 09/12/2023 | APPROVED | KSANDOE |
| Note: 9/11/2023 - PREVIOUS INSPECTION NOTES not ready for inspection. 1. Outlet and switch boxes hanging loose and not secure. 2. Grounds not made up in boxes NEC 250.148 3. still working on plumbing (no tests on DWV or Supply Inspection Stopped | |||
| ALL ROUGH | 09/11/2023 | Disapproved - NO FEE | LMILLER |
| Note: not ready for inspection. 1. Outlet and switch boxes hanging loose and not secure. 2. Grounds not made up in boxes NEC 250.148 3. still working on plumbing (no tests on DWV or Supply Inspection Stopped | |||
| LATH/BRICK/ WATER BARRIER | 09/11/2023 | Disapproved - NO FEE | LMILLER |
| Note: need front door installed for inspection | |||
| LATH/BRICK/ WATER BARRIER | 09/07/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 09/07/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF VALLEY & METAL | 09/06/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/01/2023 | APPROVED | KSANDOE |
| Note: 8/29/2023 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/29/2023 | CANCELLED BY APPLICANT | KSANDOE |
| ELECTRIC-TUG | 08/29/2023 | Disapproved - NO FEE | KSANDOE |
| Note: No meter can or pedestal installed. Not ready for inspection. | |||
| ROOF SHEATHING | 08/25/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 08/25/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2023 | CANCELLED BY APPLICANT | WEB |
| WALL SHEATHING | 08/24/2023 | CANCELLED BY APPLICANT | WEB |
| ROOF SHEATHING | 08/24/2023 | CANCELLED BY APPLICANT | WEB |
| FOUND SURVEY APPROVED (OFFICE) | 08/14/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/09/2023 | APPROVED | KSANDOE |
| Note: 8/8/2023 - PREVIOUS INSPECTION NOTES Foundation areas have washed out/ caved in in multiple areas. Walk your job | |||
| MONOLITHIC SLAB | 08/08/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Foundation areas have washed out/ caved in in multiple areas. Walk your job | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/03/2023 | APPROVED | MGIBSON |
| Note: 8/2/2023 - PREVIOUS INSPECTION NOTES NOT READY | |||
| GRAVITY SEWER TEST | 08/03/2023 | APPROVED | MGIBSON |
| Note: 8/2/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE | |||
| U - SEWER TIE IN | 08/03/2023 | Disapproved - NO FEE | MGIBSON |
| Note: 8/2/2023 - PREVIOUS INSPECTION NOTES TAP NOT MADE tap not made | |||
| GRAVITY SEWER TEST | 08/02/2023 | Disapproved - NO FEE | MGIBSON |
| Note: SEE FIRST ROUGH NOTE | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/02/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NOT READY | |||
| U - SEWER TIE IN | 08/02/2023 | Disapproved - NO FEE | MGIBSON |
| Note: TAP NOT MADE | |||
| WATER METER INSTALLATION REQUEST | 07/17/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/21/2023 | 11/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/02/2023 | 11/03/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Enegy calcs show R4.1 insulation on walls. Plans say R13. Revise calcs to match | |||
| ENGIN1 | COMPLETE | 08/14/2023 | 08/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/14/2023 | 08/14/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/23/2023 | 06/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/23/2023 | 06/28/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/01/2023 | 07/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/31/2023 | 06/02/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 05/31/2023 | 06/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 05/31/2023 | 06/01/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Master bed behind door | |||
| ENGIN1 | COMPLETE | 05/31/2023 | 06/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 05/31/2023 | 06/01/2023 |
| LOCATE | COMPLETE | 05/31/2023 | 06/02/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 05/31/2023 | 06/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 05/31/2023 | 06/12/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 05/31/2023 | 06/01/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM On site plan/survey Please provide the width of the circular driveway and provide the setback from the arc to front property line and the setback from the circular driveway to the right side property line. It must meet a minimum 5ft setback in both locations | |||
| BADMIN | COMPLETE | 05/31/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/30/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/30/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/28/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/28/2023 |
| CONTRACTOR CHANGE | ¤20.00 | 11/28/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/28/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/13/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/13/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/13/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/13/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/13/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/13/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/13/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/13/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/13/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/13/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/13/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/13/2023 |
| SURCHARGE FS 533.721 | ¤4.17 | 07/13/2023 |
| SURCHARGE - FS 468.631 | ¤6.26 | 07/13/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/13/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/13/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/13/2023 |
| CONNECTION FEES | ¤1,166.26 | 07/13/2023 |
| WATER- TURN ON | ¤25.00 | 07/13/2023 |
| ADJUSTMENT 50% | (¤417.42) | 07/13/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/13/2023 |
| INSPECTION - RESIDENTIAL | ¤627.00 | 07/13/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤177.84 | 07/13/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/13/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/13/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/13/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/13/2023 |
| SEWER CREDIT | (¤1,466.00) | 07/13/2023 |
| SEWER INSPECTION | ¤25.00 | 07/13/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/13/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/13/2023 |
| SITE PLAN 30 | ¤30.00 | 07/13/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,043.98 |