Permit #2023060001
Permit Details
Status: COED
| Parcel Id: 07-11-31-7022-00080-0120 |
| CONDITIONED SPACE: 2295 sqft |
| GARAGE: 538 sqft |
| OPENED PORCH (WITH ROOF) : 201 sqft |
| OPENED PORCH (WITH ROOF) : 229 sqft |
| Total Square Footage: 3263 sqft |
| Block: 00080 |
| Subdivision: 2217 - SECTION 22-WYNNFIELD |
| Job Phone: 912-258-2201 |
| Location Address: 273 WESTHAMPTON DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/04/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/23/2024 | FINAL APPROVED | MKRASKI |
| U-CROSS CONNECTION | 02/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irr with DBL CHECK-no crossconnectin | |||
| ROW - STORMWATER FINAL | 02/22/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: PLEASE CLEAN ALL DIRT OUT OF CULVERT PASSING AS NOTED | |||
| U -UTILITY RESIDENTIAL FINAL | 02/22/2024 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 02/22/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Extra door must be removed before final in garage 2. Exterior penitraions need to be sealed (pipe for irragation zone wires) 3. AHU closest holes in wall need to be sealed 4. Liquid line going into AHU needs to be sealed | |||
| ROW - FINAL APRON (AFTER POUR) | 02/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/30/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U - SEWER TIE IN | 01/25/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 01/16/2024 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 12pm | |||
| INSULATION | 12/11/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 11/29/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Slab needs to be repaired in garage wall where it exposes drain pipe | |||
| ALL ROUGH | 11/21/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Kitchen wall needs to be sealed where power and plumbing comes up 2. Plubing in spare bathroom needs to be moved inside wall 3. Dryer duct nail plate needs to extend 2'' below top plate 4. Master bedroom window missing anchors | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/20/2023 | APPROVED | FWILLIS |
| Note: 11/20/23 - ITEMS CORRECTED 11/17/2023 - PREVIOUS INSPECTION NOTES Truss bracing passed Bearing wall has not been addressed Could not locate truss T07 Truss T15 over entry is out of plumb. 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23 1. Load bearing detail does not match what is installed, plans call for SP2s or SP4s on studs, marked on print 2. Load bearing opening not per deatil missing SP2s or SP4s, marked on print 3. Truss layout in engineering pack is wrong, (home is reveresed on plans) 4. No trade work shall start untill after this inspection has been passed Stopped inspection did not check truss engineering 11/13/2023 - PREVIOUS INSPECTION NOTES 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23 - THERE ARE NO FLOOR PLANS IN THE SET OF PLANS ON SITE. NO DETAILS FOR THE BEARING WALL IN GARAGE. PLEASE PROVIDE DETAIL FOR ANCHOR BOLTS STRAPPING ETC... 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Not ready 2. New set of plans need to be onsite for inspector | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/17/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Truss bracing passed Bearing wall has not been addressed Could not locate truss T07 Truss T15 over entry is out of plumb. 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23 1. Load bearing detail does not match what is installed, plans call for SP2s or SP4s on studs, marked on print 2. Load bearing opening not per deatil missing SP2s or SP4s, marked on print 3. Truss layout in engineering pack is wrong, (home is reveresed on plans) 4. No trade work shall start untill after this inspection has been passed Stopped inspection did not check truss engineering 11/13/2023 - PREVIOUS INSPECTION NOTES 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23 - THERE ARE NO FLOOR PLANS IN THE SET OF PLANS ON SITE. NO DETAILS FOR THE BEARING WALL IN GARAGE. PLEASE PROVIDE DETAIL FOR ANCHOR BOLTS STRAPPING ETC... 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Not ready 2. New set of plans need to be onsite for inspector | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/16/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 11/16/23 1. Load bearing detail does not match what is installed, plans call for SP2s or SP4s on studs, marked on print 2. Load bearing opening not per deatil missing SP2s or SP4s, marked on print 3. Truss layout in engineering pack is wrong, (home is reveresed on plans) 4. No trade work shall start untill after this inspection has been passed Stopped inspection did not check truss engineering 11/13/2023 - PREVIOUS INSPECTION NOTES 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23 - THERE ARE NO FLOOR PLANS IN THE SET OF PLANS ON SITE. NO DETAILS FOR THE BEARING WALL IN GARAGE. PLEASE PROVIDE DETAIL FOR ANCHOR BOLTS STRAPPING ETC... 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Not ready 2. New set of plans need to be onsite for inspector | |||
| LATH/BRICK/ WATER BARRIER | 11/16/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/13/2023 | CANCELLED BY APPLICANT | MKRASKI |
| Note: 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23 - THERE ARE NO FLOOR PLANS IN THE SET OF PLANS ON SITE. NO DETAILS FOR THE BEARING WALL IN GARAGE. PLEASE PROVIDE DETAIL FOR ANCHOR BOLTS STRAPPING ETC... 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Not ready 2. New set of plans need to be onsite for inspector | |||
| ROOF VALLEY & METAL | 10/31/2023 | FINAL APPROVED | FWILLIS |
| ROOF SHEATHING | 10/23/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/23/2023 | Disapproved - NO FEE | FWILLIS |
| Note: 10/23/23 - THERE ARE NO FLOOR PLANS IN THE SET OF PLANS ON SITE. NO DETAILS FOR THE BEARING WALL IN GARAGE. PLEASE PROVIDE DETAIL FOR ANCHOR BOLTS STRAPPING ETC... 10/20/2023 - PREVIOUS INSPECTION NOTES 1. Not ready 2. New set of plans need to be onsite for inspector | |||
| WALL SHEATHING | 10/20/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/20/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 1. Not ready 2. New set of plans need to be onsite for inspector | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/19/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/05/2023 | APPROVED | BTAYLOR |
| Note: 10/4/2023 - PREVIOUS INSPECTION NOTES Dowel not drilled and epoxied deep enough STOPPED inspection, Check all missed dowels to ensure they are per repair detail | |||
| TIE BEAM / LINTEL | 10/04/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: Dowel not drilled and epoxied deep enough STOPPED inspection, Check all missed dowels to ensure they are per repair detail | |||
| MONOLITHIC SLAB | 09/26/2023 | APPROVED | JWALKER |
| Note: 9/25/2023 - PREVIOUS INSPECTION NOTES 1. Missing multiple downs marked on plans 2. Footings need to be back filled to form boards or additional form boards added marked on primt 3. Roots need to be removed from footing marked on print 4. Dowels in wrong cells per plans marked on print | |||
| MONOLITHIC SLAB | 09/25/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Missing multiple downs marked on plans 2. Footings need to be back filled to form boards or additional form boards added marked on primt 3. Roots need to be removed from footing marked on print 4. Dowels in wrong cells per plans marked on print | |||
| MONOLITHIC SLAB | 09/22/2023 | CANCELLED BY APPLICANT | WEB |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/18/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/18/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/24/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/08/2023 | 11/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/19/2023 | 10/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/19/2023 | 10/19/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/21/2023 | 07/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/21/2023 | 07/24/2023 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 07/21/2023 | 07/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/21/2023 | 07/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/21/2023 | 07/28/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/01/2023 | 06/02/2023 |
| Note: 1. The SF on the energy calcs varies from the floor plan SF. Please cure. 107.2.6 2. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 06/01/2023 | 06/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/01/2023 | 06/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/01/2023 | 06/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/01/2023 | 06/01/2023 |
| LOCATE | COMPLETE | 06/01/2023 | 06/02/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/01/2023 | 06/05/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R5 insulation in walls and R30 in vented attic. Energy Calcs say R8 insulation in walls and R19 in unvented attic. Revised to match. 2. Energy calcs do not match the house plans. | |||
| SW1 | COMPLETE | 06/01/2023 | 06/12/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/01/2023 | 06/02/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need one additional tree for this lot size. | |||
| BADMIN | COMPLETE | 06/01/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/01/2023 | 08/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 06/01/2023 | 06/01/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation on site plan is 8' +/- below center of road elevation |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/23/2024 |
| CONNECTION FEES | ¤1,166.26 | 08/04/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/04/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/04/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/04/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/04/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/04/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/04/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/04/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/04/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/04/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/04/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/04/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/04/2023 |
| SURCHARGE FS 533.721 | ¤5.34 | 08/04/2023 |
| SURCHARGE - FS 468.631 | ¤8.01 | 08/04/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/04/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/04/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/04/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/04/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/04/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/04/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/04/2023 |
| SEWER CREDIT | (¤1,147.00) | 08/04/2023 |
| SEWER INSPECTION | ¤25.00 | 08/04/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/04/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/04/2023 |
| SITE PLAN 30 | ¤30.00 | 08/04/2023 |
| WATER- TURN ON | ¤25.00 | 08/04/2023 |
| ADJUSTMENT 50% | (¤533.91) | 08/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/04/2023 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 08/04/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 08/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,449.89 |