I want to search for...
Permit #2023060002
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00720-0030 |
| CONDITIONED SPACE: 2000 sqft |
| GARAGE: 476 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| OPENED PORCH (WITH ROOF) : 144 sqft |
| Total Square Footage: 2817 sqft |
| Block: 00720 |
| Subdivision: 0 - |
| Job Phone: 912-258-2201 |
| Location Address: 75 ULATURN TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/27/2023 |
| NOC: RECORDED |
| Applicant name: JAMES FUCETOLA III |
| Owner: PALM COAST COMMUNITIES LLC |
|
Address PO BOX 22547 ST SIMONS ISLAND, GA 31522 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤195,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PALM COAST COMMUNITIES LLC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 22547 PALM COAST, FL 32164 |
CBC1262878 (Exp: 08/31/2026) | 321-501-4617 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/01/2024 | FINAL APPROVED | BTAYLOR |
| U-CROSS CONNECTION | 04/01/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/01/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 04/01/24 INSPECTOR FOUND CRACK ACROSS DRIVEWAY AND RECOMMENDS REPAIRING CRACK BEFORE CO. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 04/01/2024 | APPROVED | TPOLACEK |
| Note: 04/01/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/01/2024 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/28/2024 | APPROVED | TPOLACEK |
| Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 1/26/24 REQUIRED CORRECTIONS MADE. READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. _______________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 RIGHT SIDE CULVERT PIPE NEEDS TO BE 8' FROM ROAD WAY EDGE TO CENTER OF CULVERT PIPE. LEFT SIDE FORM BOARD AT APRON END IS JUTTING INTO ROADWAY NEEDS TO BE BROUGHT BACK APPROX 3" AND CONFORM TO ROAD EDGE. Pipe not 8 ft/5 ft from road edge or missing 22 degree Elbow Swale Plan #2 Swale Plan #2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. PHOTOS FOR REFERENCE. NOT GOING TO FEE YOU TODAY. PLEASE MAKE CORRECTIONS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/28/2024 | APPROVED | TPOLACEK |
| Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U - SEWER TIE IN | 02/06/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 01/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/26/24 REQUIRED CORRECTIONS MADE. READY TO POUR AT THE TIME OF THIS INSPECTION. PIPE IS GOOD. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. _______________________________________________________________________________________________________________________ 1/23/2024 - PREVIOUS INSPECTION NOTES 1/23/24 RIGHT SIDE CULVERT PIPE NEEDS TO BE 8' FROM ROAD WAY EDGE TO CENTER OF CULVERT PIPE. LEFT SIDE FORM BOARD AT APRON END IS JUTTING INTO ROADWAY NEEDS TO BE BROUGHT BACK APPROX 3" AND CONFORM TO ROAD EDGE. Pipe not 8 ft/5 ft from road edge or missing 22 degree Elbow Swale Plan #2 Swale Plan #2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. PHOTOS FOR REFERENCE. NOT GOING TO FEE YOU TODAY. PLEASE MAKE CORRECTIONS. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/23/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 1/23/24 RIGHT SIDE CULVERT PIPE NEEDS TO BE 8' FROM ROAD WAY EDGE TO CENTER OF CULVERT PIPE. LEFT SIDE FORM BOARD AT APRON END IS JUTTING INTO ROADWAY NEEDS TO BE BROUGHT BACK APPROX 3" AND CONFORM TO ROAD EDGE. Pipe not 8 ft/5 ft from road edge or missing 22 degree Elbow Swale Plan #2 Swale Plan #2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. PHOTOS FOR REFERENCE. NOT GOING TO FEE YOU TODAY. PLEASE MAKE CORRECTIONS. | |||
| ELECTRIC - EARLY POWER | 01/12/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1-12-24 1. Emailed FPL at 2:38. | |||
| INSULATION | 12/08/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 11-22-23 1. Front left bedroom smoke alarm is to close to fresh air supply. Need to be 3' away from fresh air supply. Check at insulation. | |||
| ALL ROUGH | 11/22/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 11-22-23 1. Front left bedroom smoke alarm is to close to fresh air supply. Need to be 3' away from fresh air supply. Check at insulation. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/16/2023 | APPROVED | BTAYLOR |
| Note: 11/2/2023 - PREVIOUS INSPECTION NOTES 10/31/2023 - PREVIOUS INSPECTION NOTES 10/31/23: Inspection stopped. Permit box needs attention. * Incomplete & damaged plans in box for inspection. Please provide a new set before re-inspection. FBC 107.2.1 11-2-23 1. House is not ready for inspection. 2. Trade work should not be started until structural inspection is completed. | |||
| LATH/BRICK/ WATER BARRIER | 11/14/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 11/06/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/02/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 10/31/2023 - PREVIOUS INSPECTION NOTES 10/31/23: Inspection stopped. Permit box needs attention. * Incomplete & damaged plans in box for inspection. Please provide a new set before re-inspection. FBC 107.2.1 11-2-23 1. House is not ready for inspection. 2. Trade work should not be started until structural inspection is completed. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/31/2023 | Disapproved - NO FEE | RSIMS |
| Note: 10/31/23: Inspection stopped. Permit box needs attention. * Incomplete & damaged plans in box for inspection. Please provide a new set before re-inspection. FBC 107.2.1 | |||
| ROOF SHEATHING | 10/26/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 10/26/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 10/25/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/17/2023 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 09/29/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/27/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 09/27/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/03/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 11/08/2023 | 11/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/25/2023 | 10/25/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/25/2023 | 10/25/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/23/2023 | 10/23/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slabe elevation on foundation survey is 1.77' higher than elevation on revised site plan. Please revise and resubmit appropriate drawing and resubmit. | |||
| ZON | COMPLETE | 10/23/2023 | 10/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 09/13/2023 | 09/13/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Documents/Files named incorrectly and uploded under wrong document type. o Please rename your files in accordance with the naming convention outlined in our ‘document requirements’ located on the permit portal page http://docs.palmcoastgov.com/departments/building/online/document-requirements.pdf o It is important that all submittals follow the guidelines for efficient plan review and record retention accuracy. o You may add to your file name AFTER the above naming convention has been met. Examples Document type: Plans File name : Plans Document type: Foundation Survey File name: Foundation Survey Document type: Manufactures Specifications File Name: Pool Alarm Document type: Manufactures Specifications File Name: Generator | |||
| ENGIN1 | COMPLETE | 09/13/2023 | 09/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/13/2023 | 09/13/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/13/2023 | 09/13/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/17/2023 | 07/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/17/2023 | 07/19/2023 |
| Note: Released By: JPI | |||
| SW1 | COMPLETE | 06/12/2023 | 06/12/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/01/2023 | 06/02/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please remove the trees on the neighbors property on landscape plan On landscape plan the tree on right side is not labeled and it says Bahia sod but the note box states st. Augustine please change to the correct sod type. | |||
| BLD | HOLD | 06/01/2023 | 06/02/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the Truss Reactions Summary Sheet for each profile type. For ease of review, please label this file Truss Summary- Profiles or of a similar nomenclature. 107.3.5 | |||
| CUSVC | COMPLETE | 06/01/2023 | 06/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/01/2023 | 06/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/01/2023 | 06/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/01/2023 | 06/01/2023 |
| LOCATE | COMPLETE | 06/01/2023 | 06/02/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/01/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/01/2023 | 06/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/01/2023 | 07/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/04/2024 |
| CONNECTION FEES | ¤1,166.26 | 07/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/27/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/27/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/27/2023 |
| SURCHARGE FS 533.721 | ¤4.65 | 07/27/2023 |
| SURCHARGE - FS 468.631 | ¤6.98 | 07/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/27/2023 |
| SEWER INSPECTION | ¤25.00 | 07/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/27/2023 |
| SITE PLAN 30 | ¤30.00 | 07/27/2023 |
| WATER- TURN ON | ¤25.00 | 07/27/2023 |
| ADJUSTMENT 50% | (¤465.08) | 07/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/27/2023 |
| INSPECTION - RESIDENTIAL | ¤701.25 | 07/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤198.90 | 07/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,406.33 |