I want to search for...
Permit #2023060334
Permit Details
Status: COED
| Parcel Id: 42-10-30-3210-00000-3320 |
| CONDITIONED SPACE: 2727 sqft |
| GARAGE: 782 sqft |
| OPENED PORCH (WITH ROOF) : 390 sqft |
| OPENED PORCH (WITH ROOF) : 49 sqft |
| OPENED PORCH (WITH ROOF) : 169 sqft |
| Total Square Footage: 4117 sqft |
| Block: 00000 |
| Subdivision: 2094 - CONSERVATORY AT HAMMOCK BEACH |
| Job Phone: 386-447-4400 |
| Location Address: 105 ROSE PETAL CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2023 |
| NOC: RECORDED |
| Applicant name: DAVID PAUL CROCKETT |
| Owner: LITTLE ROBERT C & ANTOINETTE M H&W |
|
Address 16 SEA FLOWER PATH PALM COAST, FL 32164 |
| Lot: 3320 |
| Contracted Stated Job Value: ¤827,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SALTWATER HOMES INC
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| DECEASED |
138 PALM COAST PARKWAY PALM COAST, FL 32137 |
SUITE 328 PALM COAST, FL 32137 |
RG0041345 (Exp: 08/31/2025) | 386-447-4400 | 866-244-9639 |
Sub Contractors
ROBERT CARLTON LITTLE
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3050 EAST MOODY BLVD BUNNELL, FL 32110 |
EC13003740 (Exp: 08/31/2026) | 386-931-1708 |
MOISES MERINO DIAZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3104 ORANOLE ROAD ORLANDO, FL 32810 |
CAC1820980 (Exp: 08/31/2026) | 407-225-3149 |
PEDRO DANIEL CHINCHILLA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
324 COVENT GARDENS PL DELTONA, FL 32725 |
CCC1333997 (Exp: 08/31/2026) | 386-679-6228 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/24/2024 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 04/01/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: reclaim master backflow irrigatin-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 04/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/1/24 PAVERS ALL GLUED. NO BROKEN OR CRACKED PAVERS AT THE TIME OF THIS AFTER POUR INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/28/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/1/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ___________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/28/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/01/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/28/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 ** 02/9/24 READY TO SET PAVERS ** ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. _____________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED Inspector Notes from Inspection 9270 ** 02/9/24 READY TO SET PAVERS ** ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. _____________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/28/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/28/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/09/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/9/24 READY TO SET PAVERS ** ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. _____________________________________________________________________________________________________________________ 1/30/2024 - PREVIOUS INSPECTION NOTES ** 01/30/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED | |||
| ROW- PAVER RESTRAINTS | 01/30/2024 | APPROVED | EMADISON |
| Note: ** 10/10/23 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/30/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** 01/30/24 READY TO POUR APRON AND PAVER RESTRAINTS ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. ** SCHEDULE NEXT PRE-POUR INSPECTION ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET ANY PAVERS UNTIL THE NEXT PRE-POUR INSPECTION HAS BEEN APPROVED | |||
| ELECTRIC - EARLY POWER | 01/05/2024 | Approval - Private Provider | PPROVIDER |
| LATH/BRICK/ WATER BARRIER | 11/21/2023 | Approval - Private Provider | PPROVIDER |
| INSULATION | 11/21/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 11/13/2023 | Approval - Private Provider | PPROVIDER |
| FRAMING | 11/13/2023 | CANCELLED BY APPLICANT | WEB |
| ELECTRIC-TUG | 10/13/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/13/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 10/12/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/12/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 10/12/2023 | CANCELLED BY INSPECTOR | PPROVIDER |
| TIE BEAM / LINTEL | 09/08/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 08/28/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/08/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 08/04/2023 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 08/04/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THISWAS A VIRTUAL INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 07/19/2023 | APPROVED | CSTONE |
| WATER METER INSTALLATION REQUEST | 07/14/2023 | CANCELLED BY APPLICANT | WEB |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/28/2023 | 08/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/28/2023 | 08/28/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/28/2023 | 07/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/25/2023 | 07/28/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 07/18/2023 | 07/18/2023 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Notice to private provider is completed incorrectly. Printed name of corporation at the top. print name in middle is for the applicant name (not saltwater) The certificates of insurance for the private provider is to be submitted with each notice to building offiical. | |||
| BLD | COMPLETE | 07/07/2023 | 07/07/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/06/2023 | 07/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/06/2023 | 07/06/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| ELEC | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/15/2023 | 06/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs and Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition (Second Request) | |||
| BLD | HOLD | 06/15/2023 | 06/19/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| SW1 | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/08/2023 | 06/14/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/07/2023 | 06/10/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 06/07/2023 | 06/09/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/07/2023 | 06/09/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to have a service outlet in the attic ith the AHU. NEC 2017 210.63 | |||
| ENGIN1 | COMPLETE | 06/07/2023 | 06/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/07/2023 | 06/07/2023 |
| LOCATE | COMPLETE | 06/07/2023 | 06/09/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/07/2023 | 06/09/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | HOLD | 06/07/2023 | 06/14/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM CANT READ THE SITE PLAN ALL NUMBER ARE BLURRY | |||
| ZON | COMPLETE | 06/07/2023 | 06/08/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/07/2023 | 06/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 04/30/2024 |
| INSPECTION - RESIDENTIAL | ¤2,274.25 | 07/12/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤645.06 | 07/12/2023 |
| CONNECTION FEES | ¤25.00 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/12/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/12/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/12/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/12/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/12/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/12/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/12/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/12/2023 |
| SURCHARGE FS 533.721 | ¤14.75 | 07/12/2023 |
| SURCHARGE - FS 468.631 | ¤22.12 | 07/12/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/12/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/12/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/12/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/12/2023 |
| SEWER INSPECTION | ¤25.00 | 07/12/2023 |
| SITE PLAN 30 | ¤30.00 | 07/12/2023 |
| WATER-METER | ¤505.39 | 07/12/2023 |
| ADJUSTMENT 50% | (¤1,474.66) | 07/12/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/12/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,170.58 |