I want to search for...

Permit #2023060379

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-01060-0320
CONDITIONED SPACE: 1363 sqft
GARAGE: 409 sqft
SCREEN PORCH (SOLID ROOF) : 64 sqft
Total Square Footage: 1836 sqft
Block: 01060
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 321-200-7145
Location Address: 33 LONDON DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/05/2023
NOC: RECORDED
Applicant name: JAMES BOWIE CLARK
Owner: K HOVNANIAN ASPIRE AT PALM COAST LLC

Address

SUITE 260

MAITLAND, FL 32751

Address

2301 LUCIEN WAY

MAITLAND, FL 32751

Lot: 0320
Contracted Stated Job Value: ¤110,403.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

K HOVNANIAN FLORIDA OPERATIONS LLC
Status Location Address State License Number Phone
ACTIVE

2301 LUCIEN WAY, STE 260

MAITLAND, FL 32751

CBC1263047 (Exp: 08/31/2026) 561-735-2806

Sub Contractors

JOHN BRADLEY WINFREY JR
Status Location Address State License Number Phone Fax
ACTIVE

1685 S. CLARA AVE

Deland, FL 32720

CFC054901 (Exp: 08/31/2026) 386-734-0154 386-734-2751
JAMES MICHAEL WATSON
Status Location Address State License Number Phone
INACTIVE

38115 YALE CIRCLE

LEESBURG, FL 34748

SCC131152841 (Exp: 08/31/2026) 352-434-0115
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/31/2024 Disapproved - NO FEE JSTEWART
Note: *** NOTES ADDED BY JSTEWART 5/31/2024 10:41:47 AM *** 1. Please install power mast boot flashing to specs. (sitting ontop of shingles). 2. Please seal hole in garage wall. Note: spoke with Super onsite, If above can be rectified today, I will accept a video Re inspection. via facetime, google meet.
BLD - BUILDING FINAL 05/31/2024 FINAL APPROVED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 5/31/2024 3:57:18 PM *** Video re inspect 5/31/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 5/31/2024 10:41:47 AM *** 1. Please install power mast boot flashing to specs. (sitting ontop of shingles). 2. Please seal hole in garage wall. Note: spoke with Super onsite, If above can be rectified today, I will accept a video Re inspection. via facetime, google meet.
ROW - STORMWATER FINAL 05/31/2024 APPROVED - AS NOTED GBERTOLA
Note: 05/30/24= AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. need to remove the concrete and dirt inside the culvert pipe *** NOTES ADDED BY RGROSS 5/29/2024 7:53:10 AM *** Please also make sure the property line damage to the sod is also repaired between 31 and the new home. *** NOTES ADDED BY RGROSS 5/29/2024 7:44:03 AM *** Caller at 31 says that the builder has destroyed several feet of his swale. Please be sure that all swale damage to adjacent lots are repaired. rjg. NOTE: 12/21/23. Please double check that the storm water does not impact either neighbor on either side and that the swale matches grade. Both homeowners were "infill" lot issues during construction. 1/11/24 See note on failed drainage inspection dated 1/11/24.
U -UTILITY RESIDENTIAL FINAL 05/31/2024 FINAL APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 05/30/2024 APPROVED GBERTOLA
Note: CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 5/30/24=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 YOUR SUBMITTED FINAL SURVEY HAS NOT CHANGED OTHER THAN ADDING THE FFE FOR THE TWO (2) ADJACENT PROPERTIES IN THE REAR PUTTING ARROWS DOES NOT CHANGE THE DRAINAGE ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/13/2024 7:52:41 AM *** ** 05/13/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE AS YOUR ELEVATION SHOTS YOU HAVE SAY THEY ARE AT THE TOP OF CULVERT NEED TO BE FROM BOTTOM OF CULVERT ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 02/29/24 PLEASE BACKFILL ALONG FORM BOARDS TO PREVENT OVER POUR. THIS IS PART OF THE AFTERPOUR INSPECTION TO MAKE SURE THERE IS NO OVER POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 THERE NEEDS TO BE AN APPROVED FINAL SURVEY BEFORE THE FIELD SURVEY INSPECTION CAN BE CONDUCTED _______________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 THERE NEEDS TO BE AN APPROVED FINAL SURVEY BEFORE THE FIELD SURVEY INSPECTION CAN BE CONDUCTED
ROW - FINAL APRON (AFTER POUR) 05/30/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/30/2024 APPROVED - AS NOTED GBERTOLA
Note: 5/30/24=CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/29/2024 - PREVIOUS INSPECTION NOTES ** 05/29/24 YOUR SUBMITTED FINAL SURVEY HAS NOT CHANGED OTHER THAN ADDING THE FFE FOR THE TWO (2) ADJACENT PROPERTIES IN THE REAR PUTTING ARROWS DOES NOT CHANGE THE DRAINAGE ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/13/2024 7:52:41 AM *** ** 05/13/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE AS YOUR ELEVATION SHOTS YOU HAVE SAY THEY ARE AT THE TOP OF CULVERT NEED TO BE FROM BOTTOM OF CULVERT ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 02/29/24 PLEASE BACKFILL ALONG FORM BOARDS TO PREVENT OVER POUR. THIS IS PART OF THE AFTERPOUR INSPECTION TO MAKE SURE THERE IS NO OVER POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/29/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/29/24 YOUR SUBMITTED FINAL SURVEY HAS NOT CHANGED OTHER THAN ADDING THE FFE FOR THE TWO (2) ADJACENT PROPERTIES IN THE REAR PUTTING ARROWS DOES NOT CHANGE THE DRAINAGE ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/13/2024 7:52:41 AM *** ** 05/13/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE AS YOUR ELEVATION SHOTS YOU HAVE SAY THEY ARE AT THE TOP OF CULVERT NEED TO BE FROM BOTTOM OF CULVERT ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 02/29/24 PLEASE BACKFILL ALONG FORM BOARDS TO PREVENT OVER POUR. THIS IS PART OF THE AFTERPOUR INSPECTION TO MAKE SURE THERE IS NO OVER POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW FIELD SURVEY /GRADING CERTIFICATION 05/29/2024 Disapproved - NO FEE EMADISON
Note: ** 05/29/24 THERE NEEDS TO BE AN APPROVED FINAL SURVEY BEFORE THE FIELD SURVEY INSPECTION CAN BE CONDUCTED _______________________________________________________________________________________________________________________ 5/28/2024 - PREVIOUS INSPECTION NOTES ** 05/28/24 THERE NEEDS TO BE AN APPROVED FINAL SURVEY BEFORE THE FIELD SURVEY INSPECTION CAN BE CONDUCTED
ROW FIELD SURVEY /GRADING CERTIFICATION 05/28/2024 Disapproved - NO FEE EMADISON
Note: ** 05/28/24 THERE NEEDS TO BE AN APPROVED FINAL SURVEY BEFORE THE FIELD SURVEY INSPECTION CAN BE CONDUCTED
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/28/2024 Disapproved -FEE REQUIRED EMADISON
Note: ** 05/28/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN YOU PROPOSED AN "A" DRAINAGE YOUR FINAL SURVEY SHOWS YOU WILL IMPACT ADJACENT PROPERTIES ** FFE of adjacent improved properties. (F)Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(3) ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOU NEED ELEVATION SHOTS IN ROAD SIDE SWALE SHOWING DRAINAGE FLOW ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN . ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ 5/13/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY EMADISON 5/13/2024 7:52:41 AM *** ** 05/13/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE AS YOUR ELEVATION SHOTS YOU HAVE SAY THEY ARE AT THE TOP OF CULVERT NEED TO BE FROM BOTTOM OF CULVERT ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 02/29/24 PLEASE BACKFILL ALONG FORM BOARDS TO PREVENT OVER POUR. THIS IS PART OF THE AFTERPOUR INSPECTION TO MAKE SURE THERE IS NO OVER POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
U-CROSS CONNECTION 05/16/2024 APPROVED DHANEY
ROW FIELD SURVEY /GRADING CERTIFICATION 05/15/2024 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 05/15/2024 CANCELLED BY APPLICANT WEB
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/13/2024 Disapproved - NO FEE EMADISON
Note: *** NOTES ADDED BY EMADISON 5/13/2024 7:52:41 AM *** ** 05/13/24 YOUR FINAL SURVEY DOES NOT MATCH YOUR SUBMITTED PROPOSED LOT DRAINAGE SITE PLAN ** Section 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) ** Sec 300.01 D2 The elevations on all adjacent identified (e.g. vacant or improved etc.) properties at a minimum of 20 foot intervals on a 10 foot offset outside the property lines. All undeveloped properties must be properly identified on the site plan and Final Survey. There must be sufficient elevation shots to indicate the intended drainage pattern. ** Sec 300.02 B1 If the survey is incomplete, unclear, does not adequately show the drainage patterns, or if the constructed drainage is incorrect it will be promptly faxed or e-mailed back to the builder explaining the reason for the rejection. ** YOUR CULVERT IS SHOWING TO BE OUT OF TOLERANCE AS YOUR ELEVATION SHOTS YOU HAVE SAY THEY ARE AT THE TOP OF CULVERT NEED TO BE FROM BOTTOM OF CULVERT ** CONTRACTORS NEWSFLASH Grading and Final Surveys **April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work. Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development __________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 02/29/24 PLEASE BACKFILL ALONG FORM BOARDS TO PREVENT OVER POUR. THIS IS PART OF THE AFTERPOUR INSPECTION TO MAKE SURE THERE IS NO OVER POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
LATH/BRICK/ WATER BARRIER 05/10/2024 APPROVED FWILLIS
Note: 5/9/2024 - PREVIOUS INSPECTION NOTES VAPOR BARRIER being installed on post. Lath not installed yet, waiting for crew to arrive.
LATH/BRICK/ WATER BARRIER 05/09/2024 Disapproved - NO FEE FWILLIS
Note: VAPOR BARRIER being installed on post. Lath not installed yet, waiting for crew to arrive.
ALL ROUGH 05/09/2024 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/08/2024 APPROVED FWILLIS
Note: 5/6/2024 - PREVIOUS INSPECTION NOTES As per your request.
ROOF VALLEY & METAL 05/08/2024 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 05/06/2024 CANCELLED BY APPLICANT FWILLIS
Note: As per your request.
MONOLITHIC SLAB 05/01/2024 APPROVED FWILLIS
Note: 5/1/24 - FOOTER IN REAR FOR COLUMN, NOT SLAB. 4/30/2024 - PREVIOUS INSPECTION NOTES 4/30/24 - HOME IS COMPLETED, NO SLAB TO VIEW. 4/29/2024 - PREVIOUS INSPECTION NOTES As per your request
MONOLITHIC SLAB 04/30/2024 Disapproved - NO FEE FWILLIS
Note: 4/30/24 - HOME IS COMPLETED, NO SLAB TO VIEW. 4/29/2024 - PREVIOUS INSPECTION NOTES As per your request
MONOLITHIC SLAB 04/29/2024 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 04/29/2024 CANCELLED BY APPLICANT FWILLIS
Note: As per your request
GRAVITY SEWER TEST 03/13/2024 APPROVED MGIBSON
U - SEWER TIE IN 03/13/2024 APPROVED MGIBSON
ROW- PRE-APRON (PRE-POUR) 02/29/2024 APPROVED - AS NOTED TPOLACEK
Note: 02/29/24 PLEASE BACKFILL ALONG FORM BOARDS TO PREVENT OVER POUR. THIS IS PART OF THE AFTERPOUR INSPECTION TO MAKE SURE THERE IS NO OVER POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ELECTRIC - EARLY POWER 02/28/2024 APPROVED - AS NOTED JSTEWART
Note: 2/28/24- Authorize release of email to FPL @ 1:12p
PEP TANK INSTALLATION REQUEST 02/07/2024 APPROVED BVITALE
LATH/BRICK/ WATER BARRIER 01/30/2024 APPROVED FWILLIS
Note: 1/29/2024 - PREVIOUS INSPECTION NOTES 1-29-24 None of the notes below were resolved (Not ready, still working). New inspection due to canceled inspection 1/11/2024 - PREVIOUS INSPECTION NOTES 1/11/24-Please install water barrier at front entry door and rear slider at the margins. R703.4 ........All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exterior window and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier
LATH/BRICK/ WATER BARRIER 01/29/2024 Disapproved -FEE REQUIRED LMILLER
Note: 1-29-24 None of the notes below were resolved (Not ready, still working). New inspection due to canceled inspection 1/11/2024 - PREVIOUS INSPECTION NOTES 1/11/24-Please install water barrier at front entry door and rear slider at the margins. R703.4 ........All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exterior window and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier
LATH/BRICK/ WATER BARRIER 01/26/2024 CANCELLED BY APPLICANT WEB
Note: 1/11/2024 - PREVIOUS INSPECTION NOTES 1/11/24-Please install water barrier at front entry door and rear slider at the margins. R703.4 ........All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exterior window and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier
INSULATION 01/18/2024 APPROVED FWILLIS
Note: Inspector Notes from Inspection 2420 1/16/24- Please obtain revision of Product aproval for windows installed. will check at Insulation inspection.
ALL ROUGH 01/16/2024 APPROVED - AS NOTED JSTEWART
Note: 1/16/24- Please obtain revision of Product aproval for windows installed. will check at Insulation inspection.
LATH/BRICK/ WATER BARRIER 01/11/2024 Disapproved - NO FEE JSTEWART
Note: 1/11/24-Please install water barrier at front entry door and rear slider at the margins. R703.4 ........All flashing shall be applied in a manner to prevent the entry of water into the wall cavity or penetration of water to the building structural framing components. Selfadhered membranes used as flashing shall comply with AAMA 711...........(1) Flashing Exterior window and door openings. Flashing at exterior window and door openings shall extend to the surface of the exterior wall finish or to the water-resistive barrier
ROW - DRAINAGE 01/11/2024 Disapproved -FEE REQUIRED RGROSS
Note: Temporary Culvert is set too high. Large amount of ater still backing up to the neighbor on the left. Builder may need to regrade the left neighbors swale before the Final Stormwater Inspection. RESIDENT AT 31 SAYS CULVERT PIPE IS TOO HIGH AND WILL NOT ALLOW PROPER DRAINAGE PLS INSPECT MH
LATH/BRICK/ WATER BARRIER 01/09/2024 CANCELLED BY APPLICANT WEB
ROOF VALLEY & METAL 12/29/2023 APPROVED JSTEWART
WALL SHEATHING 12/29/2023 APPROVED JSTEWART
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/29/2023 APPROVED JSTEWART
FOUND SURVEY APPROVED (OFFICE) 12/28/2023 APPROVED TBAKER
TIE BEAM / LINTEL 12/20/2023 APPROVED BTAYLOR
Note: 12/19/2023 - PREVIOUS INSPECTION NOTES NOT READY YET.
TIE BEAM / LINTEL 12/19/2023 CANCELLED BY APPLICANT FWILLIS
Note: NOT READY YET.
MONOLITHIC SLAB 12/13/2023 APPROVED FWILLIS
Note: 12/12/2023 - PREVIOUS INSPECTION NOTES 12/12/23- No Termite cert. Garage side walls dont match plans FM02 sheet S1, and D1.
MONOLITHIC SLAB 12/12/2023 Disapproved - NO FEE JSTEWART
Note: 12/12/23- No Termite cert. Garage side walls dont match plans FM02 sheet S1, and D1.
PLUMBING 1ST ROUGH UNDERGROUND 12/07/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 11/08/2023 APPROVED CBOWERMASTER
Note: 11/7/2023 7:21:47 AM- PREVIOUS INSPECTION NOTES 11/2/2023 7:42:52 AM- PREVIOUS INSPECTION NOTES not cleared wooded lot logs on property
WATER METER INSTALLATION REQUEST 11/06/2023 Disapproved -FEE REQUIRED CBOWERMASTER
Note: 11/2/2023 7:42:52 AM- PREVIOUS INSPECTION NOTES not cleared wooded lot logs on property
WATER METER INSTALLATION REQUEST 11/01/2023 Disapproved -FEE REQUIRED CBOWERMASTER
Note: not cleared wooded lot

Review History

Department Status Date In Date Out
MECH COMPLETE 05/31/2024 05/31/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition (Second request)
MECH HOLD 05/29/2024 05/30/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition (Second request)
MECH HOLD 05/21/2024 05/23/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2023 8th Edition
BADMIN INFORMATION 05/09/2024 05/09/2024
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Unable to process final survey because there is an outstanding inspection scheduled today. Once inspection is passed please upload your final survey.
SW1 COMPLETE 03/20/2024 03/22/2024
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/20/2024 03/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/20/2024 03/20/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
SW1 HOLD 03/15/2024 03/15/2024
Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Staff will email marked up drawing.
SW1 COMPLETE 03/08/2024 03/15/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM
ENGIN1 COMPLETE 03/08/2024 03/11/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 03/08/2024 03/08/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 03/08/2024 03/14/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 02/16/2024 02/23/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Truss packet needs to have shop drawing approval stamp from Engineer of record
ELEC COMPLETE 02/16/2024 02/23/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 02/16/2024 02/16/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM elevation pge added covered porch already on site plan
SW1 HOLD 02/16/2024 02/27/2024
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM Your site plan should be similar to the file submitted previously (9/28/23). If you are submitting that file, please ensure that the adjacent driveway culverts and the following note regarding the PEP tank are included. "Final PEP location to be provided by the City of Palm Coast. The stormwater conveyance swales associated with the lot’s grading shall be diverted to go around the PEP lids/covers." Here are the missing items from the current submission: 1- Please include the proposed Finished Floor Elevations (FFE). 2- Please depict elevations on all adjacent property lines at 20-foot intervals. 3- Proposed elevations are missing 4- Please include flow arrows. 5- The drainage from the structure is to have a minimum slope of 6 inches for the first 10' on the rear of the structure. 6- Please depict the culvert material and size.
ENGIN1 COMPLETE 02/16/2024 02/20/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
MECH COMPLETE 01/16/2024 01/18/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/27/2023 12/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/27/2023 12/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/27/2023 12/27/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 12/18/2023 12/18/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 12/18/2023 12/18/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 09/28/2023 09/28/2023
Note: Released By: JPI
MECH COMPLETE 09/28/2023 10/02/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 09/28/2023 09/28/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/28/2023 09/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/28/2023 09/28/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 09/13/2023 09/14/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH HOLD 09/13/2023 09/18/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide name and license number of listed mechanical contractor on Duct layout.
BLD HOLD 09/13/2023 09/15/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
SW1 HOLD 09/13/2023 09/19/2023
Note: Held By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM NEED TO DISTINGUISH BETWEEN ALL EXISTING ELEVATIONS FROM PROPOSED ELEVATION SHOTS
ENGIN1 COMPLETE 09/13/2023 09/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 07/27/2023 07/27/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment: Ac pad must be screened with 7 gallon shrubs
BLD HOLD 07/27/2023 07/31/2023
Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
MECH HOLD 07/27/2023 07/27/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Duct layout needs to be signed by the AC contractor
SW1 HOLD 07/27/2023 08/04/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO HAVE PROPOSED ELEVATIONS ON SITE PLAN
ENGIN1 COMPLETE 07/27/2023 07/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 06/08/2023 06/10/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 06/08/2023 06/12/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/08/2023 06/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/08/2023 06/08/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/08/2023 06/08/2023
LOCATE COMPLETE 06/08/2023 06/09/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 06/08/2023 06/12/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload and duct layout signed by the AC contractor
SW1 HOLD 06/08/2023 06/14/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items.
ZON HOLD 06/08/2023 06/09/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan missing walkway width Landscape plan must show sod type and if irrigation will be installed Landscape plan must show all required trees and their types Landscape plan must show all required foundation plantings and the types being used with the gallon sizes Must have a minimum of eight along the front and four along each side wrapping each front corner Ac pad must be screened with 7 gallon shrubs
SWALE COMPLETE 06/08/2023 07/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 06/02/2024
REINSPECTION RESIDENTIAL ¤40.00 03/19/2024
REINSPECTION FEE ¤40.00 03/19/2024
REINSPECTION FEE ¤40.00 03/19/2024
SW ENG - INSPECTION 20 ¤20.00 03/19/2024
SW ENG - INSPECTION 20 ¤20.00 03/19/2024
PLAN REVIEW - REVISION ¤32.50 03/19/2024
SW ENG INSPECTION 80 ¤80.00 10/05/2023
SW ENG PRE APRON ¤30.00 10/05/2023
SW ENG - REVIEW 20 ¤20.00 10/05/2023
SW ENG RES REVIEW 200 ¤200.00 10/05/2023
SEWER CREDIT (¤627.26) 10/05/2023
SEWER INSPECTION ¤25.00 10/05/2023
SEWER CAPITAL FACILITY ¤5,344.82 10/05/2023
WATER CREDIT (¤42.80) 10/05/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 10/05/2023
SITE PLAN 30 ¤30.00 10/05/2023
SURCHARGE FS 533.721 ¤3.17 10/05/2023
SURCHARGE - FS 468.631 ¤4.75 10/05/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/05/2023
WATER- TURN ON ¤25.00 10/05/2023
ADJUSTMENT 50% (¤316.82) 10/05/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/05/2023
INSPECTION - RESIDENTIAL ¤470.25 10/05/2023
PLAN REVIEW - RESIDENTIAL ¤133.38 10/05/2023
CONNECTION FEES ¤1,166.26 10/05/2023
FC IMPACT FEE EMS ¤62.00 10/05/2023
IMPACT FEE FIRE ¤420.52 10/05/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/05/2023
FC IMPACT FEE LIBRARY ¤268.00 10/05/2023
IMPACT FEE PARKS ¤1,769.15 10/05/2023
IMPACT FEE SCHOOL ¤5,450.00 10/05/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 10/05/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/05/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,769.30