I want to search for...
Permit #2023060441
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00180-0140 |
| CONDITIONED SPACE: 2208 sqft |
| GARAGE: 438 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| Total Square Footage: 2843 sqft |
| Block: 00180 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 386-445-9009 |
| Location Address: 22 FLEMINGWOOD LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/20/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: BRANDON TYLER EDWARD |
|
Address 2 FLAXTON LANE PALM COAST, FL 32137 |
| Lot: 0140 |
| Contracted Stated Job Value: ¤309,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/09/2024 | FINAL APPROVED | JSTEWART |
| U-CROSS CONNECTION | 04/09/2024 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 04/09/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/05/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE --------------------------------------------------------------------- 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 SURVEY SHOWS ONLY 5 HUNDRETHS FALL OFF THE REAR OF THE STRUCTURE. COPC REQUIRES 6 TENTHS WITHIN 10FT UNLESS OTERWISE PRE APPROVED. FROM THERE IT CONTINUES TO THE REAR OF PROPERTY SHOWING IT FLOWING ONTO NEIGHBORING PROPERTY. IN THE SITE PLAN IT SHOWS THERE IS TO BE A SWALE/BERM TO DIRECT THIS DRAINAGE TO THE RIGHT DOWN TOWARDS THE ROADSIDE SWALE. I DO NOT SEE ANY ELEVATION NUMBERS INDICATING THIS ON THE FINAL SURVEY. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Negatively impact Section 300.01 (A)(1)(C)(6) Section 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 02/27/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/05/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/05/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/05/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/27/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 3/27/24 SURVEY SHOWS ONLY 5 HUNDRETHS FALL OFF THE REAR OF THE STRUCTURE. COPC REQUIRES 6 TENTHS WITHIN 10FT UNLESS OTERWISE PRE APPROVED. FROM THERE IT CONTINUES TO THE REAR OF PROPERTY SHOWING IT FLOWING ONTO NEIGHBORING PROPERTY. IN THE SITE PLAN IT SHOWS THERE IS TO BE A SWALE/BERM TO DIRECT THIS DRAINAGE TO THE RIGHT DOWN TOWARDS THE ROADSIDE SWALE. I DO NOT SEE ANY ELEVATION NUMBERS INDICATING THIS ON THE FINAL SURVEY. Drainage from the structure Section 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ Negatively impact Section 300.01 (A)(1)(C)(6) Section 300.01 (A)(1)(C)(6). The subject lots drainage must not negatively impact any adjacent property. (B) __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 ** 02/27/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 02/27/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/27/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 02/23/2024 | APPROVED | AGAETANO |
| INSULATION | 12/04/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 11-29-2023 1. Head test failed. 2. Electric line underground not installed at kitchen island. Check both at insulation. | |||
| ALL ROUGH | 11/29/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 11-29-2023 1. Head test failed. 2. Electric line underground not installed at kitchen island. Check both at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 11/21/2023 | APPROVED | AGAETANO |
| Note: 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23: 1). No address as required by FBC 319.1 / 501.2 2). Wire lath on the right side columns & at the gable above the entry door are installed in the wrong direction. Per the manufacturer, The Stucco Institute & ASTM C1063 wire lath must be installed perpendicular to framing. 3). All 4 sides of the house have holes in the cinder block that are missing wire lath at low voltage wires, plumbing, outlet boxes, etc. as required to prevent weak spots in the stucco. | |||
| LATH/BRICK/ WATER BARRIER | 11/16/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/16/23: 1). No address as required by FBC 319.1 / 501.2 2). Wire lath on the right side columns & at the gable above the entry door are installed in the wrong direction. Per the manufacturer, The Stucco Institute & ASTM C1063 wire lath must be installed perpendicular to framing. 3). All 4 sides of the house have holes in the cinder block that are missing wire lath at low voltage wires, plumbing, outlet boxes, etc. as required to prevent weak spots in the stucco. | |||
| ROOF VALLEY & METAL | 11/06/2023 | APPROVED | AGAETANO |
| WALL SHEATHING | 10/25/2023 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/25/2023 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 10/12/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/28/2023 | APPROVED | AGAETANO |
| MONOLITHIC SLAB | 09/01/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 09-01-2023 1. Organic material in garage slab area. 2. UFER ground not visible. | |||
| MONOLITHIC SLAB | 09/01/2023 | APPROVED | AGAETANO |
| Note: 9/1/2023 - PREVIOUS INSPECTION NOTES 09-01-2023 1. Organic material in garage slab area. 2. UFER ground not visible. Superintendent addressed the issues. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/16/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 8/15/2023 - PREVIOUS INSPECTION NOTES NEED TO HAVE STAMPED APPROVED PLANS ON SITE, WITH ADDRESS POSTED CLEARLY ADDRESS STILL NOT POSTED ON POST OF PERMIT BOX. NEEDS TO BE DONE BY NEXT INSPECTION | |||
| GRAVITY SEWER TEST | 08/15/2023 | APPROVED | MGIBSON |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/15/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NEED TO HAVE STAMPED APPROVED PLANS ON SITE, WITH ADDRESS POSTED CLEARLY | |||
| U - SEWER TIE IN | 08/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 07/12/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 06/12/2023 | 06/16/2023 |
| Note: Released By: CAROL MINI - - CJMINI@PALMCOASTGOV.COM JM 6/15/2023 No active Gopher Tortoise burrows were found. Staff recommends installing silt fence around the perimeter to keep any new GT's from entering the property. | |||
| BLD | COMPLETE | 06/09/2023 | 06/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/09/2023 | 06/13/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/09/2023 | 06/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/09/2023 | 06/09/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/09/2023 | 06/09/2023 |
| LOCATE | COMPLETE | 06/09/2023 | 06/13/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/09/2023 | 06/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/09/2023 | 06/14/2023 |
| Note: Released By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/09/2023 | 06/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/09/2023 | 07/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/03/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/03/2024 |
| CONNECTION FEES | ¤1,166.26 | 06/20/2023 |
| WATER- TURN ON | ¤25.00 | 06/20/2023 |
| ADJUSTMENT 50% | (¤560.39) | 06/20/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/20/2023 |
| INSPECTION - RESIDENTIAL | ¤849.75 | 06/20/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤241.02 | 06/20/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/20/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/20/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/20/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/20/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/20/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/20/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/20/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/20/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/20/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/20/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/20/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/20/2023 |
| SURCHARGE FS 533.721 | ¤5.60 | 06/20/2023 |
| SURCHARGE - FS 468.631 | ¤8.41 | 06/20/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/20/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/20/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/20/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/20/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/20/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/20/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/20/2023 |
| SEWER CREDIT | (¤1,147.00) | 06/20/2023 |
| SEWER INSPECTION | ¤25.00 | 06/20/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/20/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/20/2023 |
| SITE PLAN 30 | ¤30.00 | 06/20/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,417.02 |