I want to search for...
Permit #2023060483
Permit Details
Status: COED
| Parcel Id: 07-11-31-7021-00160-0300 |
| CONDITIONED SPACE: 2208 sqft |
| GARAGE: 438 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| Total Square Footage: 2843 sqft |
| Block: 00160 |
| Subdivision: - |
| Job Phone: 386-445-9009 |
| Location Address: 54 WELLING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/15/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PARKWAY SUITE 7 PALM COAST, FL 32164 |
| Lot: 0300 |
| Contracted Stated Job Value: ¤300,000.00 |
| Job Description: single family residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/07/2024 | FINAL APPROVED | MKRASKI |
| U-CROSS CONNECTION | 02/07/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 02/07/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 01/30/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/30/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. -------------------------------------------------------------------------------------------- 1/29/2024 - PREVIOUS INSPECTION NOTES SURVEY SHOWS THAT THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED TO YOU. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/30/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 01/30/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/29/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: SURVEY SHOWS THAT THE CULVERT PIPE IS OUT OF TOLERANCE WITH THE SWALE PLAN DETAIL THAT WAS PROVIDED TO YOU. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/08/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------------- 12/7/2023 - PREVIOUS INSPECTION NOTES 1) THE SOIL IN DRIVEWAY POURING AREA IS TO SOFT IN AREAS NEED TO COMPACT SOIL MORE. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) 2) NEED TO HAVE #4 RABAR ON SITE AT THE TIME OF THE INSPECTION. SEE DIAGRAM Sec 300.E / 300.H 3) THERE ARE AREAS IN SIDEWALK GOING TO THE FRONT DOOR THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 4" IN SIDWALKS AND ALL AREAS ABOVE THE RIGHT OF WAY. Sec 400.02 Sidewalks constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. 4) NEED TO PUT DIRT ON THE OUTSIDE OF FORM BOARDS SO ALL CONCRETE WILL STAY IN POURING AREA | |||
| ROW- PRE-APRON (PRE-POUR) | 12/07/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THE SOIL IN DRIVEWAY POURING AREA IS TO SOFT IN AREAS NEED TO COMPACT SOIL MORE. DRAWING #300 G (3) SOIL SUBGRADE TO BE COMPACTED TO 95% PROCTOR DENSITY (PER ASTM D 1557) 2) NEED TO HAVE #4 RABAR ON SITE AT THE TIME OF THE INSPECTION. SEE DIAGRAM Sec 300.E / 300.H 3) THERE ARE AREAS IN SIDEWALK GOING TO THE FRONT DOOR THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE. NEED TO HAVE A MINIMUM OF 4" IN SIDWALKS AND ALL AREAS ABOVE THE RIGHT OF WAY. Sec 400.02 Sidewalks constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk shall be a minimum of 4" thick concrete. Sidewalks at driveway/turnout crossings shall be a minimum of 6" thick concrete. 4) NEED TO PUT DIRT ON THE OUTSIDE OF FORM BOARDS SO ALL CONCRETE WILL STAY IN POURING AREA | |||
| ELECTRIC - EARLY POWER | 12/01/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: Emailed FPL @ 1pm | |||
| ELECTRIC - EARLY POWER | 11/30/2023 | CANCELLED BY APPLICANT | MKRASKI |
| GRAVITY SEWER TEST | 10/27/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 10/27/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 10/20/2023 | APPROVED | MKRASKI |
| LATH/BRICK/ WATER BARRIER | 10/18/2023 | Disapproved - NO FEE | RSIMS |
| Note: 10/18/23: * 2 columns on the right side have wire lath that is installed in the wrong orientation. Per the manufacturer and Stucco Institute wire lath must be installed horizontally so that the keys catch the stucco. | |||
| INSULATION | 10/12/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 10/09/2023 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 10/03/2023 | APPROVED | MKRASKI |
| ROOF VALLEY & METAL | 09/28/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Drip edge must be a min. of 3'' overlap FBC R905.2.8.5 | |||
| WALL SHEATHING | 09/22/2023 | APPROVED | JWALKER |
| Note: 9/21/2023 - PREVIOUS INSPECTION NOTES 9/21/23 No repairs made Wall sheathing required to be nailed every 6'' on edges and 12'' in feild | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/21/2023 | APPROVED | MKRASKI |
| WALL SHEATHING | 09/21/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 9/21/23 No repairs made Wall sheathing required to be nailed every 6'' on edges and 12'' in feild | |||
| WALL SHEATHING | 09/20/2023 | Disapproved - NO FEE | MKRASKI |
| Note: Wall sheathing not nailed off properly | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/20/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. L50s missing on over framing per plans 2. Straps missing blocking on over framing per plans 3. Load bearing wall missing anchors per plans 4. Knee wall at front entry missing 2x4 tapconed to block per plans 5. Truss T13 missing engineering All marked on plans | |||
| TIE BEAM / LINTEL | 09/05/2023 | APPROVED | MKRASKI |
| FOUND SURVEY APPROVED (OFFICE) | 09/01/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/22/2023 | APPROVED | MKRASKI |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/21/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/25/2023 | APPROVED | CBOWERMASTER |
| Note: 7/24/2023 8:24:04 AM- PREVIOUS INSPECTION NOTES | |||
| WATER METER INSTALLATION REQUEST | 07/20/2023 | Disapproved - NO FEE | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| MECH | HOLD | 02/01/2024 | 02/01/2024 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2023 8Th edition | |||
| MECH | COMPLETE | 02/01/2024 | 02/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/10/2024 | 01/12/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/10/2024 | 01/10/2024 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Enclosed covered lanai | |||
| ELEC | COMPLETE | 01/10/2024 | 01/17/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | CANCEL | 01/10/2024 | 01/12/2024 |
| ENGIN1 | COMPLETE | 09/01/2023 | 09/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/01/2023 | 09/01/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/12/2023 | 07/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/11/2023 | 06/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/11/2023 | 06/13/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/11/2023 | 06/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/11/2023 | 06/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/11/2023 | 06/12/2023 |
| LOCATE | COMPLETE | 06/11/2023 | 06/14/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/11/2023 | 06/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/11/2023 | 06/14/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/11/2023 | 06/12/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/07/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/07/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/15/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/15/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/15/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/15/2023 |
| SEWER CREDIT | (¤1,147.00) | 06/15/2023 |
| SEWER INSPECTION | ¤25.00 | 06/15/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/15/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/15/2023 |
| SITE PLAN 30 | ¤30.00 | 06/15/2023 |
| WATER- TURN ON | ¤25.00 | 06/15/2023 |
| ADJUSTMENT 50% | (¤544.50) | 06/15/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/15/2023 |
| INSPECTION - RESIDENTIAL | ¤825.00 | 06/15/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤234.00 | 06/15/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/15/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/15/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/15/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/15/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/15/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/15/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/15/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/15/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/15/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/15/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/15/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/15/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/15/2023 |
| SURCHARGE FS 533.721 | ¤5.45 | 06/15/2023 |
| SURCHARGE - FS 468.631 | ¤8.17 | 06/15/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/15/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/15/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/15/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,363.25 |