Permit #2023060497

Permit Details

Status: COED

Parcel Id: 07-11-31-7037-00200-0160
CONDITIONED SPACE: 2134 sqft
GARAGE: 422 sqft
OPENED PORCH (WITH ROOF) : 16 sqft
Total Square Footage: 2572 sqft
Block: 00200
Subdivision: 2176 - SECTION 37-LAKEVIEW
Job Phone: 321-610-5217
Location Address: 7 LYTTON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/21/2023
NOC: RECORDED
Applicant name: RICHARD ANDREW FADIL
Owner: HOLIDAY BUILDERS INC

Address

2293 WEST EAU GALLIE BLVD

MELBOURNE, FL 32935

Lot: 0160
Contracted Stated Job Value: ¤250,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

HOLIDAY BUILDERS INC
Status Location Address State License Number Phone
ACTIVE

2293 W EAU GALLIE BLVD

MELBOURNE, FL 32935

CGC058770 (Exp: 08/31/2026) 407-745-3797

Sub Contractors

PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
VERNON JACK SMITH III
Status Location Address State License Number Phone Fax
ACTIVE

224 KIRKLAND ROAD

NEW SMYRNA BEACH, FL 32169

EC13004432 (Exp: 08/31/2026) 386-409-3616 386-409-3616
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
MICHAEL G MORELLO JR
Status Location Address State License Number Phone Fax
CANCEL

2 HARGROVE GRADE

PALM COAST, FL 32137

CAC014293 (Exp: 08/31/2014) (386)447-3950 (386)446-4614

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 11/29/2023 APPROVED TPOLACEK
Note: 11/29/2023 ** BUILDER MADE CORRECTIONS AS NOTED IN PREVIOUS INSPECTION _____________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 RIGHT SIDE SWALE NEEDS TO BE RE-ESTABLISHED AS THE CENTER OF THE SWALE NEEDS TO BE 8 FT AT CENTER FROM EDGE OF ROAD ** FLOW IN RIGHT SIDE SWALE IS INCONSISTANT WATER FLOWS FROM RIGHT TO LEFT SWALE NEEDS TO MATCH THE EXISTING GRADE OF THE ADJACENT SWALE WHICH WILL HOLD WATER AT CURRENT GRADE.
U -UTILITY RESIDENTIAL FINAL 11/16/2023 FINAL APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 11/15/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 11/15/2023 Disapproved -FEE REQUIRED EMADISON
Note: ** 11/15/23 RIGHT SIDE SWALE NEEDS TO BE RE-ESTABLISHED AS THE CENTER OF THE SWALE NEEDS TO BE 8 FT AT CENTER FROM EDGE OF ROAD ** FLOW IN RIGHT SIDE SWALE IS INCONSISTANT WATER FLOWS FROM RIGHT TO LEFT SWALE NEEDS TO MATCH THE EXISTING GRADE OF THE ADJACENT SWALE WHICH WILL HOLD WATER AT CURRENT GRADE.
BLD - BUILDING FINAL 11/15/2023 Disapproved - NO FEE JSTEWART
Note: 11/15/23- Please seal Tub and Shower at floor line.
BLD - BUILDING FINAL 11/15/2023 FINAL APPROVED JSTEWART
Note: 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23- Please seal Tub and Shower at floor line.
U-CROSS CONNECTION 11/14/2023 APPROVED DHANEY
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/13/2023 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 11/13/2023 APPROVED EMADISON
U - SEWER TIE IN 11/07/2023 APPROVED - AS NOTED MGIBSON
Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23-UNCOVER WORK TO BE INSPECTED..FBC...P2503.2, THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 11/07/2023 APPROVED - AS NOTED MGIBSON
Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23-P2503.4 Building sewer testing. No 5ft head,THIS WAS A VIRTUAL INSPECTION
ELECTRIC - EARLY POWER 11/03/2023 APPROVED - AS NOTED JSTEWART
Note: 11/3/23- Authorize release of email to FPL @ 8:31a
GRAVITY SEWER TEST 11/03/2023 Disapproved - NO FEE JSTEWART
Note: 11/3/23-P2503.4 Building sewer testing. No 5ft head,
ROW - DRAINAGE 11/03/2023 APPROVED - AS NOTED EMADISON
Note: ** 11/03/23 CONTRACTOR ON SITE ADDRESSING ROW DRAINAGE AT TIME OF THIS INSPECTION Inspector Notes from Inspection 9270 ** 10/31/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
U - SEWER TIE IN 11/03/2023 Disapproved - NO FEE JSTEWART
Note: 11/3/23-UNCOVER WORK TO BE INSPECTED..FBC...P2503.2,
ROW- PRE-APRON (PRE-POUR) 10/31/2023 APPROVED - AS NOTED EMADISON
Note: ** 10/31/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh.
INSULATION 10/02/2023 APPROVED AGAETANO
PEP TANK INSTALLATION REQUEST 10/02/2023 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 09/27/2023 APPROVED FWILLIS
ALL ROUGH 09/22/2023 APPROVED JSTEWART
Note: Inspector Notes from Inspection 2460 9/13/23 - FRONT ENTRYWAY HANGERS TO BE VIEWED AT ALL ROUGH. 9/12/2023 - PREVIOUS INSPECTION NOTES 9/12/23- No aproved plans onsite. R106.3.1 Approval of construction documents....“ REVIEWED FOR CODE COMPLIANCE.” framers are onsite framing walls and firring out.
WALL SHEATHING 09/13/2023 APPROVED FWILLIS
ROOF VALLEY & METAL 09/13/2023 APPROVED FWILLIS
Note: 9/12/2023 - PREVIOUS INSPECTION NOTES 9/12/23- Need Roof sheathing/braces/ties/down cells inspection aproved prior to roof valley metal
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/13/2023 APPROVED - AS NOTED FWILLIS
Note: 9/13/23 - FRONT ENTRYWAY HANGERS TO BE VIEWED AT ALL ROUGH. 9/12/2023 - PREVIOUS INSPECTION NOTES 9/12/23- No aproved plans onsite. R106.3.1 Approval of construction documents....“ REVIEWED FOR CODE COMPLIANCE.” framers are onsite framing walls and firring out.
ROOF VALLEY & METAL 09/12/2023 Disapproved - NO FEE JSTEWART
Note: 9/12/23- Need Roof sheathing/braces/ties/down cells inspection aproved prior to roof valley metal
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/12/2023 Disapproved -FEE REQUIRED JSTEWART
Note: 9/12/23- No aproved plans onsite. R106.3.1 Approval of construction documents....“ REVIEWED FOR CODE COMPLIANCE.” framers are onsite framing walls and firring out.
FOUND SURVEY APPROVED (OFFICE) 09/08/2023 APPROVED TBAKER
TIE BEAM / LINTEL 08/28/2023 APPROVED FWILLIS
MONOLITHIC SLAB 08/18/2023 APPROVED TSTAUFFACHER
PLUMBING 1ST ROUGH UNDERGROUND 08/16/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/03/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 11/16/2023 11/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/07/2023 09/08/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/07/2023 09/07/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 06/21/2023 06/21/2023
Note: Released By: JPI
MECH COMPLETE 06/21/2023 06/22/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 06/12/2023 06/13/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 06/12/2023 06/13/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/12/2023 06/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/12/2023 06/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/12/2023 06/12/2023
LOCATE COMPLETE 06/12/2023 06/14/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 06/12/2023 06/13/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show block wall w R4.1 insulation. Energy calcs say R13. Revise to match. 2. Wall type and insulation for adjacent wall is missing on Energy Calcs.
SW1 COMPLETE 06/12/2023 06/20/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 06/12/2023 06/12/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BADMIN COMPLETE 06/12/2023 06/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 06/12/2023 07/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 11/29/2023
PLAN REVIEW - REVISION ¤32.50 11/29/2023
SW ENG REINSPECTION 20 ¤20.00 11/29/2023
REINSPECTION RESIDENTIAL ¤40.00 11/15/2023
SW ENG - INSPECTION 20 ¤20.00 11/15/2023
SW ENG INSPECTION 80 ¤80.00 07/21/2023
SW ENG PRE APRON ¤30.00 07/21/2023
CONNECTION FEES ¤1,166.26 07/21/2023
WATER- TURN ON ¤25.00 07/21/2023
ADJUSTMENT 50% (¤463.31) 07/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/21/2023
INSPECTION - RESIDENTIAL ¤698.50 07/21/2023
PLAN REVIEW - RESIDENTIAL ¤198.12 07/21/2023
SW ENG - REVIEW 20 ¤20.00 07/21/2023
SW ENG RES REVIEW 200 ¤200.00 07/21/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/21/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/21/2023
SEWER CREDIT (¤1,140.07) 07/21/2023
SEWER INSPECTION ¤25.00 07/21/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/21/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/21/2023
SITE PLAN 30 ¤30.00 07/21/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/21/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/21/2023
FC IMPACT FEE EMS ¤62.00 07/21/2023
IMPACT FEE FIRE ¤420.52 07/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/21/2023
FC IMPACT FEE LIBRARY ¤268.00 07/21/2023
IMPACT FEE PARKS ¤1,769.15 07/21/2023
IMPACT FEE SCHOOL ¤5,450.00 07/21/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 07/21/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/21/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/21/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/21/2023
SURCHARGE FS 533.721 ¤4.63 07/21/2023
SURCHARGE - FS 468.631 ¤6.95 07/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,356.95