Status: COED
| Parcel Id: 07-11-31-7037-00200-0160 |
| CONDITIONED SPACE: 2134 sqft |
| GARAGE: 422 sqft |
| OPENED PORCH (WITH ROOF) : 16 sqft |
| Total Square Footage: 2572 sqft |
| Block: 00200 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 321-610-5217 |
| Location Address: 7 LYTTON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/21/2023 |
| NOC: RECORDED |
| Applicant name: RICHARD ANDREW FADIL |
| Owner: HOLIDAY BUILDERS INC |
|
Address 2293 WEST EAU GALLIE BLVD MELBOURNE, FL 32935 |
| Lot: 0160 |
| Contracted Stated Job Value: ¤250,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
HOLIDAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
2293 W EAU GALLIE BLVD MELBOURNE, FL 32935 |
CGC058770 (Exp: 08/31/2026) | 407-745-3797 |
Sub Contractors
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
VERNON JACK SMITH III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
224 KIRKLAND ROAD NEW SMYRNA BEACH, FL 32169 |
EC13004432 (Exp: 08/31/2026) | 386-409-3616 | 386-409-3616 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
MICHAEL G MORELLO JR
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
2 HARGROVE GRADE PALM COAST, FL 32137 |
CAC014293 (Exp: 08/31/2014) | (386)447-3950 | (386)446-4614 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 11/29/2023 | APPROVED | TPOLACEK |
| Note: 11/29/2023 ** BUILDER MADE CORRECTIONS AS NOTED IN PREVIOUS INSPECTION _____________________________________________________________________________________ 11/15/2023 - PREVIOUS INSPECTION NOTES ** 11/15/23 RIGHT SIDE SWALE NEEDS TO BE RE-ESTABLISHED AS THE CENTER OF THE SWALE NEEDS TO BE 8 FT AT CENTER FROM EDGE OF ROAD ** FLOW IN RIGHT SIDE SWALE IS INCONSISTANT WATER FLOWS FROM RIGHT TO LEFT SWALE NEEDS TO MATCH THE EXISTING GRADE OF THE ADJACENT SWALE WHICH WILL HOLD WATER AT CURRENT GRADE. | |||
| U -UTILITY RESIDENTIAL FINAL | 11/16/2023 | FINAL APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 11/15/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 11/15/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 11/15/23 RIGHT SIDE SWALE NEEDS TO BE RE-ESTABLISHED AS THE CENTER OF THE SWALE NEEDS TO BE 8 FT AT CENTER FROM EDGE OF ROAD ** FLOW IN RIGHT SIDE SWALE IS INCONSISTANT WATER FLOWS FROM RIGHT TO LEFT SWALE NEEDS TO MATCH THE EXISTING GRADE OF THE ADJACENT SWALE WHICH WILL HOLD WATER AT CURRENT GRADE. | |||
| BLD - BUILDING FINAL | 11/15/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 11/15/23- Please seal Tub and Shower at floor line. | |||
| BLD - BUILDING FINAL | 11/15/2023 | FINAL APPROVED | JSTEWART |
| Note: 11/15/2023 - PREVIOUS INSPECTION NOTES 11/15/23- Please seal Tub and Shower at floor line. | |||
| U-CROSS CONNECTION | 11/14/2023 | APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/13/2023 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/13/2023 | APPROVED | EMADISON |
| U - SEWER TIE IN | 11/07/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23-UNCOVER WORK TO BE INSPECTED..FBC...P2503.2, THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 11/07/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23-P2503.4 Building sewer testing. No 5ft head,THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC - EARLY POWER | 11/03/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 11/3/23- Authorize release of email to FPL @ 8:31a | |||
| GRAVITY SEWER TEST | 11/03/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 11/3/23-P2503.4 Building sewer testing. No 5ft head, | |||
| ROW - DRAINAGE | 11/03/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 11/03/23 CONTRACTOR ON SITE ADDRESSING ROW DRAINAGE AT TIME OF THIS INSPECTION Inspector Notes from Inspection 9270 ** 10/31/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| U - SEWER TIE IN | 11/03/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 11/3/23-UNCOVER WORK TO BE INSPECTED..FBC...P2503.2, | |||
| ROW- PRE-APRON (PRE-POUR) | 10/31/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/31/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ** Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| INSULATION | 10/02/2023 | APPROVED | AGAETANO |
| PEP TANK INSTALLATION REQUEST | 10/02/2023 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 09/27/2023 | APPROVED | FWILLIS |
| ALL ROUGH | 09/22/2023 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2460 9/13/23 - FRONT ENTRYWAY HANGERS TO BE VIEWED AT ALL ROUGH. 9/12/2023 - PREVIOUS INSPECTION NOTES 9/12/23- No aproved plans onsite. R106.3.1 Approval of construction documents....“ REVIEWED FOR CODE COMPLIANCE.” framers are onsite framing walls and firring out. | |||
| WALL SHEATHING | 09/13/2023 | APPROVED | FWILLIS |
| ROOF VALLEY & METAL | 09/13/2023 | APPROVED | FWILLIS |
| Note: 9/12/2023 - PREVIOUS INSPECTION NOTES 9/12/23- Need Roof sheathing/braces/ties/down cells inspection aproved prior to roof valley metal | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/13/2023 | APPROVED - AS NOTED | FWILLIS |
| Note: 9/13/23 - FRONT ENTRYWAY HANGERS TO BE VIEWED AT ALL ROUGH. 9/12/2023 - PREVIOUS INSPECTION NOTES 9/12/23- No aproved plans onsite. R106.3.1 Approval of construction documents....“ REVIEWED FOR CODE COMPLIANCE.” framers are onsite framing walls and firring out. | |||
| ROOF VALLEY & METAL | 09/12/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 9/12/23- Need Roof sheathing/braces/ties/down cells inspection aproved prior to roof valley metal | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/12/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 9/12/23- No aproved plans onsite. R106.3.1 Approval of construction documents....“ REVIEWED FOR CODE COMPLIANCE.” framers are onsite framing walls and firring out. | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/08/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/28/2023 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 08/18/2023 | APPROVED | TSTAUFFACHER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/16/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/03/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/16/2023 | 11/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/07/2023 | 09/08/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/07/2023 | 09/07/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/21/2023 | 06/21/2023 |
| Note: Released By: JPI | |||
| MECH | COMPLETE | 06/21/2023 | 06/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/12/2023 | 06/13/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 06/12/2023 | 06/13/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/12/2023 | 06/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/12/2023 | 06/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/12/2023 | 06/12/2023 |
| LOCATE | COMPLETE | 06/12/2023 | 06/14/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/12/2023 | 06/13/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show block wall w R4.1 insulation. Energy calcs say R13. Revise to match. 2. Wall type and insulation for adjacent wall is missing on Energy Calcs. | |||
| SW1 | COMPLETE | 06/12/2023 | 06/20/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/12/2023 | 06/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/12/2023 | 06/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/12/2023 | 07/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 11/29/2023 |
| PLAN REVIEW - REVISION | ¤32.50 | 11/29/2023 |
| SW ENG REINSPECTION 20 | ¤20.00 | 11/29/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 11/15/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 11/15/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/21/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/21/2023 |
| CONNECTION FEES | ¤1,166.26 | 07/21/2023 |
| WATER- TURN ON | ¤25.00 | 07/21/2023 |
| ADJUSTMENT 50% | (¤463.31) | 07/21/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/21/2023 |
| INSPECTION - RESIDENTIAL | ¤698.50 | 07/21/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤198.12 | 07/21/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/21/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/21/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/21/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/21/2023 |
| SEWER CREDIT | (¤1,140.07) | 07/21/2023 |
| SEWER INSPECTION | ¤25.00 | 07/21/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/21/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/21/2023 |
| SITE PLAN 30 | ¤30.00 | 07/21/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/21/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/21/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/21/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/21/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/21/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/21/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/21/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/21/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/21/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/21/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/21/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/21/2023 |
| SURCHARGE FS 533.721 | ¤4.63 | 07/21/2023 |
| SURCHARGE - FS 468.631 | ¤6.95 | 07/21/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/21/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,356.95 |