Permit #2023060509

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01140-0070
CONDITIONED SPACE: 2409 sqft
GARAGE: 841 sqft
OPENED PORCH (WITH ROOF) : 350 sqft
Total Square Footage: 3600 sqft
Block: 01140
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 904-338-1270
Location Address: 1 EDGEMONT LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/28/2023
NOC: RECORDED
Applicant name: DAVID VINCENT KIMBLE
Owner: DANIEL E MORRISON AND CAMMY J MORRISON

Address

27 RADIUM LANE

PALM COAST, FL 32164

Lot: 0070
Contracted Stated Job Value: ¤450,000.00
Job Description: Single Family Residence
Type: CN

Contractor

EVERLAST HOMES, INC
Status Location Address State License Number Phone
ACTIVE

13245 ATLANTIC BLVD

JACKSONVILLE, FL 32246

CBC1260552 (Exp: 08/31/2028) 904-545-6476

Sub Contractors

GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633
RUSSELL J CARTER
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 302

DELAND, FL 32721

CFC1425938 (Exp: 08/31/2026) 386-736-4220 386-736-4219
DEBORAH MAXINE JACKSON
Status Location Address State License Number Phone
ACTIVE

1165 SOUTH 5TH

MACCLENNY, FL 32063

CCC1330709 (Exp: 08/31/2026) 904-322-9409

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 04/09/2024 CANCELLED BY APPLICANT WEB
Note: 4/3/2024 - PREVIOUS INSPECTION NOTES 4/24/24 INSPECTORS NOTE...YOU WILL NEED TO CLEAN OUT ALL PAVERS AND DEBRIS FROM CULVERT PIPE AND FIX LOOSE PAVER ON LEFT SIDE OF THE DRIVEWAY BEFORE YOU WILL PASS YOUR ROW FINAL PASSING THIS INSPECTION AS NOTED THAT THESE CORRECTIONS WILL BE COMPLETED BEFORE ROW FINAL PASSAGE. I WILL NOT FEE YOU AS I WAS HERE FOR THE AFTERPOUR ALREADY. THE HOMEOWNER OF 3 EDGEMONT LANE AGREED FOR THE BUILDER EVERLAST TO ADD DIRT TO THE LEFT BACK SIDE OF THE PROPERTY LINE, LEVEL IT UP, AND SOD IT WITH BAHIA GRASS. per gbertola ON THE RIGHT SIDE OF THE PROPERTY, FACING THE HOUSE AND ON THE BACKYARD PROPERTY LINE, WE NEED TO CONSTRUCT A BERM AND A SWALE TO DIRECT THE STORMWATER TO THE FRONT SWALE. THE BUILDERS MUST REMOVE THE EXCESS DIRT ON THE RIGHT SIDE OF THE PROPERTY LINE, AND KEEP ALL THE DIRT ON THEIR PROPERTY
ROW - STORMWATER FINAL 04/08/2024 APPROVED TPOLACEK
Note: 04/08/24 ALL CORRECTIONS WERE MADE. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. New inspection due to canceled inspection 4/3/2024 - PREVIOUS INSPECTION NOTES 4/24/24 INSPECTORS NOTE...YOU WILL NEED TO CLEAN OUT ALL PAVERS AND DEBRIS FROM CULVERT PIPE AND FIX LOOSE PAVER ON LEFT SIDE OF THE DRIVEWAY BEFORE YOU WILL PASS YOUR ROW FINAL PASSING THIS INSPECTION AS NOTED THAT THESE CORRECTIONS WILL BE COMPLETED BEFORE ROW FINAL PASSAGE. I WILL NOT FEE YOU AS I WAS HERE FOR THE AFTERPOUR ALREADY. THE HOMEOWNER OF 3 EDGEMONT LANE AGREED FOR THE BUILDER EVERLAST TO ADD DIRT TO THE LEFT BACK SIDE OF THE PROPERTY LINE, LEVEL IT UP, AND SOD IT WITH BAHIA GRASS. per gbertola ON THE RIGHT SIDE OF THE PROPERTY, FACING THE HOUSE AND ON THE BACKYARD PROPERTY LINE, WE NEED TO CONSTRUCT A BERM AND A SWALE TO DIRECT THE STORMWATER TO THE FRONT SWALE. THE BUILDERS MUST REMOVE THE EXCESS DIRT ON THE RIGHT SIDE OF THE PROPERTY LINE, AND KEEP ALL THE DIRT ON THEIR PROPERTY
ROW- PROJECT STATUS 04/05/2024 APPROVED GBERTOLA
Note: BUILDER ASK ME TO CHECK THE PAVERS EVERYTHING IS GOOD AT THE TIME OF THE INSPECTION
ROW - FINAL APRON (AFTER POUR) 04/03/2024 APPROVED - AS NOTED FSLADISH
Note: 4/3/24 APPROVING AS NOTED. INSPECTORS NOTE...YOU WILL NEED TO CLEAN OUT ALL PAVERS AND DEBRIS FROM CULVERT PIPE AND FIX LOOSE PAVER ON LEFT SIDE OF THE DRIVEWAY BEFORE YOU WILL PASS YOUR ROW FINAL PASSING THIS INSPECTION AS NOTED THAT THESE CORRECTIONS WILL BE COMPLETED BEFORE ROW FINAL PASSAGE.
ROW - STORMWATER FINAL 04/03/2024 Disapproved - NO FEE FSLADISH
Note: 4/24/24 INSPECTORS NOTE...YOU WILL NEED TO CLEAN OUT ALL PAVERS AND DEBRIS FROM CULVERT PIPE AND FIX LOOSE PAVER ON LEFT SIDE OF THE DRIVEWAY BEFORE YOU WILL PASS YOUR ROW FINAL PASSING THIS INSPECTION AS NOTED THAT THESE CORRECTIONS WILL BE COMPLETED BEFORE ROW FINAL PASSAGE. I WILL NOT FEE YOU AS I WAS HERE FOR THE AFTERPOUR ALREADY. SEE PHOTO FOR REFERENCE THE HOMEOWNER OF 3 EDGEMONT LANE AGREED FOR THE BUILDER EVERLAST TO ADD DIRT TO THE LEFT BACK SIDE OF THE PROPERTY LINE, LEVEL IT UP, AND SOD IT WITH BAHIA GRASS. per gbertola ON THE RIGHT SIDE OF THE PROPERTY, FACING THE HOUSE AND ON THE BACKYARD PROPERTY LINE, WE NEED TO CONSTRUCT A BERM AND A SWALE TO DIRECT THE STORMWATER TO THE FRONT SWALE. THE BUILDERS MUST REMOVE THE EXCESS DIRT ON THE RIGHT SIDE OF THE PROPERTY LINE, AND KEEP ALL THE DIRT ON THEIR PROPERTY
BLD - BUILDING FINAL 04/01/2024 Approval - Private Provider PPROVIDER
U -UTILITY RESIDENTIAL FINAL 04/01/2024 FINAL APPROVED JHARDING
Note: Inspector Notes from Inspection 9035 No cross connections.
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/28/2024 APPROVED TPOLACEK
Note: 03/28/24 DRAINAGE WILL WORK AS INDICATED ON SURVEY AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW FIELD SURVEY /GRADING CERTIFICATION 03/28/2024 APPROVED TPOLACEK
Note: 03/28/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET.NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THE HOMEOWNER OF 3 EDGEMONT LANE AGREED FOR THE BUILDER EVERLAST TO ADD DIRT TO THE LEFT BACK SIDE OF THE PROPERTY LINE, LEVEL IT UP, AND SOD IT WITH BAHIA GRASS. per gbertola ON THE RIGHT SIDE OF THE PROPERTY, FACING THE HOUSE AND ON THE BACKYARD PROPERTY LINE, WE NEED TO CONSTRUCT A BERM AND A SWALE TO DIRECT THE STORMWATER TO THE FRONT SWALE. THE BUILDERS MUST REMOVE THE EXCESS DIRT ON THE RIGHT SIDE OF THE PROPERTY LINE, AND KEEP ALL THE DIRT ON THEIR PROPERTY
U-CROSS CONNECTION 03/28/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW- PROJECT STATUS 03/20/2024 APPROVED GBERTOLA
Note: CHEKING THE GRADE ON THE PROPERTY. NEED TO WAIT FOR FINAL SURVEY THE HOMEOWNER OF 3 EDGEMONT LANE AGREED FOR THE BUILDER EVERLAST TO ADD DIRT TO THE LEFT BACK SIDE OF THE PROPERTY LINE, LEVEL IT UP, AND SOD IT WITH BAHIA GRASS. ON THE RIGHT SIDE OF THE PROPERTY, FACING THE HOUSE AND ON THE BACKYARD PROPERTY LINE, WE NEED TO CONSTRUCT A BERM AND A SWALE TO DIRECT THE STORMWATER TO THE FRONT SWALE. THE BUILDERS MUST REMOVE THE EXCESS DIRT ON THE RIGHT SIDE OF THE PROPERTY LINE, AND KEEP ALL THE DIRT ON THEIR PROPERTY cheking the grade on the property
ROW- PROJECT STATUS 03/19/2024 APPROVED - AS NOTED GBERTOLA
Note: THE HOMEOWNER OF 3 EDGEMONT LANE AGREED FOR THE BUILDER EVERLAST TO ADD DIRT TO THE LEFT BACK SIDE OF THE PROPERTY LINE, LEVEL IT UP, AND SOD IT WITH BAHIA GRASS. ON THE RIGHT SIDE OF THE PROPERTY, FACING THE HOUSE AND ON THE BACKYARD PROPERTY LINE, WE NEED TO CONSTRUCT A BERM AND A SWALE TO DIRECT THE STORMWATER TO THE FRONT SWALE. THE BUILDERS MUST REMOVE THE EXCESS DIRT ON THE RIGHT SIDE OF THE PROPERTY LINE, AND KEEP ALL THE DIRT ON THEIR PROPERTY
ROW- PRE-APRON (PRE-POUR) 02/20/2024 APPROVED PFLANAGAN
Note: READY FOR PAVERS --------------------------------------------------------- 2/16/2024 - PREVIOUS INSPECTION NOTES 2/16/24= NEED TO INSTALL THE PAVER BASE ON SITE AND COMPACTED WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24 AT THIS TIME YOU APPROVED TO POUR THE DRIVEWAY APRON AND PAVER RESTRAINTS ONLY ****DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND APPROVED****. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24 YOU WILL NEED TO ADD A FORM BOARD ACROSS THE REAR ROW DRIVEWAY APRON. YOU NEED TO REMOVE YOU WILL NEED TO REMOVE THE FORM BOARD GOING ACROSS THE MITERED ENDS, THAT MUST BE ONE POUR. YOU WILL NEED TO DIG THE FRONT DRIVEWAY APRON DEEPER TO COPC PAVER DETAIL REQUIREMENTS TO GET THE REQUIRED DEPTH FOR CONCRETE, PAVER BASE AND PAVERS. IF YOU ARE UNSURE OF WHAT NEEDS TO BE CORRECTED, PLEASE CONTACT US AND WE WILL DO OUR BEST TO MEET YOU ON SITE AND REVIEW. THANK YOU. I WILL NOT FEE YOU TODAY. SEE PHOTOS FOR REFERENCE. 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24 POUR AREA TOO WET AND SOFT TO POUR AT THE TIME OF THIS INSPECTION. UNABLE TO SHOOT PIPE ELEVATIONS AS SITE IS UNDER WATE AT THIS TIME. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. MAKE SURE SITE IS DRY AND READY FOR INSPECTION WHEN YOU CALL IT BACK IN FOR REINSPECTION.
ROW- PRE-APRON (PRE-POUR) 02/20/2024 APPROVED PFLANAGAN
Note: READY FOR PAVERS ------------------------------------------------- 2/16/2024 11:09:10 AM- PREVIOUS INSPECTION NOTES 2/16/24= NEED TO INSTALL THE PAVER BASE ON SITE AND COMPACTED WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24 AT THIS TIME YOU APPROVED TO POUR THE DRIVEWAY APRON AND PAVER RESTRAINTS ONLY ****DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND APPROVED****. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24 YOU WILL NEED TO ADD A FORM BOARD ACROSS THE REAR ROW DRIVEWAY APRON. YOU NEED TO REMOVE YOU WILL NEED TO REMOVE THE FORM BOARD GOING ACROSS THE MITERED ENDS, THAT MUST BE ONE POUR. YOU WILL NEED TO DIG THE FRONT DRIVEWAY APRON DEEPER TO COPC PAVER DETAIL REQUIREMENTS TO GET THE REQUIRED DEPTH FOR CONCRETE, PAVER BASE AND PAVERS. IF YOU ARE UNSURE OF WHAT NEEDS TO BE CORRECTED, PLEASE CONTACT US AND WE WILL DO OUR BEST TO MEET YOU ON SITE AND REVIEW. THANK YOU. I WILL NOT FEE YOU TODAY. SEE PHOTOS FOR REFERENCE. 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24 POUR AREA TOO WET AND SOFT TO POUR AT THE TIME OF THIS INSPECTION. UNABLE TO SHOOT PIPE ELEVATIONS AS SITE IS UNDER WATE AT THIS TIME. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. MAKE SURE SITE IS DRY AND READY FOR INSPECTION WHEN YOU CALL IT BACK IN FOR REINSPECTION.
ELECTRIC - EARLY POWER 02/20/2024 Approval - Private Provider PPROVIDER
ROW- PRE-APRON (PRE-POUR) 02/16/2024 Disapproved - NO FEE GBERTOLA
Note: 2/16/24= NEED TO INSTALL THE PAVER BASE ON SITE AND COMPACTED WHEN INSTALLING THE SUB-BASE OR PAVER BASE SAND, YOU NEED TO CALL FOR A NEW INSPECTION ONCE COMPACTION IS DONE. THE BASE CAN NO LONGER BE LEFT IN A PILE ON-SITE AND MUST BE SPREAD AND COMPACTED BEFORE THE SECOND PART OF A PRE-POUR FOR PAVERS CAN BE APPROVED +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 2/9/2024 - PREVIOUS INSPECTION NOTES 2/9/24 AT THIS TIME YOU APPROVED TO POUR THE DRIVEWAY APRON AND PAVER RESTRAINTS ONLY ****DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND APPROVED****. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24 YOU WILL NEED TO ADD A FORM BOARD ACROSS THE REAR ROW DRIVEWAY APRON. YOU NEED TO REMOVE YOU WILL NEED TO REMOVE THE FORM BOARD GOING ACROSS THE MITERED ENDS, THAT MUST BE ONE POUR. YOU WILL NEED TO DIG THE FRONT DRIVEWAY APRON DEEPER TO COPC PAVER DETAIL REQUIREMENTS TO GET THE REQUIRED DEPTH FOR CONCRETE, PAVER BASE AND PAVERS. IF YOU ARE UNSURE OF WHAT NEEDS TO BE CORRECTED, PLEASE CONTACT US AND WE WILL DO OUR BEST TO MEET YOU ON SITE AND REVIEW. THANK YOU. I WILL NOT FEE YOU TODAY. SEE PHOTOS FOR REFERENCE. 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24 POUR AREA TOO WET AND SOFT TO POUR AT THE TIME OF THIS INSPECTION. UNABLE TO SHOOT PIPE ELEVATIONS AS SITE IS UNDER WATE AT THIS TIME. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. MAKE SURE SITE IS DRY AND READY FOR INSPECTION WHEN YOU CALL IT BACK IN FOR REINSPECTION.
ROW- PAVER RESTRAINTS 02/09/2024 APPROVED FSLADISH
Note: 2/9/24 YOU AR APPROVED TO POUR PAVER RESTRAINTS . ******* DO NOT LAY ANY PAVERS UNTIL AFTER SPREAD AND COMPACTION PREPOUR INSPECTION HASS BEEN PASSED**** MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 02/09/2024 PARTIALLY APPROVED FSLADISH
Note: 2/9/24 AT THIS TIME YOU APPROVED TO POUR THE DRIVEWAY APRON AND PAVER RESTRAINTS ONLY ****DO NOT LAY ANY PAVERS UNTIL A SECONDARY SPREAD AND COMPACTION PREPOUR HAS BEEN SUBMITTED AND APPROVED****. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 2/8/2024 - PREVIOUS INSPECTION NOTES 2/8/24 YOU WILL NEED TO ADD A FORM BOARD ACROSS THE REAR ROW DRIVEWAY APRON. YOU NEED TO REMOVE YOU WILL NEED TO REMOVE THE FORM BOARD GOING ACROSS THE MITERED ENDS, THAT MUST BE ONE POUR. YOU WILL NEED TO DIG THE FRONT DRIVEWAY APRON DEEPER TO COPC PAVER DETAIL REQUIREMENTS TO GET THE REQUIRED DEPTH FOR CONCRETE, PAVER BASE AND PAVERS. IF YOU ARE UNSURE OF WHAT NEEDS TO BE CORRECTED, PLEASE CONTACT US AND WE WILL DO OUR BEST TO MEET YOU ON SITE AND REVIEW. THANK YOU. I WILL NOT FEE YOU TODAY. SEE PHOTOS FOR REFERENCE. 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24 POUR AREA TOO WET AND SOFT TO POUR AT THE TIME OF THIS INSPECTION. UNABLE TO SHOOT PIPE ELEVATIONS AS SITE IS UNDER WATE AT THIS TIME. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. MAKE SURE SITE IS DRY AND READY FOR INSPECTION WHEN YOU CALL IT BACK IN FOR REINSPECTION.
ROW- PRE-APRON (PRE-POUR) 02/08/2024 Disapproved - NO FEE FSLADISH
Note: 2/8/24 YOU WILL NEED TO ADD A FORM BOARD ACROSS THE REAR ROW DRIVEWAY APRON. YOU NEED TO REMOVE YOU WILL NEED TO REMOVE THE FORM BOARD GOING ACROSS THE MITERED ENDS, THAT MUST BE ONE POUR. YOU WILL NEED TO DIG THE FRONT DRIVEWAY APRON DEEPER TO COPC PAVER DETAIL REQUIREMENTS TO GET THE REQUIRED DEPTH FOR CONCRETE, PAVER BASE AND PAVERS. IF YOU ARE UNSURE OF WHAT NEEDS TO BE CORRECTED, PLEASE CONTACT US AND WE WILL DO OUR BEST TO MEET YOU ON SITE AND REVIEW. THANK YOU. I WILL NOT FEE YOU TODAY. SEE PHOTOS FOR REFERENCE. 2/5/2024 - PREVIOUS INSPECTION NOTES 2/5/24 POUR AREA TOO WET AND SOFT TO POUR AT THE TIME OF THIS INSPECTION. UNABLE TO SHOOT PIPE ELEVATIONS AS SITE IS UNDER WATE AT THIS TIME. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. MAKE SURE SITE IS DRY AND READY FOR INSPECTION WHEN YOU CALL IT BACK IN FOR REINSPECTION.
ROW- PRE-APRON (PRE-POUR) 02/05/2024 Disapproved - NO FEE FSLADISH
Note: 2/5/24 POUR AREA TOO WET AND SOFT TO POUR AT THE TIME OF THIS INSPECTION. UNABLE TO SHOOT PIPE ELEVATIONS AS SITE IS UNDER WATE AT THIS TIME. I WILL NOT FEE YOU TODAY AS A ONE TIME COURTESY. MAKE SURE SITE IS DRY AND READY FOR INSPECTION WHEN YOU CALL IT BACK IN FOR REINSPECTION.
ROW- PROJECT STATUS 02/02/2024 APPROVED GBERTOLA
Note: MEETING WITH THE CONCRETE GUY
U - SEWER TIE IN 02/01/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 02/01/2024 Approval - Private Provider PPROVIDER
Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 12/19/2023 Approval - Private Provider PPROVIDER
FRAMING 12/15/2023 Approval - Private Provider PPROVIDER
PEP TANK INSTALLATION REQUEST 12/14/2023 APPROVED BVITALE
INSULATION 12/07/2023 Approval - Private Provider PPROVIDER
ALL ROUGH 12/05/2023 Approval - Private Provider PPROVIDER
WALL SHEATHING 11/17/2023 Approval - Private Provider PPROVIDER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/17/2023 Approval - Private Provider PPROVIDER
ROOF VALLEY & METAL 11/17/2023 Approval - Private Provider PPROVIDER
TIE BEAM / LINTEL 10/12/2023 Approval - Private Provider PPROVIDER
FOUND SURVEY APPROVED (OFFICE) 10/12/2023 APPROVED TBAKER
MONOLITHIC SLAB 09/20/2023 Approval - Private Provider PPROVIDER
PLUMBING 1ST ROUGH UNDERGROUND 09/18/2023 Approval - Private Provider PPROVIDER
WATER METER INSTALLATION REQUEST 08/29/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 01/16/2024 01/16/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 01/16/2024 01/29/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 01/16/2024 01/16/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/10/2023 10/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/10/2023 10/10/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 09/08/2023 09/08/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 09/05/2023 09/05/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Color Sheet: Please revise as the color for Earth Tones needs to meet the LRV of 25 or greater. The Gray you have choosen s=does not currently meet the Code
ZON COMPLETE 08/01/2023 08/01/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 07/31/2023 07/31/2023
Note: Released By: JPI
ZON COMPLETE 07/18/2023 07/18/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD HOLD 07/18/2023 07/19/2023
Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
BLD HOLD 07/10/2023 07/16/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
SW1 COMPLETE 07/10/2023 07/18/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/10/2023 07/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 07/10/2023 07/11/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment : this property requires 7 trees. For every 2500 sq ft one tree is needed . We rounded it to 7 trees needed please bring in original Row agreement for processing
SW1 HOLD 06/20/2023 06/20/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM See uploaded Stormwater checklist in attachments for correction. Make corrections on all unchecked items.
ZON HOLD 06/12/2023 06/12/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need one additional tree for this lot size Please provide a Right of Way agreement for pacer driveway signed by all owners on the deed and have notarized once electronic copy is approved we will ask for the original to be turned into us for recording
BLD HOLD 06/12/2023 06/13/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 06/12/2023 06/14/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/12/2023 06/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/12/2023 06/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/12/2023 06/12/2023
LOCATE COMPLETE 06/12/2023 06/14/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/12/2023 06/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN COMPLETE 06/12/2023 06/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 06/12/2023 07/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 04/08/2024
SW ENG REINSPECTION 20 ¤20.00 04/08/2024
SW ENG REINSPECTION 20 ¤20.00 04/08/2024
SW ENG REINSPECTION 20 ¤20.00 04/08/2024
SW ENG - REVIEW 20 ¤20.00 08/28/2023
SW ENG RES REVIEW 200 ¤200.00 08/28/2023
TRANS IMPACT FEE ADMIN ¤54.36 08/28/2023
TRANS IMPACT FEE ADMIN (¤54.36) 08/28/2023
SEWER CREDIT (¤850.00) 08/28/2023
SEWER INSPECTION ¤25.00 08/28/2023
SEWER CAPITAL FACILITY ¤5,344.82 08/28/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 08/28/2023
SITE PLAN 30 ¤30.00 08/28/2023
WATER- TURN ON ¤25.00 08/28/2023
ADJUSTMENT 50% (¤190.50) 08/28/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/28/2023
ADMINISTRATIVE - RESID PP ¤225.00 08/28/2023
PLAN REVIEW - RESIDENTIAL ¤351.00 08/28/2023
CONNECTION FEES ¤1,166.26 08/28/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/28/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/28/2023
FC IMPACT FEE EMS ¤62.00 08/28/2023
IMPACT FEE FIRE ¤420.52 08/28/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/28/2023
FC IMPACT FEE LIBRARY ¤268.00 08/28/2023
IMPACT FEE PARKS ¤1,769.15 08/28/2023
IMPACT FEE SCHOOL ¤5,450.00 08/28/2023
RECORDING FEE REIMBURSE DOC ¤44.00 08/28/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 08/28/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/28/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/28/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/28/2023
SURCHARGE FS 533.721 ¤4.16 08/28/2023
SURCHARGE - FS 468.631 ¤6.23 08/28/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/28/2023
SW ENG INSPECTION 80 ¤80.00 08/28/2023
SW ENG PRE APRON ¤30.00 08/28/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,589.52