Permit #2023060524

Permit Details

Status: COED

Parcel Id: 07-11-31-7023-00370-0280
CONDITIONED SPACE: 1833 sqft
GARAGE: 615 sqft
PATIO/DECK (NO ROOF) : 79 sqft
SCREEN PORCH (SOLID ROOF) : 30 sqft
Total Square Footage: 2557 sqft
Block: 00370
Subdivision: 2191 - SECTION 23-WYNNFIELD
Job Phone: 321-200-7145
Location Address: 21 WHITE HAVEN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 10/18/2023
NOC: RECORDED
Applicant name: JAMES BOWIE CLARK
Owner: K. HOVNANIAN ASPIRE AT PALM COAST, LLC

Address

2301 LUCIEN WAY

MAITLAND, FL 32751

Address

STE 260

MAITLAND, FL 32751

Lot: 0280
Contracted Stated Job Value: ¤166,803.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

K HOVNANIAN FLORIDA OPERATIONS LLC
Status Location Address State License Number Phone
ACTIVE

2301 LUCIEN WAY, STE 260

MAITLAND, FL 32751

CBC1263047 (Exp: 08/31/2026) 561-735-2806

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JAMES MICHAEL WATSON
Status Location Address State License Number Phone
INACTIVE

38115 YALE CIRCLE

LEESBURG, FL 34748

SCC131152841 (Exp: 08/31/2026) 352-434-0115
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CFC1430061 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 07/10/2024 APPROVED TPOLACEK
Note: 07/10/24 TPOLACEK*** PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/9/2024 - PREVIOUS INSPECTION NOTES 7/8/2024 - PREVIOUS INSPECTION NOTES 7/2/2024 - PREVIOUS INSPECTION NOTES 7/2/24 CULVERT IS FULL OF DIRT, NEEDS TO BE CLEANED. PITCH OF APRON EXCEEDS 8%, CANNOT BE STEEPER THAN 8%.
ROW - FINAL APRON (AFTER POUR) 07/09/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 7/8/2024 - PREVIOUS INSPECTION NOTES 7/2/2024 - PREVIOUS INSPECTION NOTES 7/2/24 CULVERT IS FULL OF DIRT, NEEDS TO BE CLEANED. PITCH OF APRON EXCEEDS 8%, CANNOT BE STEEPER THAN 8%.
ROW- PRE-APRON (PRE-POUR) 07/09/2024 APPROVED - AS NOTED TPOLACEK
Note: 07/09/24 TPOLACEK*** APPROVING PRE POUR. YOU WILL NEED TO MAKE SURE IPE IS CLEANED OUT AND ALL SOD IS REPLACED BEFORE THE AFTERPOUR INSPECTION. PLEASE NOTE IRRIGATION MAY NOT BE IN THE ROW ALL HEADS MUST BE BEHIND THE ROW AND AIM OUT OUTWARDS STREET TO WATER THAT AREA. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 7/8/2024 - PREVIOUS INSPECTION NOTES Arrived at 1:00pm driveway wqs not ready for inspection, Crew was still chipping concrete and there were no form boards. Spoke with CM on the phone at 12:05pm and he stated it would be ready for my inspection.
ROW- PRE-APRON (PRE-POUR) 07/08/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: Arrived at 1:00pm driveway wqs not ready for inspection, Crew was still chipping concrete and there were no form boards. Spoke with CM on the phone at 12:05pm and he stated it would be ready for my inspection.
ROW - FINAL APRON (AFTER POUR) 07/08/2024 CANCELLED BY APPLICANT TPOLACEK
Note: 7/2/2024 - PREVIOUS INSPECTION NOTES 7/2/24 CULVERT IS FULL OF DIRT, NEEDS TO BE CLEANED. PITCH OF APRON EXCEEDS 8%, CANNOT BE STEEPER THAN 8%.
BLD - BUILDING FINAL 07/03/2024 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 07/02/2024 Disapproved - NO FEE MKRASKI
Note: 1. ODU is required to be 3'' off grade
ROW - FINAL APRON (AFTER POUR) 07/02/2024 Disapproved - NO FEE JMYERS
Note: 7/2/24 CULVERT IS FULL OF DIRT, NEEDS TO BE CLEANED. PITCH OF APRON EXCEEDS 8%, CANNOT BE STEEPER THAN 8%.
ROW - STORMWATER FINAL 07/02/2024 APPROVED JMYERS
Note: 7/2/24 ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 07/02/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:16:06 PM *** has potable irrigation with PVB-no cross connection
ROW- FINAL SURVEY/GRADING CERTIFICATION 07/01/2024 APPROVED TPOLACEK
Note: Inspector Notes from Inspection 9465 07/01/24 TPOLACEK*** MET WITH SCOTT ON SITE SWALE IS BETTER AND THEY ARE GOING TO MAKE MORE CORRECTIONS. RIGHT SIDE PROPERTY STILL NEEDS SEED N STRAW. APPROVING AS NOTED WILL CATCH ON FINAL ROW INSPECTION 6/27/2024 - PREVIOUS INSPECTION NOTES 06/27/24 TPOLACEK*** DISCUSSED WITH CM ON TUESDAY ABOUT SWALE NOT BEING 8' FROM EOP AND SWALE NEEDED REGRADE. SURVEY INDICATES SWALE DOES NOT FLOW IN THE CORRECT DIRECTION IN ACCORDANCE WITH THE SWALE PLAN DIAGRAM. FLOW IS RIGHT TO LEFT AND SURVEY INDICATES LEFT TO RIGHT FLOW. SWALE BE BE CORRECTED AND SURVEY MUST DISPLAY CORRECT ELEVATIONS AND FLOW. 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" Swale Plan #2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/25/2024 - PREVIOUS INSPECTION NOTES 06/25/24 TPOLACEK*** SURVEY INDICATES 15" CULVERT PIPE SITE PLAN INDICATES 14X23 PLEASE CLARIFY, PIPE SHOULD BE 13X17 CMP AS PER CITY REQUIRMENTS, ELEVATION FROM EOP TO BACK SIDE OF SWALE MUST BE EQUAL OR GREATER ON THE BACKSIDE. Swale Plan Details #1. The driveway culvert is to be a 17x13 helical corrugated metal pipe with mitered ends...Substitutes require prior approval by the City Stormwater Engineer. 16 Property line Sec 300, Drawing 300.D, Sec 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the edge of road elevation. Inspector Notes from Inspection 9270 05/22/24 TPOLACEK*** SPOKE WITH SCOTT TO LET HIM KNOW WHEN THEY SET THE PIPE PLEASE DO NOT DIG OUT MORE THAN THE 6X6 FOOTER. PIPE IS UNDERMINED OVER A FOOT. LEFT SIDE MITER INSIDE FORM BOARD IS MISSING AND THEY WILL ENSURE IT WILL BE INPLACE BEFORE POURING TO AVOID OVER POUR OUTSIDE THE POUR AREA. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY PFLANAGAN 5/7/2024 9:49:23 AM *** TALKED WITH SCOTT ON SITE. ON THINGS NEED TO BE ADDRESSED. 1) NEED RE-ESTABLISH THE BENCH MARK ON THE RIGHT EDGE OF ROAD AT THE SAME ELEVATION ON THE SWALE PLAN DETAIL. 2) LEFT SIDE CULVERT PIPE IS TO FAR FROM EDGE OF PAVEMENT. THE CULVERT NEEDS TO BE 8' FROM THE EDGE OF ROAD TO THE CENTER OF CULVERT. 3) THE CULVERT IS FLOWING THE WRONG DIRECTION. 4) NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY. ALONG THE FRONT FORM BOARDS AT THE CORNERS NOT ENOUGH.
ROW FIELD SURVEY /GRADING CERTIFICATION 07/01/2024 APPROVED - AS NOTED TPOLACEK
Note: 07/01/24 TPOLACEK*** MET WITH SCOTT ON SITE SWALE IS BETTER AND THEY ARE GOING TO MAKE MORE CORRECTIONS. RIGHT SIDE PROPERTY STILL NEEDS SEED N STRAW. APPROVING AS NOTED WILL CATCH ON FINAL ROW INSPECTION
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/27/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 06/27/24 TPOLACEK*** DISCUSSED WITH CM ON TUESDAY ABOUT SWALE NOT BEING 8' FROM EOP AND SWALE NEEDED REGRADE. SURVEY INDICATES SWALE DOES NOT FLOW IN THE CORRECT DIRECTION IN ACCORDANCE WITH THE SWALE PLAN DIAGRAM. FLOW IS RIGHT TO LEFT AND SURVEY INDICATES LEFT TO RIGHT FLOW. SWALE BE BE CORRECTED AND SURVEY MUST DISPLAY CORRECT ELEVATIONS AND FLOW. 2 Roadside swale. Sec.300.01 C1 Sec.300.01 C1 "The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus 0.10 feet and must demonstrate a positive fall in the direction described in the swale plan. Sec.300.01 C1" Swale Plan #2. The swale centerline is typically located 8 feet from the edge of pavement, 5 feet from e.o.p. in cul de sacs. Culverts in cul de sacs may require a 22.5° elbow. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 6/25/2024 - PREVIOUS INSPECTION NOTES 06/25/24 TPOLACEK*** SURVEY INDICATES 15" CULVERT PIPE SITE PLAN INDICATES 14X23 PLEASE CLARIFY, PIPE SHOULD BE 13X17 CMP AS PER CITY REQUIRMENTS, ELEVATION FROM EOP TO BACK SIDE OF SWALE MUST BE EQUAL OR GREATER ON THE BACKSIDE. Swale Plan Details #1. The driveway culvert is to be a 17x13 helical corrugated metal pipe with mitered ends...Substitutes require prior approval by the City Stormwater Engineer. 16 Property line Sec 300, Drawing 300.D, Sec 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the edge of road elevation. Inspector Notes from Inspection 9270 05/22/24 TPOLACEK*** SPOKE WITH SCOTT TO LET HIM KNOW WHEN THEY SET THE PIPE PLEASE DO NOT DIG OUT MORE THAN THE 6X6 FOOTER. PIPE IS UNDERMINED OVER A FOOT. LEFT SIDE MITER INSIDE FORM BOARD IS MISSING AND THEY WILL ENSURE IT WILL BE INPLACE BEFORE POURING TO AVOID OVER POUR OUTSIDE THE POUR AREA. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY PFLANAGAN 5/7/2024 9:49:23 AM *** TALKED WITH SCOTT ON SITE. ON THINGS NEED TO BE ADDRESSED. 1) NEED RE-ESTABLISH THE BENCH MARK ON THE RIGHT EDGE OF ROAD AT THE SAME ELEVATION ON THE SWALE PLAN DETAIL. 2) LEFT SIDE CULVERT PIPE IS TO FAR FROM EDGE OF PAVEMENT. THE CULVERT NEEDS TO BE 8' FROM THE EDGE OF ROAD TO THE CENTER OF CULVERT. 3) THE CULVERT IS FLOWING THE WRONG DIRECTION. 4) NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY. ALONG THE FRONT FORM BOARDS AT THE CORNERS NOT ENOUGH.
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/25/2024 Disapproved - NO FEE TPOLACEK
Note: 06/25/24 TPOLACEK*** SURVEY INDICATES 15" CULVERT PIPE SITE PLAN INDICATES 14X23 PLEASE CLARIFY, PIPE SHOULD BE 13X17 CMP AS PER CITY REQUIRMENTS, ELEVATION FROM EOP TO BACK SIDE OF SWALE MUST BE EQUAL OR GREATER ON THE BACKSIDE. Swale Plan Details #1. The driveway culvert is to be a 17x13 helical corrugated metal pipe with mitered ends...Substitutes require prior approval by the City Stormwater Engineer. 16 Property line Sec 300, Drawing 300.D, Sec 300, Drawing 300.D, Drawing 300.D,The front property line/right away elevation are to be equal to or greater than the edge of road elevation. Inspector Notes from Inspection 9270 05/22/24 TPOLACEK*** SPOKE WITH SCOTT TO LET HIM KNOW WHEN THEY SET THE PIPE PLEASE DO NOT DIG OUT MORE THAN THE 6X6 FOOTER. PIPE IS UNDERMINED OVER A FOOT. LEFT SIDE MITER INSIDE FORM BOARD IS MISSING AND THEY WILL ENSURE IT WILL BE INPLACE BEFORE POURING TO AVOID OVER POUR OUTSIDE THE POUR AREA. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY PFLANAGAN 5/7/2024 9:49:23 AM *** TALKED WITH SCOTT ON SITE. ON THINGS NEED TO BE ADDRESSED. 1) NEED RE-ESTABLISH THE BENCH MARK ON THE RIGHT EDGE OF ROAD AT THE SAME ELEVATION ON THE SWALE PLAN DETAIL. 2) LEFT SIDE CULVERT PIPE IS TO FAR FROM EDGE OF PAVEMENT. THE CULVERT NEEDS TO BE 8' FROM THE EDGE OF ROAD TO THE CENTER OF CULVERT. 3) THE CULVERT IS FLOWING THE WRONG DIRECTION. 4) NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY. ALONG THE FRONT FORM BOARDS AT THE CORNERS NOT ENOUGH.
U-CROSS CONNECTION 06/17/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 2:16:06 PM *** has potable irrigation with PVB-no cross connection
ROW- PRE-APRON (PRE-POUR) 05/22/2024 APPROVED - AS NOTED TPOLACEK
Note: 05/22/24 TPOLACEK*** SPOKE WITH SCOTT TO LET HIM KNOW WHEN THEY SET THE PIPE PLEASE DO NOT DIG OUT MORE THAN THE 6X6 FOOTER. PIPE IS UNDERMINED OVER A FOOT. LEFT SIDE MITER INSIDE FORM BOARD IS MISSING AND THEY WILL ENSURE IT WILL BE INPLACE BEFORE POURING TO AVOID OVER POUR OUTSIDE THE POUR AREA. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 5/7/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY PFLANAGAN 5/7/2024 9:49:23 AM *** TALKED WITH SCOTT ON SITE. ON THINGS NEED TO BE ADDRESSED. 1) NEED RE-ESTABLISH THE BENCH MARK ON THE RIGHT EDGE OF ROAD AT THE SAME ELEVATION ON THE SWALE PLAN DETAIL. 2) LEFT SIDE CULVERT PIPE IS TO FAR FROM EDGE OF PAVEMENT. THE CULVERT NEEDS TO BE 8' FROM THE EDGE OF ROAD TO THE CENTER OF CULVERT. 3) THE CULVERT IS FLOWING THE WRONG DIRECTION. 4) NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY. ALONG THE FRONT FORM BOARDS AT THE CORNERS NOT ENOUGH.
U-CROSS CONNECTION 05/16/2024 CANCELLED BY APPLICANT WEB
U - SEWER TIE IN 05/14/2024 APPROVED MGIBSON
GRAVITY SEWER TEST 05/14/2024 APPROVED MGIBSON
ELECTRIC - EARLY POWER 05/14/2024 APPROVED - AS NOTED MKRASKI
Note: 5/14/24 Revision required to electrical plans for service riser, have revision approved before final Emailed FPL @ 2:20pm
ELECTRIC - EARLY POWER 05/13/2024 CANCELLED BY APPLICANT WEB
Note: 3/19/2024 - PREVIOUS INSPECTION NOTES Not ready for early power inspection
ROW- PRE-APRON (PRE-POUR) 05/07/2024 Disapproved - NO FEE PFLANAGAN
Note: *** NOTES ADDED BY PFLANAGAN 5/7/2024 9:49:23 AM *** TALKED WITH SCOTT ON SITE. ON THINGS NEED TO BE ADDRESSED. 1) NEED RE-ESTABLISH THE BENCH MARK ON THE RIGHT EDGE OF ROAD AT THE SAME ELEVATION ON THE SWALE PLAN DETAIL. 2) LEFT SIDE CULVERT PIPE IS TO FAR FROM EDGE OF PAVEMENT. THE CULVERT NEEDS TO BE 8' FROM THE EDGE OF ROAD TO THE CENTER OF CULVERT. 3) THE CULVERT IS FLOWING THE WRONG DIRECTION. 4) NEED TO HAVE A MINIMUM OF 6" IN THE RIGHT OF WAY. ALONG THE FRONT FORM BOARDS AT THE CORNERS NOT ENOUGH.
PEP TANK INSTALLATION REQUEST 04/24/2024 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 04/18/2024 APPROVED AGAETANO
Note: 4/16/2024 - PREVIOUS INSPECTION NOTES 4/16/24 1. Previous items not repaired 2. Large whole requires moisture barrier and lath where cat5 wiring comes out by metermain. 4/15/24 1. Low voltage panel is missing outlet but must be installed to check proper bonding 2. Living room window over looking lani is missing anchors Check on next inspection 4/11/2024 - PREVIOUS INSPECTION NOTES ALL previous items must be fixed before calling in re-inspection 1. Address MUST be minimum of 4'' tall and 1/2'' thick per FBC107.3.1 2. All metalic boxes must be properly bonded 3. Failed 5' head pressure test Stopped inspection, niot ready Addressing needs to be Minimum 4" tall and visible from street. R319.1 Correct before next inspection, please
INSULATION 04/18/2024 APPROVED AGAETANO
LATH/BRICK/ WATER BARRIER 04/16/2024 Disapproved - NO FEE MKRASKI
Note: 4/16/24 1. Previous items not repaired 2. Large whole requires moisture barrier and lath where cat5 wiring comes out by metermain. 4/15/24 1. Low voltage panel is missing outlet but must be installed to check proper bonding 2. Living room window over looking lani is missing anchors Check on next inspection 4/11/2024 - PREVIOUS INSPECTION NOTES ALL previous items must be fixed before calling in re-inspection 1. Address MUST be minimum of 4'' tall and 1/2'' thick per FBC107.3.1 2. All metalic boxes must be properly bonded 3. Failed 5' head pressure test Stopped inspection, niot ready Addressing needs to be Minimum 4" tall and visible from street. R319.1 Correct before next inspection, please
ALL ROUGH 04/15/2024 APPROVED - AS NOTED MKRASKI
Note: 4/15/24 1. Low voltage panel is missing outlet but must be installed to check proper bonding 2. Living room window over looking lani is missing anchors Check on next inspection 4/11/2024 - PREVIOUS INSPECTION NOTES ALL previous items must be fixed before calling in re-inspection 1. Address MUST be minimum of 4'' tall and 1/2'' thick per FBC107.3.1 2. All metalic boxes must be properly bonded 3. Failed 5' head pressure test Stopped inspection, niot ready Addressing needs to be Minimum 4" tall and visible from street. R319.1 Correct before next inspection, please
ALL ROUGH 04/11/2024 Disapproved - NO FEE MKRASKI
Note: ALL previous items must be fixed before calling in re-inspection 1. Address MUST be minimum of 4'' tall and 1/2'' thick per FBC107.3.1 2. All metalic boxes must be properly bonded 3. Failed 5' head pressure test Stopped inspection, niot ready Addressing needs to be Minimum 4" tall and visible from street. R319.1 Correct before next inspection, please
WALL SHEATHING 04/05/2024 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/05/2024 APPROVED - AS NOTED KSANDOE
Note: Addressing needs to be Minimum 4" tall and visible from street. R319.1 Correct before next inspection, please
ROOF VALLEY & METAL 04/05/2024 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 04/04/2024 APPROVED TBAKER
ROW- PROJECT STATUS 04/01/2024 Disapproved - NO FEE RGROSS
Note: *** NOTES ADDED BY RGROSS 7/1/2024 3:09:44 PM *** Builder corrected the grading issue and worked with Tom Polacek to meet the city minimum standards. The rear grade is much higher than proposed site plan. Builder was made aware via voicemail that much fill will need to be removed before the final grade to be closer to the originally approved site plan. See photo attached.
ELECTRIC - EARLY POWER 03/19/2024 Disapproved - NO FEE MKRASKI
Note: Not ready for early power inspection
TIE BEAM / LINTEL 03/15/2024 APPROVED MKRASKI
MONOLITHIC SLAB 03/06/2024 APPROVED JSTEWART
PLUMBING 1ST ROUGH UNDERGROUND 03/04/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 01/09/2024 APPROVED BVITALE

Review History

Department Status Date In Date Out
ELEC COMPLETE 06/18/2024 06/24/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 06/11/2024 06/11/2024
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Blower door test failed, please provide a report that has passed.
ZON COMPLETE 04/04/2024 04/04/2024
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 04/01/2024 04/01/2024
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Wrong foundation survey submitted.
ZON HOLD 04/01/2024 04/01/2024
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Foundation Survey submitted is for the wrong address.
ENGIN1 COMPLETE 04/01/2024 04/02/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 04/01/2024 04/01/2024
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Please provide the set back to the closest point to the property line
BLD COMPLETE 03/21/2024 03/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 03/04/2024 03/04/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
MECH COMPLETE 01/16/2024 01/18/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/16/2023 10/16/2023
Note: Released By: JPI
MECH COMPLETE 10/16/2023 10/16/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD HOLD 10/05/2023 10/09/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
ZON COMPLETE 10/05/2023 10/06/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
MECH HOLD 10/05/2023 10/09/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition (Second Request)
SW1 COMPLETE 10/05/2023 10/06/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
BLD HOLD 06/12/2023 06/13/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 06/12/2023 06/13/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/12/2023 06/12/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/12/2023 06/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/12/2023 06/12/2023
LOCATE COMPLETE 06/12/2023 06/14/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 06/12/2023 06/14/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition 2. Duct layout needs to be signed by the AC contractor per 107.1 FBC Residential 2020 7th Edition
SW1 HOLD 06/12/2023 06/20/2023
Note: Held By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM SEE ATTACHED CHECK LIST FOR ALL REQUIREMENTS ON A SUBMITTED SITE PLAN
ZON HOLD 06/12/2023 06/13/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: provide the width of the walkway. Site plan and Floor plan of home do not match Landscape plan: Demonstrate this on the landscape plan also provide a legend with the type of schrubs being used and trees being planted and sod be used. Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 4 trees Residential homes shall provide a foundation planting consisting of 16 shrubs on interior lots. Eight shrubs shall be planted in front of home and four shrubs planted on each side of the home. The corners of the home shall be wrapped with shrubbery or have an understory tree planted there. *All of these required shrubs shall be planted between two and one half and eight feet of the home’s foundation.* Please include proposed shrubs that demonstrate that the shrubs will provide screening for the mechanical equipment. Min gallons for foundation palntings is three gallons and 7 gallons for mechanical screening. Elevation plan: Banding around Windows and Doors All windows and doors facing public right of way must have banding all around the window or door (shutters can substitute for banding). Including Garage doors.
SWALE COMPLETE 06/12/2023 07/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 07/10/2024
SW ENG REINSPECTION 20 ¤20.00 07/10/2024
SW ENG REINSPECTION 20 ¤20.00 07/10/2024
SW ENG REINSPECTION 30 ¤30.00 07/10/2024
PLAN REVIEW - REVISION ¤32.50 07/10/2024
CONNECTION FEES ¤1,166.26 10/18/2023
WATER- TURN ON ¤25.00 10/18/2023
ADJUSTMENT 50% (¤426.25) 10/18/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 10/18/2023
INSPECTION - RESIDENTIAL ¤640.75 10/18/2023
PLAN REVIEW - RESIDENTIAL ¤181.74 10/18/2023
SW ENG - REVIEW 20 ¤20.00 10/18/2023
SW ENG RES REVIEW 200 ¤200.00 10/18/2023
SEWER CREDIT (¤1,147.00) 10/18/2023
SEWER INSPECTION ¤25.00 10/18/2023
SEWER CAPITAL FACILITY ¤5,344.82 10/18/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 10/18/2023
SITE PLAN 30 ¤30.00 10/18/2023
FC IMPACT FEE EMS ¤62.00 10/18/2023
IMPACT FEE FIRE ¤428.09 10/18/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 10/18/2023
FC IMPACT FEE LIBRARY ¤268.00 10/18/2023
IMPACT FEE PARKS ¤1,800.99 10/18/2023
IMPACT FEE SCHOOL ¤5,450.00 10/18/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 10/18/2023
WATER -IRRIGATION INSPECTION ¤25.00 10/18/2023
SURCHARGE FS 533.721 ¤4.26 10/18/2023
SURCHARGE - FS 468.631 ¤6.39 10/18/2023
SW ENG - FOUNDATION SURVEY ¤20.00 10/18/2023
SW ENG INSPECTION 80 ¤80.00 10/18/2023
SW ENG PRE APRON ¤30.00 10/18/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,341.43