I want to search for...

Permit #2023060538

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00660-0130
CONDITIONED SPACE: 2677 sqft
GARAGE: 628 sqft
SCREEN PORCH (SOLID ROOF) : 132 sqft
OPENED PORCH (WITH ROOF) : 41 sqft
Total Square Footage: 3478 sqft
Block: 00660
Subdivision: -
Job Phone: 904-305-8901
Location Address: 3 ULBRIGHT CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/13/2023
NOC: RECORDED
Applicant name: ROBERT GEORGE INTILLE
Owner: MARONDA HOMES LLC

Address

40409 NE MILLER ROAD

WASHOUGAL, WA 98671

Lot: 0130
Contracted Stated Job Value: ¤229,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

MARONDA HOMES, LLC OF FLORIDA
Status Location Address State License Number Phone
ACTIVE

5220 SHAD ROAD

JACKSONVILLE, FL 32257

CBC1253155 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965
DEBORAH MAXINE JACKSON
Status Location Address State License Number Phone
ACTIVE

1165 SOUTH 5TH

MACCLENNY, FL 32063

CCC1330709 (Exp: 08/31/2026) 904-322-9409
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/27/2023 FINAL APPROVED BTAYLOR
Note: 12/22/2023 - PREVIOUS INSPECTION NOTES 12/22/23: ** Exterior temporary electrical box covers need to be changed to weathertite/weather proof type covers. Includes soffit & wall boxes.
BLD - BUILDING FINAL 12/22/2023 CANCELLED BY APPLICANT WEB
BLD - BUILDING FINAL 12/22/2023 Disapproved - NO FEE RSIMS
Note: 12/22/23: ** Exterior temporary electrical box covers need to be changed to weathertite/weather proof type covers. Includes soffit & wall boxes.
U-CROSS CONNECTION 12/20/2023 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
ROW - STORMWATER FINAL 12/20/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U -UTILITY RESIDENTIAL FINAL 12/20/2023 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 12/19/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/19/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/19/2023 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 12/06/2023 APPROVED - AS NOTED TPOLACEK
Note: 12/6/23 ** REESTABLISHED BENCH MARK NOW MATCHES REVISED SWALE PLAN DIAGRAM. PIPE IS IN TOLERANCE AT TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ** APPROVING THIS INSPECTION AS NOTED ACCORDING TO NEW SWALE PLAN DIAGRAM. ** INSPECTORS NOTE - CATCH BASIN INLET IS STILL HIGHER THAN CULVERT INVERT _____________________________________________________________________________________________ 12/5/2023 - PREVIOUS INSPECTION NOTES 12/5/23 ** THE BENCH MARK USED IN ORIGINAL SURVEY IS BEHIND FPL CONDUIT. THE NEW BENCH MARK THAT WAS DONE YESTERDAY DOES NOT REFLECT THE SWALE PLAN DIAGRAM AND A NEW BENCH MARK THAT MATCHES ORIGINAL SURVEY PLAN MUST BE ESTABLISHED BEFORE PRE-POUR CAN BE PASSED. ** PIPE IS STILL OUT OF TOLERANCE TO SWALE PLAN DIAGRAM Driveway culverts are to be installed at the elevation indicatedin the swale plan within the tolerance stated on the swale plan with a slope not toexceed 0.10 feet against the drainage flow. It is the builder/owner's responsibility toconfirm elevations/locations of culvert placement. (A)(B)(C)(D) Citation(s): A.Land Development Code Technical Manual, Drawing 300.C (1)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)D.Land Development Code Technical Manual, Section 300.01 (C)(3) Comment: ____________________________________________________________________________ 12/4/2023 - PREVIOUS INSPECTION NOTES 12/4/23 *** BENCH MARK LOCATED ON POLE DID NOT MATCH CENTER LINE OF ROAD. TOOK ADDITION SHOT AT CATCH BASIN AND SET PIPE IS LOWER THAN CATCH BASIN. NEED TO HAVE SURVEYOR COME BACK OUT TO REESTABLISH BENCH MARK TO SWALE PLAN DIAGRAM OR RESUBMIT FOR NEW SWALE PLAN DIAGRAM BASED ON REESTABLISHED BENCH MARK. CALLED CITY SURVEY CREW OUT TO SITE AND THEY LOCATED A POSSIBLE BENCH MARK BEHIND FPL CONDUIT SCREWED TO POLE OVER POSSIBLE BENCH MARK. PIPE WILL NEED TO BE RESET TO THE NEW/REESTABLISHED BENCH MARK ACCORDING TO SWALE PLAN DIAGRAM. ** NO FEE TODAY
ROW- PRE-APRON (PRE-POUR) 12/05/2023 Disapproved -FEE REQUIRED TPOLACEK
Note: 12/5/23 ** THE BENCH MARK USED IN ORIGINAL SURVEY IS BEHIND FPL CONDUIT. THE NEW BENCH MARK THAT WAS DONE YESTERDAY DOES NOT REFLECT THE SWALE PLAN DIAGRAM AND A NEW BENCH MARK THAT MATCHES ORIGINAL SURVEY PLAN MUST BE ESTABLISHED BEFORE PRE-POUR CAN BE PASSED. ** PIPE IS STILL OUT OF TOLERANCE TO SWALE PLAN DIAGRAM Driveway culverts are to be installed at the elevation indicatedin the swale plan within the tolerance stated on the swale plan with a slope not toexceed 0.10 feet against the drainage flow. It is the builder/owner's responsibility toconfirm elevations/locations of culvert placement. (A)(B)(C)(D) Citation(s): A.Land Development Code Technical Manual, Drawing 300.C (1)B.Land Development Code Technical Manual, Drawing 300.C (10)C.Land Development Code Technical Manual, Drawing 300.E (11)D.Land Development Code Technical Manual, Section 300.01 (C)(3) Comment: ____________________________________________________________________________ 12/4/2023 - PREVIOUS INSPECTION NOTES 12/4/23 *** BENCH MARK LOCATED ON POLE DID NOT MATCH CENTER LINE OF ROAD. TOOK ADDITION SHOT AT CATCH BASIN AND SET PIPE IS LOWER THAN CATCH BASIN. NEED TO HAVE SURVEYOR COME BACK OUT TO REESTABLISH BENCH MARK TO SWALE PLAN DIAGRAM OR RESUBMIT FOR NEW SWALE PLAN DIAGRAM BASED ON REESTABLISHED BENCH MARK. CALLED CITY SURVEY CREW OUT TO SITE AND THEY LOCATED A POSSIBLE BENCH MARK BEHIND FPL CONDUIT SCREWED TO POLE OVER POSSIBLE BENCH MARK. PIPE WILL NEED TO BE RESET TO THE NEW/REESTABLISHED BENCH MARK ACCORDING TO SWALE PLAN DIAGRAM. ** NO FEE TODAY
ROW- PRE-APRON (PRE-POUR) 12/04/2023 Disapproved - NO FEE FSLADISH
Note: 12/4/23 *** BENCH MARK LOCATED ON POLE DID NOT MATCH CENTER LINE OF ROAD. TOOK ADDITION SHOT AT CATCH BASIN AND SET PIPE IS LOWER THAN CATCH BASIN. NEED TO HAVE SURVEYOR COME BACK OUT TO REESTABLISH BENCH MARK TO SWALE PLAN DIAGRAM OR RESUBMIT FOR NEW SWALE PLAN DIAGRAM BASED ON REESTABLISHED BENCH MARK. CALLED CITY SURVEY CREW OUT TO SITE AND THEY LOCATED A POSSIBLE BENCH MARK BEHIND FPL CONDUIT SCREWED TO POLE OVER POSSIBLE BENCH MARK. PIPE WILL NEED TO BE RESET TO THE NEW/REESTABLISHED BENCH MARK ACCORDING TO SWALE PLAN DIAGRAM. ** NO FEE TODAY
ELECTRIC - EARLY POWER 11/27/2023 APPROVED RMARTIN
Note: Inspector Notes from Inspection 2200 9-19-23 1. Emailed FPL at 3:13.
U - SEWER TIE IN 11/08/2023 APPROVED - AS NOTED MGIBSON
Note: 8/9/2023 - PREVIOUS INSPECTION NOTES U-SEWERTIE IN WAS ALREADY STUBBED UP BY UTILITY
LATH/BRICK/ WATER BARRIER 10/23/2023 APPROVED BTAYLOR
Note: 10/20/2023 - PREVIOUS INSPECTION NOTES 10-20-23 1. Not ready.
LATH/BRICK/ WATER BARRIER 10/20/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 10-20-23 1. Not ready.
INSULATION 10/17/2023 APPROVED BTAYLOR
ALL ROUGH 10/11/2023 APPROVED BTAYLOR
ROOF VALLEY & METAL 10/05/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/02/2023 APPROVED BTAYLOR
Note: 9/29/2023 - PREVIOUS INSPECTION NOTES 9/28/2023 - PREVIOUS INSPECTION NOTES 9-28-23 1. Not ready. 9-29-23 1. Not ready.
ROOF SHEATHING 10/02/2023 APPROVED BTAYLOR
Note: 9/29/2023 - PREVIOUS INSPECTION NOTES 9/28/2023 - PREVIOUS INSPECTION NOTES 9/27/2023 - PREVIOUS INSPECTION NOTES 9/25/2023 - PREVIOUS INSPECTION NOTES 9-27-23 1. Not ready. 9-28-23 1. Not ready. 9-29-23 1. Not ready.
ROOF SHEATHING 09/29/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/28/2023 - PREVIOUS INSPECTION NOTES 9/27/2023 - PREVIOUS INSPECTION NOTES 9/25/2023 - PREVIOUS INSPECTION NOTES 9-27-23 1. Not ready. 9-28-23 1. Not ready. 9-29-23 1. Not ready.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/29/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/28/2023 - PREVIOUS INSPECTION NOTES 9-28-23 1. Not ready. 9-29-23 1. Not ready.
ROOF SHEATHING 09/28/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/27/2023 - PREVIOUS INSPECTION NOTES 9/25/2023 - PREVIOUS INSPECTION NOTES 9-27-23 1. Not ready. 9-28-23 1. Not ready.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/28/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9-28-23 1. Not ready.
WALL SHEATHING 09/27/2023 APPROVED BTAYLOR
Note: 9/25/2023 - PREVIOUS INSPECTION NOTES
ROOF SHEATHING 09/27/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/25/2023 - PREVIOUS INSPECTION NOTES 9-27-23 1. Not ready.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/26/2023 CANCELLED BY APPLICANT WEB
WALL SHEATHING 09/25/2023 CANCELLED BY APPLICANT BTAYLOR
ROOF SHEATHING 09/25/2023 CANCELLED BY APPLICANT BTAYLOR
ROOF SHEATHING 09/19/2023 CANCELLED BY APPLICANT WEB
WALL SHEATHING 09/19/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/19/2023 CANCELLED BY APPLICANT WEB
ELECTRIC-TUG 09/19/2023 CANCELLED BY APPLICANT WEB
ELECTRIC-TUG 09/19/2023 APPROVED - AS NOTED BTAYLOR
Note: 9-19-23 1. Emailed FPL at 3:13.
TIE BEAM / LINTEL 09/08/2023 APPROVED BTAYLOR
Note: 9/7/2023 - PREVIOUS INSPECTION NOTES 9/5/2023 - PREVIOUS INSPECTION NOTES 9/1/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection 8/29/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. 9-7-23 1. Not ready.
TIE BEAM / LINTEL 09/07/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 9/5/2023 - PREVIOUS INSPECTION NOTES 9/1/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection 8/29/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed. 9-7-23 1. Not ready.
TIE BEAM / LINTEL 09/05/2023 CANCELLED BY APPLICANT BTAYLOR
Note: 9/1/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection New inspection due to canceled inspection 8/29/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
TIE BEAM / LINTEL 09/01/2023 CANCELLED BY APPLICANT BTAYLOR
Note: New inspection due to canceled inspection New inspection due to canceled inspection 8/29/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
TIE BEAM / LINTEL 08/31/2023 CANCELLED BY APPLICANT WEB
Note: 8/29/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
TIE BEAM / LINTEL 08/31/2023 CANCELLED BY APPLICANT WEB
Note: New inspection due to canceled inspection 8/29/2023 11:34:07 AM- PREVIOUS INSPECTION NOTES City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
TIE BEAM / LINTEL 08/30/2023 CANCELLED BY APPLICANT BBEMBRY
Note: City Hall and City Facilities will be closed Wednesday August 30th. Inspections will not be performed Wednesday; August 30th. Inspections scheduled for Wednesday will cancelled. Please reschedule when you are ready for the inspection. Please be advised, if our community experiences damage, Building Inspectors priority will be providing damage assessment of the area and inspections will be postponed. Please monitor your emails to stay informed.
TIE BEAM / LINTEL 08/29/2023 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 08/15/2023 APPROVED BTAYLOR
Note: 8/14/2023 - PREVIOUS INSPECTION NOTES 8/14/23: Not Ready. Dirt cave-in/wash-in throughout all footers.
MONOLITHIC SLAB 08/14/2023 Disapproved - NO FEE RSIMS
Note: 8/14/23: Not Ready. Dirt cave-in/wash-in throughout all footers.
FOUND SURVEY APPROVED (OFFICE) 08/09/2023 APPROVED TBAKER
PLUMBING 1ST ROUGH UNDERGROUND 08/09/2023 APPROVED - AS NOTED MGIBSON
Note: WASHING MACHINE P-TRAP OR HANSEN BOX IS UNDER SLAB
GRAVITY SEWER TEST 08/09/2023 APPROVED MGIBSON
U - SEWER TIE IN 08/09/2023 CANCELLED BY APPLICANT MGIBSON
WATER METER INSTALLATION REQUEST 07/21/2023 APPROVED CSTONE
WATER METER INSTALLATION REQUEST 07/20/2023 CANCELLED BY APPLICANT WEB

Review History

Department Status Date In Date Out
MECH COMPLETE 12/19/2023 12/19/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/11/2023 12/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 12/11/2023 12/18/2023
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM
ZON COMPLETE 12/11/2023 12/11/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/08/2023 08/09/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/08/2023 08/08/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ELEC COMPLETE 06/29/2023 07/10/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 06/23/2023 06/23/2023
Note: Released By: JPI
ELEC HOLD 06/23/2023 06/26/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Master bed 2nd REQUEST
BLD HOLD 06/12/2023 06/13/2023
Note: Held By: JPI 20230600536 Maronda 1 hour not approved 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. 2. Product Approval number 12328.9 appears to have reached expiration per a DBPR inquiry. Please cure. 107.2.4
CUSVC COMPLETE 06/12/2023 06/14/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 06/12/2023 06/13/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Master bed
ENGIN1 COMPLETE 06/12/2023 06/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/12/2023 06/12/2023
LOCATE COMPLETE 06/12/2023 06/14/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/12/2023 06/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/12/2023 06/20/2023
Note: Released By: EDWARD MADISON - - EMADISON@PALMCOASTGOV.COM
ZON COMPLETE 06/12/2023 06/13/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 06/12/2023 07/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/27/2023
CONTRACTOR CHANGE ¤20.00 12/27/2023
PLAN REVIEW - REVISION ¤32.50 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
REINSPECTION RESIDENTIAL ¤40.00 12/27/2023
SW ENG REINSPECTION 30 ¤30.00 12/27/2023
SW ENG - REVIEW 20 ¤20.00 07/13/2023
SW ENG RES REVIEW 200 ¤200.00 07/13/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/13/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/13/2023
SEWER INSPECTION ¤25.00 07/13/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/13/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/13/2023
SITE PLAN 30 ¤30.00 07/13/2023
CONNECTION FEES ¤1,166.26 07/13/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/13/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/13/2023
FC IMPACT FEE EMS ¤62.00 07/13/2023
IMPACT FEE FIRE ¤420.52 07/13/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/13/2023
FC IMPACT FEE LIBRARY ¤268.00 07/13/2023
IMPACT FEE PARKS ¤1,769.15 07/13/2023
IMPACT FEE SCHOOL ¤5,450.00 07/13/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 07/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/13/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/13/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/13/2023
SURCHARGE FS 533.721 ¤5.96 07/13/2023
SURCHARGE - FS 468.631 ¤8.94 07/13/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/13/2023
SW ENG INSPECTION 80 ¤80.00 07/13/2023
SW ENG PRE APRON ¤30.00 07/13/2023
WATER- TURN ON ¤25.00 07/13/2023
ADJUSTMENT 50% (¤595.69) 07/13/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/13/2023
INSPECTION - RESIDENTIAL ¤904.75 07/13/2023
PLAN REVIEW - RESIDENTIAL ¤256.62 07/13/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,882.71