I want to search for...
Permit #2023060598
Permit Details
Status: COED
| Parcel Id: 28-10-30-4240-00000-0020 |
| CONDITIONED SPACE: 1905 sqft |
| GARAGE: 477 sqft |
| SCREEN PORCH (SOLID ROOF) : 211 sqft |
| Total Square Footage: 2593 sqft |
| Subdivision: 2327 - MATANZAS COVE SUBDIVISION (55+ AGE EXEMPT) |
| Job Phone: 386-445-9009 |
| Location Address: 12 MATANZAS COVE DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/10/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: MATANZAS COVE LLC |
|
Address 185 CYPRESS POINT PKWY PALM CAOAST, FL 32137 |
|
Address SUITE 7 PALM CAOAST, FL 32137 |
| Lot: 2 |
| Contracted Stated Job Value: ¤290,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/12/2026 | APPROVED | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 5/12/2026 11:37:13 AM *** disreguard, Error added the final back for inspection. Onsite inspection. | |||
| BLD - BUILDING FINAL | 05/12/2026 | Disapproved - NO FEE | JSTEWART |
| Note: 1. Please replace temp cover to a weather resistant cover in back porch lanai. NEC 314.15 / NEC 314.25 / NEC 406.6 2.. Please submit a revision of energy calcs for AC equipment installed doesnt match. FBC [A] 107.4 3. The installation of a mini-split system transforms the garage into a "Conditioned Space" under FBC Energy Conservation Section R202. The existing overhead garage door is uninsulated and lacks proper air sealing, does not meet building thermal envelope requirements of Section R402.1.1. Garage overhead door will need to be insulated. | |||
| ROW - FINAL APRON (AFTER POUR) | 06/13/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW - STORMWATER FINAL | 06/13/2024 | APPROVED | EMADISON |
| Note: | |||
| U -UTILITY RESIDENTIAL FINAL | 06/13/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 *** NOTES ADDED BY LFITZGERALD 6/10/2024 1:12:40 PM *** well irrigation-no cross connection | |||
| MODEL HOME PARTIAL BUILDING FINAL | 06/12/2024 | FINAL APPROVED | MKRASKI |
| U-CROSS CONNECTION | 06/10/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/10/2024 1:12:40 PM *** well irrigation-no cross connection | |||
| MODEL HOME PARTIAL BUILDING FINAL | 06/10/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 6/10/2024 10:22:58 AM *** 1. Please relocate sprinkler head to Min 12" of Foundation wall. FBC Appendex F-C.Sprinkler installation.....Provide a minimum separation of 12 inches (305 mm) between sprinklers and buildings and other vertical structures. 2. Please raise HVAC equipment pads to Min 3" clearence of surrounding ground. FBCM 304.10 Clearances from grade 3. Please seal wall penetration at HW discharge Pipe. FBC R402.4, 4. Please seal dryer duct (unless dryer is installed). 504.4Exhaust installation | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/07/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/07/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/07/24 BUILDER NEEDS TO EXTEND THE SOD ACROSS REAR PROPERTY LINE TO COVER THE BARE EARTH THAT IS WITHIN THE DRAINAGE EASMENT ** BUILDER NEEDS TO RAISE THE POP-UP DRAINS SO THEY SIT ON TOP OF THE SOD NOT UNDERNEATH AS THEY WILL ERODE THE SOIL UNDER THE SOD | |||
| ROW- PRE-APRON (PRE-POUR) | 05/20/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 05/20/24 READY TO SET PAVERS _______________________________________________________________________________________________________________ 5/16/2024 - PREVIOUS INSPECTION NOTES ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 BUILDER NEEDS TO PROVIDE WHICH OPTION YOU ARE BUILDING YOUR DRIVEWAY IN ACCORDANCE WITH FROM THE OPTIONS FROM DRAWING #300.H FOR RESIDENTIAL PAVER DRIVEWAY DETAIL. THERE ARE (4) FOUR DIFFERENT OPTIOND BUILDER NEEDS TO CIRCLE WHICH OPTION SO THE INSPECTOR KNOWS WHICH DETAIL TO INSPECT FOR YOUR PAVER DRIVEWAY. ** INSPECTOR ALSO CHECKED THE PERMIT BOX ONSITE AND THERE ARE (0) NO DOCUMENTS INSIDE BOX AT ALL | |||
| ROW- PAVER RESTRAINTS | 05/16/2024 | APPROVED | EMADISON |
| Note: ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS | |||
| ROW- PRE-APRON (PRE-POUR) | 05/16/2024 | PARTIALLY APPROVED | EMADISON |
| Note: ** APRON READY TO POUR WITH PAVER RESTRAINT ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL ** SCHEDULE NEXT PRE-POUR ONCE PAVER BASE HAS BEEN SPREAD AND COMPACTED ** DO NOT SET PAVERS UNTIL NEXT PRE-POUR HAS BEEN APPROVED _____________________________________________________________________________________________________________________ 5/15/2024 - PREVIOUS INSPECTION NOTES ** 05/15/24 BUILDER NEEDS TO PROVIDE WHICH OPTION YOU ARE BUILDING YOUR DRIVEWAY IN ACCORDANCE WITH FROM THE OPTIONS FROM DRAWING #300.H FOR RESIDENTIAL PAVER DRIVEWAY DETAIL. THERE ARE (4) FOUR DIFFERENT OPTIOND BUILDER NEEDS TO CIRCLE WHICH OPTION SO THE INSPECTOR KNOWS WHICH DETAIL TO INSPECT FOR YOUR PAVER DRIVEWAY. ** INSPECTOR ALSO CHECKED THE PERMIT BOX ONSITE AND THERE ARE (0) NO DOCUMENTS INSIDE BOX AT ALL | |||
| ROW- PRE-APRON (PRE-POUR) | 05/15/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/15/24 BUILDER NEEDS TO PROVIDE WHICH OPTION YOU ARE BUILDING YOUR DRIVEWAY IN ACCORDANCE WITH FROM THE OPTIONS FROM DRAWING #300.H FOR RESIDENTIAL PAVER DRIVEWAY DETAIL. THERE ARE (4) FOUR DIFFERENT OPTIOND BUILDER NEEDS TO CIRCLE WHICH OPTION SO THE INSPECTOR KNOWS WHICH DETAIL TO INSPECT FOR YOUR PAVER DRIVEWAY. ** INSPECTOR ALSO CHECKED THE PERMIT BOX ONSITE AND THERE ARE (0) NO DOCUMENTS INSIDE BOX AT ALL | |||
| WATER METER INSTALLATION REQUEST | 05/08/2024 | APPROVED | CBOWERMASTER |
| Note: 5/6/2024 11:13:11 AM- PREVIOUS INSPECTION NOTES 4/23/2024 9:44:39 AM- PREVIOUS INSPECTION NOTES 8/1/2023 8:38:12 AM- PREVIOUS INSPECTION NOTES no meter allowed on model homes construction hydrant meter only | |||
| WATER METER INSTALLATION REQUEST | 05/03/2024 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: 4/23/2024 9:44:39 AM- PREVIOUS INSPECTION NOTES 8/1/2023 8:38:12 AM- PREVIOUS INSPECTION NOTES no meter allowed on model homes construction hydrant meter only | |||
| WATER METER INSTALLATION REQUEST | 04/17/2024 | Disapproved - NO FEE | CBOWERMASTER |
| Note: 8/1/2023 8:38:12 AM- PREVIOUS INSPECTION NOTES no meter allowed on model homes construction hydrant meter only | |||
| ELECTRIC - EARLY POWER | 01/04/2024 | APPROVED | RMARTIN |
| LATH/BRICK/ WATER BARRIER | 09/27/2023 | APPROVED | FWILLIS |
| INSULATION | 09/27/2023 | APPROVED | FWILLIS |
| ALL ROUGH | 09/25/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 09/15/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/11/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 9/8/2023 - PREVIOUS INSPECTION NOTES 09-11-2023 Sheet 4.0 taps cons at entry not installed as per plan. Check at next inspection. | |||
| WALL SHEATHING | 09/11/2023 | APPROVED | AGAETANO |
| Note: 9/8/2023 - PREVIOUS INSPECTION NOTES | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/08/2023 | CANCELLED BY APPLICANT | FWILLIS |
| WALL SHEATHING | 09/08/2023 | CANCELLED BY APPLICANT | FWILLIS |
| FOUND SURVEY APPROVED (OFFICE) | 08/23/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 08/15/2023 | APPROVED | FWILLIS |
| MONOLITHIC SLAB | 08/02/2023 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/27/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 07/27/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/27/2023 | Disapproved - NO FEE | CBOWERMASTER |
| Note: no meter allowed on model homes construction hydrant meter only | |||
| U - SEWER TIE IN | 07/27/2023 | APPROVED | MGIBSON |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 05/06/2026 | 05/11/2026 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/06/2026 | 05/11/2026 |
| Note: Released By: LIBBY RAYBURN - - LRAYBURN@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/23/2023 | 08/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2023 | 08/23/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/14/2023 | 08/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/06/2023 | 07/07/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Water/Sewer Impact Fees will be added at a later date after all utility agreements are final. | |||
| LOCATE | COMPLETE | 07/06/2023 | 07/06/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM locates will be done at a later date. | |||
| ELEC | COMPLETE | 06/21/2023 | 06/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 06/21/2023 | 06/22/2023 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Pending utility agreements | |||
| LOCATE | HOLD | 06/21/2023 | 06/23/2023 |
| Note: Held By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM pending Utility final | |||
| MECH | COMPLETE | 06/21/2023 | 06/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/21/2023 | 06/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/13/2023 | 06/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | HOLD | 06/13/2023 | 06/13/2023 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Pending Utility Agreements. For more information, please contact Irma Velez at 386-986-2355. | |||
| ELEC | HOLD | 06/13/2023 | 06/13/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electric load calcs need to include the mini split | |||
| ENGIN1 | COMPLETE | 06/13/2023 | 06/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/13/2023 | 06/13/2023 |
| LOCATE | HOLD | 06/13/2023 | 06/14/2023 |
| Note: Held By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM Utility system has not been accepted | |||
| MECH | HOLD | 06/13/2023 | 06/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide return air out of Den on duct layout | |||
| SW1 | COMPLETE | 06/13/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/13/2023 | 06/13/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/13/2023 | 06/14/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONNECTION FEES | ¤25.00 | 05/15/2024 |
| WATER-METER | ¤514.49 | 05/15/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/15/2024 |
| SEWER INSPECTION | ¤25.00 | 05/15/2024 |
| SEWER CAPITAL FACILITY | ¤545.24 | 05/15/2024 |
| WATER CAPITAL FACILITY FEE | ¤350.39 | 05/15/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/14/2024 |
| REINSPECTION FEE | ¤40.00 | 05/14/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/14/2024 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/10/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/10/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/10/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/10/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/10/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/10/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/10/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/10/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/10/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/10/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/10/2023 |
| SURCHARGE FS 533.721 | ¤5.27 | 07/10/2023 |
| SURCHARGE - FS 468.631 | ¤7.90 | 07/10/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/10/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/10/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/10/2023 |
| ADJUSTMENT 50% | (¤526.85) | 07/10/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/10/2023 |
| INSPECTION - RESIDENTIAL | ¤797.50 | 07/10/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤226.20 | 07/10/2023 |
| SITE PLAN 30 | ¤30.00 | 07/10/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/10/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/10/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/10/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/10/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤14,001.31 |