I want to search for...

Permit #2023060642

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00370-0100
CONDITIONED SPACE: 1862 sqft
GARAGE: 416 sqft
OPENED PORCH (WITH ROOF) : 18 sqft
Total Square Footage: 2296 sqft
Block: 00370
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 904-219-3385
Location Address: 19 PICKCANE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 06/28/2023
NOC: RECORDED
Applicant name: RAYMOND CLIVE CROSBY
Owner: D R HORTON INC

Address

4220 RACE TRACK ROAD SUITE 100

ST JOHNS, FL 32259

Lot: 0100
Contracted Stated Job Value: ¤186,200.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

DR HORTON, INC.
Status Location Address State License Number Phone Fax
ACTIVE

4220 RACE TRACK RD

SAINT JOHNS, FL 32259

CBC058997 (Exp: 08/31/2026) 904-268-2845 904-899-5992

Sub Contractors

JOSEPH H STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PKWY

SANFORD, FL 32771

CAC043953 (Exp: 08/31/2026) 877-906-1113
PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/06/2024 FINAL APPROVED MKRASKI
BLD - BUILDING FINAL 03/01/2024 Disapproved - NO FEE MKRASKI
Note: 1. Spare tub not draing 2. Pantry missing door knob
U -UTILITY RESIDENTIAL FINAL 03/01/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 has potable irr with DBL CHECK-no cross connection
ROW - STORMWATER FINAL 02/23/2024 APPROVED - AS NOTED FSLADISH
Note: 2/23/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/21/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH ACROSSED THE STREET OUT OF VACANT LOT 2) ALL DIRT AND OVER POURED CONCRETE NEEDS TO BE OUT OF CULVERT 3) ALL GRASS AGAINST THE FENCES NEED TO BE OFF FENCE 4"
ROW - STORMWATER FINAL 02/21/2024 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) NEED TO PICK UP ALL TRASH ACROSSED THE STREET OUT OF VACANT LOT 2) ALL DIRT AND OVER POURED CONCRETE NEEDS TO BE OUT OF CULVERT 3) ALL GRASS AGAINST THE FENCES NEED TO BE OFF FENCE 4"
U-CROSS CONNECTION 02/21/2024 APPROVED - AS NOTED LFITZGERALD
Note: has potable irr with DBL CHECK-no cross connection
ROW - FINAL APRON (AFTER POUR) 02/21/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/12/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/12/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 01/30/2024 APPROVED - AS NOTED JSTEWART
Note: 1/30/24- Authorize the release of email to FPL @ 10:15a
ROW- PRE-APRON (PRE-POUR) 12/14/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------ 12/13/2023 - PREVIOUS INSPECTION NOTES THE CULVERT IS FLOWING THE WRONG WAY NEED TO RESET CULVERT TO MEET ALL CITY'S STANDARDS Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW- PRE-APRON (PRE-POUR) 12/13/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: THE CULVERT IS FLOWING THE WRONG WAY NEED TO RESET CULVERT TO MEET ALL CITY'S STANDARDS Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
U - SEWER TIE IN 12/11/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 12/11/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
PEP TANK INSTALLATION REQUEST 11/22/2023 APPROVED CBOWERMASTER
INSULATION 11/16/2023 APPROVED KSANDOE
Note: New inspection due to canceled inspection Inspector Notes from Inspection 2420 5ft head test failed Bathroom exhaust vents need to be sealed at roof sheathing
INSULATION 11/14/2023 CANCELLED BY APPLICANT WEB
Note: Inspector Notes from Inspection 2420 5ft head test failed Bathroom exhaust vents need to be sealed at roof sheathing
LATH/BRICK/ WATER BARRIER 11/02/2023 APPROVED KSANDOE
ALL ROUGH 11/02/2023 APPROVED - AS NOTED KSANDOE
Note: 5ft head test failed Bathroom exhaust vents need to be sealed at roof sheathing
ROOF VALLEY & METAL 10/17/2023 APPROVED KSANDOE
WALL SHEATHING 09/28/2023 APPROVED KSANDOE
Note: 9/26/2023 - PREVIOUS INSPECTION NOTES Address not posted R319.1 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: ** Wall sheathing at garage return walls is not nailed as required on plans. Detail highlighted. Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met
WALL SHEATHING 09/26/2023 Disapproved -FEE REQUIRED KSANDOE
Note: Address not posted R319.1 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: ** Wall sheathing at garage return walls is not nailed as required on plans. Detail highlighted. Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met
WALL SHEATHING 09/22/2023 Disapproved - NO FEE RSIMS
Note: 9/22/23: ** Wall sheathing at garage return walls are not nailed as required on plans. Detail highlighted. Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/22/2023 APPROVED - AS NOTED RSIMS
Note: 9/22/23: Must be repaired by next inspection. ** Truss CJ01 on right side back is missing an anchor screw as required. Marked on wall below. Please make sure that site is free of any stray nail imbedded boards etc. so that it is safe to perform inspections. Braces with nails sticking out were lying in the house. Thanks Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met
FOUND SURVEY APPROVED (OFFICE) 09/06/2023 APPROVED TBAKER
MONOLITHIC SLAB 08/28/2023 APPROVED - AS NOTED KSANDOE
Note: At the time of inspection, minimum requirements for monolithic slab have been met
PLUMBING 1ST ROUGH UNDERGROUND 08/24/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/15/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 09/06/2023 09/06/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/06/2023 09/06/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 06/21/2023 06/22/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/21/2023 06/22/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 06/21/2023 06/28/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
SWALE COMPLETE 06/14/2023 07/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 06/13/2023 06/13/2023
Note: Released By: JPI
CUSVC COMPLETE 06/13/2023 06/15/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/13/2023 06/20/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/13/2023 06/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/13/2023 06/13/2023
LOCATE COMPLETE 06/13/2023 06/15/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH COMPLETE 06/13/2023 06/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 06/13/2023 06/21/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 06/13/2023 06/14/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood map number incorrect on site plan/survey
BADMIN COMPLETE 06/13/2023 06/15/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 03/06/2024
SW ENG REINSPECTION 20 ¤20.00 03/06/2024
SW ENG REINSPECTION 30 ¤30.00 03/06/2024
SW ENG - REVIEW 20 ¤20.00 06/28/2023
SW ENG RES REVIEW 200 ¤200.00 06/28/2023
TRANS IMPACT FEE ADMIN ¤54.36 06/28/2023
TRANS IMPACT FEE ADMIN (¤54.36) 06/28/2023
SEWER CREDIT (¤1,342.00) 06/28/2023
SEWER INSPECTION ¤25.00 06/28/2023
SEWER CAPITAL FACILITY ¤5,344.82 06/28/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 06/28/2023
SITE PLAN 30 ¤30.00 06/28/2023
WATER- TURN ON ¤25.00 06/28/2023
ADJUSTMENT 50% (¤410.36) 06/28/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 06/28/2023
INSPECTION - RESIDENTIAL ¤616.00 06/28/2023
PLAN REVIEW - RESIDENTIAL ¤174.72 06/28/2023
CONNECTION FEES ¤1,166.26 06/28/2023
FIRE IMPACT FEE ADMIN ¤12.62 06/28/2023
FIRE IMPACT FEE ADMIN (¤12.62) 06/28/2023
FC IMPACT FEE EMS ¤62.00 06/28/2023
IMPACT FEE FIRE ¤420.52 06/28/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 06/28/2023
FC IMPACT FEE LIBRARY ¤268.00 06/28/2023
IMPACT FEE PARKS ¤1,769.15 06/28/2023
IMPACT FEE SCHOOL ¤5,450.00 06/28/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 06/28/2023
WATER -IRRIGATION INSPECTION ¤25.00 06/28/2023
PARKS IMPACT FEE ADMIN ¤53.07 06/28/2023
PARKS IMPACT FEE ADMIN (¤53.07) 06/28/2023
SURCHARGE FS 533.721 ¤4.10 06/28/2023
SURCHARGE - FS 468.631 ¤6.16 06/28/2023
SW ENG - FOUNDATION SURVEY ¤20.00 06/28/2023
SW ENG INSPECTION 80 ¤80.00 06/28/2023
SW ENG PRE APRON ¤30.00 06/28/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,058.25