Permit #2023060642
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00370-0100 |
| CONDITIONED SPACE: 1862 sqft |
| GARAGE: 416 sqft |
| OPENED PORCH (WITH ROOF) : 18 sqft |
| Total Square Footage: 2296 sqft |
| Block: 00370 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 904-219-3385 |
| Location Address: 19 PICKCANE LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/28/2023 |
| NOC: RECORDED |
| Applicant name: RAYMOND CLIVE CROSBY |
| Owner: D R HORTON INC |
|
Address 4220 RACE TRACK ROAD SUITE 100 ST JOHNS, FL 32259 |
| Lot: 0100 |
| Contracted Stated Job Value: ¤186,200.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DR HORTON, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4220 RACE TRACK RD SAINT JOHNS, FL 32259 |
CBC058997 (Exp: 08/31/2026) | 904-268-2845 | 904-899-5992 |
Sub Contractors
JOSEPH H STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PKWY SANFORD, FL 32771 |
CAC043953 (Exp: 08/31/2026) | 877-906-1113 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/06/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 03/01/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Spare tub not draing 2. Pantry missing door knob | |||
| U -UTILITY RESIDENTIAL FINAL | 03/01/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 has potable irr with DBL CHECK-no cross connection | |||
| ROW - STORMWATER FINAL | 02/23/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/23/24 CORRECTIONS REQUIRED BY PREVIOUS INSPECTOR COMPLETED AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 2/21/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO PICK UP ALL TRASH ACROSSED THE STREET OUT OF VACANT LOT 2) ALL DIRT AND OVER POURED CONCRETE NEEDS TO BE OUT OF CULVERT 3) ALL GRASS AGAINST THE FENCES NEED TO BE OFF FENCE 4" | |||
| ROW - STORMWATER FINAL | 02/21/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO PICK UP ALL TRASH ACROSSED THE STREET OUT OF VACANT LOT 2) ALL DIRT AND OVER POURED CONCRETE NEEDS TO BE OUT OF CULVERT 3) ALL GRASS AGAINST THE FENCES NEED TO BE OFF FENCE 4" | |||
| U-CROSS CONNECTION | 02/21/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irr with DBL CHECK-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 02/21/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/12/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/12/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 01/30/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/30/24- Authorize the release of email to FPL @ 10:15a | |||
| ROW- PRE-APRON (PRE-POUR) | 12/14/2023 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ------------------------------------------------------------------------------------ 12/13/2023 - PREVIOUS INSPECTION NOTES THE CULVERT IS FLOWING THE WRONG WAY NEED TO RESET CULVERT TO MEET ALL CITY'S STANDARDS Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/13/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: THE CULVERT IS FLOWING THE WRONG WAY NEED TO RESET CULVERT TO MEET ALL CITY'S STANDARDS Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| U - SEWER TIE IN | 12/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 12/11/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 11/22/2023 | APPROVED | CBOWERMASTER |
| INSULATION | 11/16/2023 | APPROVED | KSANDOE |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 2420 5ft head test failed Bathroom exhaust vents need to be sealed at roof sheathing | |||
| INSULATION | 11/14/2023 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 2420 5ft head test failed Bathroom exhaust vents need to be sealed at roof sheathing | |||
| LATH/BRICK/ WATER BARRIER | 11/02/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 11/02/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: 5ft head test failed Bathroom exhaust vents need to be sealed at roof sheathing | |||
| ROOF VALLEY & METAL | 10/17/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 09/28/2023 | APPROVED | KSANDOE |
| Note: 9/26/2023 - PREVIOUS INSPECTION NOTES Address not posted R319.1 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: ** Wall sheathing at garage return walls is not nailed as required on plans. Detail highlighted. Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met | |||
| WALL SHEATHING | 09/26/2023 | Disapproved -FEE REQUIRED | KSANDOE |
| Note: Address not posted R319.1 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23: ** Wall sheathing at garage return walls is not nailed as required on plans. Detail highlighted. Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met | |||
| WALL SHEATHING | 09/22/2023 | Disapproved - NO FEE | RSIMS |
| Note: 9/22/23: ** Wall sheathing at garage return walls are not nailed as required on plans. Detail highlighted. Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/22/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 9/22/23: Must be repaired by next inspection. ** Truss CJ01 on right side back is missing an anchor screw as required. Marked on wall below. Please make sure that site is free of any stray nail imbedded boards etc. so that it is safe to perform inspections. Braces with nails sticking out were lying in the house. Thanks Inspector Notes from Inspection 2250 At the time of inspection, minimum requirements for monolithic slab have been met | |||
| FOUND SURVEY APPROVED (OFFICE) | 09/06/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/28/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: At the time of inspection, minimum requirements for monolithic slab have been met | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/24/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/15/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 09/06/2023 | 09/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/06/2023 | 09/06/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/21/2023 | 06/22/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/21/2023 | 06/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/21/2023 | 06/28/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/14/2023 | 07/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/13/2023 | 06/13/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/13/2023 | 06/15/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/13/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/13/2023 | 06/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/13/2023 | 06/13/2023 |
| LOCATE | COMPLETE | 06/13/2023 | 06/15/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/13/2023 | 06/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/13/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/13/2023 | 06/14/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood map number incorrect on site plan/survey | |||
| BADMIN | COMPLETE | 06/13/2023 | 06/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/06/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/06/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/06/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/28/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/28/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/28/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/28/2023 |
| SEWER CREDIT | (¤1,342.00) | 06/28/2023 |
| SEWER INSPECTION | ¤25.00 | 06/28/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/28/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/28/2023 |
| SITE PLAN 30 | ¤30.00 | 06/28/2023 |
| WATER- TURN ON | ¤25.00 | 06/28/2023 |
| ADJUSTMENT 50% | (¤410.36) | 06/28/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/28/2023 |
| INSPECTION - RESIDENTIAL | ¤616.00 | 06/28/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤174.72 | 06/28/2023 |
| CONNECTION FEES | ¤1,166.26 | 06/28/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/28/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/28/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/28/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/28/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/28/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/28/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/28/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/28/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/28/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/28/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/28/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/28/2023 |
| SURCHARGE FS 533.721 | ¤4.10 | 06/28/2023 |
| SURCHARGE - FS 468.631 | ¤6.16 | 06/28/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/28/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/28/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/28/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,058.25 |