Permit #2023060731
Permit Details
Status: COED
| Parcel Id: 28-10-30-5415-00000-0320 |
| CONDITIONED SPACE: 1698 sqft |
| GARAGE: 407 sqft |
| OPENED PORCH (WITH ROOF) : 37 sqft |
| Total Square Footage: 2142 sqft |
| Subdivision: 2310 - SAWMILL BRANCH 2A |
| Job Phone: 904-219-3385 |
| Location Address: 10 HULETT WOODS RD |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/25/2023 |
| NOC: RECORDED |
| Applicant name: RAYMOND CLIVE CROSBY |
| Owner: D R HORTON INC |
|
Address 4220 RACE TRACK ROAD SAINT JOHNS, FL 32259 |
| Lot: 32 |
| Contracted Stated Job Value: ¤169,800.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DR HORTON, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4220 RACE TRACK RD SAINT JOHNS, FL 32259 |
CBC058997 (Exp: 08/31/2026) | 904-268-2845 | 904-899-5992 |
Sub Contractors
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/12/2023 | APPROVED | RSIMS |
| U -UTILITY RESIDENTIAL FINAL | 12/12/2023 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 12/11/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 12/06/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/06/2023 | APPROVED | GBERTOLA |
| Note: 12/06/23= AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ** 11/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. * Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/06/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW - STORMWATER FINAL | 12/06/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ELECTRIC - EARLY POWER | 11/08/2023 | APPROVED - AS NOTED | MKRASKI |
| Note: - Authorize release of email to FPL @ 11:16a. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/07/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 11/07/23 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. * Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. | |||
| U - SEWER TIE IN | 10/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 10/11/2023 | APPROVED | RSIMS |
| ALL ROUGH | 10/04/2023 | APPROVED | RMARTIN |
| Note: 9/29/2023 - PREVIOUS INSPECTION NOTES 9/29/23- Not ready. Electric wireing incomplete (3 romex hanging from ceiling and not to termination point. | |||
| LATH/BRICK/ WATER BARRIER | 09/29/2023 | APPROVED | JSTEWART |
| ALL ROUGH | 09/29/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 9/29/23- Not ready. Electric wireing incomplete (3 romex hanging from ceiling and not to termination point. | |||
| ELECTRIC-TUG | 09/19/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 9/19/23- Authorize release of email to FPL @ 11:36a. | |||
| ROOF VALLEY & METAL | 09/06/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 08/25/2023 | APPROVED | TSTAUFFACHER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2023 | APPROVED | TSTAUFFACHER |
| FOUND SURVEY APPROVED (OFFICE) | 08/17/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/09/2023 | APPROVED | JSTEWART |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/04/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/03/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/17/2023 | 08/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/17/2023 | 08/17/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/24/2023 | 07/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/14/2023 | 07/17/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition (Third Request) HOUSE FACES NORTH EAST | |||
| ELEC | COMPLETE | 06/22/2023 | 06/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/22/2023 | 06/22/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition (Second Request) | |||
| URB | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/14/2023 | 06/14/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/14/2023 | 06/15/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/14/2023 | 06/20/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 M. Bed | |||
| ENGIN1 | COMPLETE | 06/14/2023 | 06/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/14/2023 | 06/14/2023 |
| LOCATE | COMPLETE | 06/14/2023 | 06/20/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/14/2023 | 06/15/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 06/14/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/14/2023 | 06/16/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/14/2023 | 06/15/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 07/25/2023 |
| WATER-METER | ¤419.86 | 07/25/2023 |
| ADJUSTMENT 50% | (¤378.59) | 07/25/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/25/2023 |
| INSPECTION - RESIDENTIAL | ¤566.50 | 07/25/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤160.68 | 07/25/2023 |
| CONNECTION FEES | ¤25.00 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/25/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/25/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/25/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/25/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/25/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/25/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/25/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/25/2023 |
| SURCHARGE FS 533.721 | ¤3.79 | 07/25/2023 |
| SURCHARGE - FS 468.631 | ¤5.68 | 07/25/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/25/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/25/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/25/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/25/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/25/2023 |
| SEWER INSPECTION | ¤25.00 | 07/25/2023 |
| SEWER CAPITAL FACILITY | ¤2,803.23 | 07/25/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,605.24 | 07/25/2023 |
| SITE PLAN 30 | ¤30.00 | 07/25/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,675.45 |