I want to search for...
Permit #2023060739
Permit Details
Status: COED
| CONDITIONED SPACE: 2147 sqft |
| GARAGE: 557 sqft |
| OPENED PORCH (WITH ROOF) : 54 sqft |
| PATIO/DECK (NO ROOF) : 70 sqft |
| Total Square Footage: 2828 sqft |
| Subdivision: 2310 - SAWMILL BRANCH 2A |
| Job Phone: 904-219-3385 |
| Location Address: 43 SUMMERWOOD RD S |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2023 |
| NOC: RECORDED |
| Applicant name: RAYMOND CLIVE CROSBY |
| Owner: D R HORTON INC |
|
Address 4220 RACE TRACK ROAD SAINT JOHNS, FL 32259 |
| Contracted Stated Job Value: ¤214,700.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
DR HORTON, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4220 RACE TRACK RD SAINT JOHNS, FL 32259 |
CBC058997 (Exp: 08/31/2026) | 904-268-2845 | 904-899-5992 |
Sub Contractors
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - STORMWATER FINAL | 12/07/2023 | APPROVED | GBERTOLA |
| Note: AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. +++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 11/16/2023 - PREVIOUS INSPECTION NOTES ** 11/16/23 NEED TO CLEAN UP ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE AND NATURAL AREA IN REAR ** EXTEND SOD ON EXPOSED EARTH TO NATURAL AREA | |||
| U -UTILITY RESIDENTIAL FINAL | 11/16/2023 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 11/16/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 11/16/23 NEED TO CLEAN UP ALL TRASH AND CONSTRUCTION DEBRIS FROM SITE AND NATURAL AREA IN REAR ** EXTEND SOD ON EXPOSED EARTH TO NATURAL AREA | |||
| U-CROSS CONNECTION | 11/16/2023 | APPROVED | DHANEY |
| BLD - BUILDING FINAL | 11/16/2023 | FINAL APPROVED | JSTEWART |
| ROW - FINAL APRON (AFTER POUR) | 11/03/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/03/2023 | APPROVED | PFLANAGAN |
| Note: THE SURVEY SHOWS A LOW SPOT ON THE RIGHT SIDE DRAINAGE PATTERN BUT IN THE FIELD IT IS FINE PASSING AS NOTED | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/03/2023 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/10/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/10/23 CORRECTION MADE ** 10/10/23 READY TO POUR APRON ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Sec.900.04C Residential driveways shall be constructed using material with a minimum of three thousand pounds (3,000 Ibs.) per square inch with Fiber or wire mesh. 10/9/2023 - PREVIOUS INSPECTION NOTES ** 10/09/23 LARGE CLUMPS OF MATERIAL IN ROW AND SIDEWALK AREAS NEED COMPACTION TOO SOFT | |||
| ROW- PRE-APRON (PRE-POUR) | 10/09/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 10/09/23 LARGE CLUMPS OF MATERIAL IN ROW AND SIDEWALK AREAS NEED COMPACTION TOO SOFT | |||
| ELECTRIC - EARLY POWER | 10/09/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 10/9/23: FPL emailed to release power. Please remember to add a 2nd clamp to MC cable under kitchen sink before Building Final. Inspector Notes from Inspection 2200 8/25/23: FPL emailed at @ 12:00. | |||
| GRAVITY SEWER TEST | 09/12/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 09/12/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 09/07/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 9/1/23: Must be complete prior to Insulation Inspection. Check at Insulation. 1). No 5ft head pressure. 2). Bathroom exhaust fan flexible ducts are damaged (crushed) where they enter the soffit area. Will need to be replaced with new pipe (and transition fittings if needed). | |||
| LATH/BRICK/ WATER BARRIER | 09/01/2023 | APPROVED | RSIMS |
| ALL ROUGH | 09/01/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 9/1/23: Must be complete prior to Insulation Inspection. Check at Insulation. 1). No 5ft head pressure. 2). Bathroom exhaust fan flexible ducts are damaged (crushed) where they enter the soffit area. Will need to be replaced with new pipe (and transition fittings if needed). | |||
| ELECTRIC-TUG | 08/25/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 8/25/23: FPL emailed at @ 12:00. | |||
| ROOF VALLEY & METAL | 08/15/2023 | APPROVED | RSIMS |
| Note: 8/9/2023 - PREVIOUS INSPECTION NOTES 8/9/23- Unable to aprove until Roof sheathing/braces/ties/down cells inspection is scheduled and aproved prior. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/14/2023 | APPROVED | FWILLIS |
| Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: Permit box needs attention. (Laying on the ground). Need legible documents. *** No approved plans in box for inspection. MiTek packet is wet & destroyed. (FBC R107.3.1) 8/11/23 - PERMIT BOX INSTALLED AT 6' TO THE BOTTOM. SAFETY HAZARD WHEN REMOVING DOCUMENTS. SET TO HEIGHT OF THE OTHER MANY PERMIT BOXES ON SITE. | |||
| WALL SHEATHING | 08/11/2023 | APPROVED | FWILLIS |
| Note: 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: Permit box needs attention. (Laying on the ground). Need legible documents. *** No approved plans in box for inspection. (FBC R107.3.1) | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/11/2023 | Disapproved - NO FEE | FWILLIS |
| Note: 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: Permit box needs attention. (Laying on the ground). Need legible documents. *** No approved plans in box for inspection. MiTek packet is wet & destroyed. (FBC R107.3.1) 8/11/23 - PERMIT BOX INSTALLED AT 6' TO THE BOTTOM. SAFETY HAZARD WHEN REMOVING DOCUMENTS. SET TO HEIGHT OF THE OTHER MANY PERMIT BOXES ON SITE. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/10/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 8/10/23: Permit box needs attention. (Laying on the ground). Need legible documents. *** No approved plans in box for inspection. MiTek packet is wet & destroyed. (FBC R107.3.1) | |||
| WALL SHEATHING | 08/10/2023 | Disapproved - NO FEE | RSIMS |
| Note: 8/10/23: Permit box needs attention. (Laying on the ground). Need legible documents. *** No approved plans in box for inspection. (FBC R107.3.1) | |||
| ROOF VALLEY & METAL | 08/09/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 8/9/23- Unable to aprove until Roof sheathing/braces/ties/down cells inspection is scheduled and aproved prior. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/01/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/21/2023 | APPROVED | JSTEWART |
| Note: 7/20/2023 - PREVIOUS INSPECTION NOTES 7/20/23- Please remove large vegitation in footing line touching Reinforcement bar. No Aproved Plans onsite. | |||
| MONOLITHIC SLAB | 07/20/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 7/20/23- Please remove large vegitation in footing line touching Reinforcement bar. No Aproved Plans onsite. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/17/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 07/17/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/14/2023 | 06/14/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/14/2023 | 06/15/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/14/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/14/2023 | 06/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/14/2023 | 06/20/2023 |
| LOCATE | COMPLETE | 06/14/2023 | 06/23/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/14/2023 | 06/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Square footage on Energy Calcs does not match the house plans 2. Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 06/14/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/14/2023 | 06/15/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 06/14/2023 | 06/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/11/2023 |
| SW ENG REINSPECTION 30 | ¤30.00 | 12/11/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/12/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/12/2023 |
| SEWER INSPECTION | ¤25.00 | 07/12/2023 |
| SEWER CAPITAL FACILITY | ¤2,803.23 | 07/12/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,605.24 | 07/12/2023 |
| SITE PLAN 30 | ¤30.00 | 07/12/2023 |
| WATER-METER | ¤505.39 | 07/12/2023 |
| WATER-METER | ¤419.86 | 07/12/2023 |
| ADJUSTMENT 50% | (¤484.49) | 07/12/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/12/2023 |
| INSPECTION - RESIDENTIAL | ¤731.50 | 07/12/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤207.48 | 07/12/2023 |
| CONNECTION FEES | ¤25.00 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/12/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/12/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/12/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/12/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/12/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/12/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/12/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/12/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/12/2023 |
| SURCHARGE FS 533.721 | ¤4.84 | 07/12/2023 |
| SURCHARGE - FS 468.631 | ¤7.27 | 07/12/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/12/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/12/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/12/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,853.99 |