I want to search for...
Permit #2023060784
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00200-0090 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00200 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 831-383-2883 |
| Location Address: 8 LYNDENHURST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/04/2023 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II, LLC |
|
Address 7345 GREENBRIAR PKWY ORLANDO, FL 32819 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤220,324.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/29/2024 | FINAL APPROVED | JSTEWART |
| ROW - STORMWATER FINAL | 04/29/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/23/2024 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 04/16/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 4/16/24 YOU NEED TO CLEAN ALL DIRT/SILT FROM THE CULVERT PIPES AND FIX ANY AREAS IT MAY HAVE WASHED OUT OF. NOT GOING TO FEE YOU TODAY AS I WAS ALREADY HERE FOR THE AFTERPOUR INSPECTION. | |||
| ROW - FINAL APRON (AFTER POUR) | 04/16/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/16/24 PIPE IS GOOD. CUTS NOW MADE. CULVERT HAS DIRT (WILL BE ADDRESSED ON ROW FINAL) HOT PATCH COMPLETED. APPROVING AS NOTED. _______________________________________________________________________________________________________________________ 3/27/2024 - PREVIOUS INSPECTION NOTES 3/27/24 YOU DO NOT HAVE YOUR COPC MINIMUM DRIVEWAY SAWCUTS. SEE TECHNICAL MANUAL DRAWING 300.E FOR SPECIFICATIONS. YOU WILL NEED TO MEET THE COPC MINIMUM STANDARDS BEFORE AFTER POUR INSPECTION WILL PASS. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/26/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. YOU WILL NEED TO HAVE A 4" GAP BETWEEN THE SOD AND ANY FENCING OR HAVE IT END BELOW THE FENCE LINE BOTTOM. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. APPROVING THIS FIELD SURVEY AS NOTED. OTHER CORRECTIONS MAY BE REQUIRED BETWEEN THIS INSPECTION AND ANY ADDITIONAL INSPECTIONS DEPENDING ON FIELD CONDITIONS AT THE TIME OF THOSE INSPECTIONS. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/27/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 3/27/24 YOU DO NOT HAVE YOUR COPC MINIMUM DRIVEWAY SAWCUTS. SEE TECHNICAL MANUAL DRAWING 300.E FOR SPECIFICATIONS. YOU WILL NEED TO MEET THE COPC MINIMUM STANDARDS BEFORE AFTER POUR INSPECTION WILL PASS. PHOTO ENCLOSED FOR REFERENCE. __________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/26/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. YOU WILL NEED TO HAVE A 4" GAP BETWEEN THE SOD AND ANY FENCING OR HAVE IT END BELOW THE FENCE LINE BOTTOM. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. APPROVING THIS FIELD SURVEY AS NOTED. OTHER CORRECTIONS MAY BE REQUIRED BETWEEN THIS INSPECTION AND ANY ADDITIONAL INSPECTIONS DEPENDING ON FIELD CONDITIONS AT THE TIME OF THOSE INSPECTIONS. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/27/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/26/2024 | APPROVED | FSLADISH |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/26/24 UPON WALKING PROPERTY DETERMINED THAT DRAINAGE WILL WORK AS INDICATED. YOU WILL NEED TO HAVE A 4" GAP BETWEEN THE SOD AND ANY FENCING OR HAVE IT END BELOW THE FENCE LINE BOTTOM. No backfilling against a fence. Sec 300.03 C1d / Sec 300.04 b6 Sec 300.03 C1d Backfilling against existing fencing is not permitted. Backfilling against existing fencing is not permitted and new sod shall not be higher than the bottom of the fence. APPROVING THIS FIELD SURVEY AS NOTED. OTHER CORRECTIONS MAY BE REQUIRED BETWEEN THIS INSPECTION AND ANY ADDITIONAL INSPECTIONS DEPENDING ON FIELD CONDITIONS AT THE TIME OF THOSE INSPECTIONS. | |||
| U-CROSS CONNECTION | 03/26/2024 | APPROVED | DHANEY |
| ELECTRIC - EARLY POWER | 03/13/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2200 12/8/23- Authorize release of email to FPL @ 2:30p. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/28/2024 | APPROVED | TPOLACEK |
| Note: 02/28/24 CORRECTIONS WERE MADE AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. --------------------------------------------------------------------------------------------- 2/26/2024 - PREVIOUS INSPECTION NOTES ** 02/27/24 APRON AREA AND THE ROW NEED COMPACTION OF MATERIAL IT IS TO SOFT AND LOOSE FOOT SINKS AND MATERIAL SLIPS UNDER WEIGHT ** AREA ABOVE ROW IN DRIVEWAY POUR AREA NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE LEFT ONE STRINGLINE IN PLACE _____________________________________________________________________________________________________________________ 2/23/2024 - PREVIOUS INSPECTION NOTES ** 02/23/24 SITE NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 02/26/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/27/24 APRON AREA AND THE ROW NEED COMPACTION OF MATERIAL IT IS TO SOFT AND LOOSE FOOT SINKS AND MATERIAL SLIPS UNDER WEIGHT ** AREA ABOVE ROW IN DRIVEWAY POUR AREA NEEDS TO HAVE A MINIMUM OF 4 INCHES OF CONCRETE LEFT ONE STRINGLINE IN PLACE _____________________________________________________________________________________________________________________ 2/23/2024 - PREVIOUS INSPECTION NOTES ** 02/23/24 SITE NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 02/23/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/23/24 SITE NOT READY FOR PRE-POUR INSPECTION ** SEE ATTACHED PHOTOS | |||
| U - SEWER TIE IN | 02/05/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 02/05/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 01/24/2024 | APPROVED | BVITALE |
| INSULATION | 01/18/2024 | CANCELLED BY APPLICANT | WEB |
| INSULATION | 01/18/2024 | APPROVED | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 01/17/2024 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 1/16/24- Please bond metal outlet box by Hot water supply. Please install Nail Plates in the following areas- At hot water supply stud. BP at hot water supply, Spare bath water supply backside in bedroom. WILL CHECK AT INSULATION. 1/10/2024 - PREVIOUS INSPECTION NOTES 1-10-2024 Electric not installed on interior | |||
| ALL ROUGH | 01/16/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/16/24- Please bond metal outlet box by Hot water supply. Please install Nail Plates in the following areas- At hot water supply stud. BP at hot water supply, Spare bath water supply backside in bedroom. WILL CHECK AT INSULATION. 1/10/2024 - PREVIOUS INSPECTION NOTES 1-10-2024 Electric not installed on interior | |||
| ALL ROUGH | 01/10/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1-10-2024 Electric not installed on interior | |||
| ROOF VALLEY & METAL | 01/09/2024 | APPROVED | FWILLIS |
| WALL SHEATHING | 12/22/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/22/2023 | APPROVED | FWILLIS |
| ELECTRIC-TUG | 12/08/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 12/8/23- Authorize release of email to FPL @ 2:30p. | |||
| TIE BEAM / LINTEL | 11/29/2023 | APPROVED | FWILLIS |
| Note: 11/28/2023 - PREVIOUS INSPECTION NOTES 1. Missing down rod in @ entry, marked on plans 2. 3 high windows (front left of home) appear to call for double #5 downrods/dowels, marked on print 3. Change of tie beam hight on front of home needs to be tied from high to lower areas, marked on print 4. Check all clean outs and make sure they are free from debris | |||
| TIE BEAM / LINTEL | 11/28/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Missing down rod in @ entry, marked on plans 2. 3 high windows (front left of home) appear to call for double #5 downrods/dowels, marked on print 3. Change of tie beam hight on front of home needs to be tied from high to lower areas, marked on print 4. Check all clean outs and make sure they are free from debris | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/27/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/17/2023 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/14/2023 | APPROVED | MGIBSON |
| Note: 11/13/2023 - PREVIOUS INSPECTION NOTES NOT HOLDING HEAD TEST ON DWV 5' MIN | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/13/2023 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NOT HOLDING HEAD TEST ON DWV 5' MIN | |||
| WATER METER INSTALLATION REQUEST | 09/21/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 04/02/2024 | 04/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | HOLD | 01/04/2024 | 01/05/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. You need to be more clear on whats changing. What are can lights in the seal. Documents seem to be the same besides the date stamped. | |||
| BLD | HOLD | 01/03/2024 | 01/04/2024 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet must have a shop drawing approval stamp by engineer of record for the house. | |||
| ENGIN1 | COMPLETE | 11/22/2023 | 11/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/22/2023 | 11/22/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 11/15/2023 | 11/15/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 11/13/2023 | 11/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/02/2023 | 08/02/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM Accepted EOR's approval stamp on truss layout sheet instead of truss cover sheet. | |||
| BLD | HOLD | 07/24/2023 | 07/24/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| BLD | HOLD | 07/14/2023 | 07/17/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| BLD | HOLD | 06/26/2023 | 06/27/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| MECH | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/26/2023 | 06/27/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| ELEC | COMPLETE | 06/26/2023 | 06/29/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/26/2023 | 06/26/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | HOLD | 06/15/2023 | 06/19/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/15/2023 | 06/20/2023 |
| LOCATE | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/15/2023 | 06/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout signed by the AC contractor | |||
| SW1 | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/15/2023 | 06/16/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide front entry walkway material on site plan | |||
| SWALE | COMPLETE | 06/15/2023 | 07/27/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 04/29/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/29/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/29/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/29/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/29/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/04/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/04/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/04/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/04/2023 |
| SEWER CREDIT | (¤1,466.00) | 08/04/2023 |
| SEWER INSPECTION | ¤25.00 | 08/04/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/04/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/04/2023 |
| SITE PLAN 30 | ¤30.00 | 08/04/2023 |
| CONNECTION FEES | ¤1,166.26 | 08/04/2023 |
| WATER- TURN ON | ¤25.00 | 08/04/2023 |
| ADJUSTMENT 50% | (¤512.73) | 08/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/04/2023 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 08/04/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 08/04/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/04/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/04/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/04/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/04/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/04/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/04/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/04/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/04/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/04/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/04/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/04/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/04/2023 |
| SURCHARGE FS 533.721 | ¤5.13 | 08/04/2023 |
| SURCHARGE - FS 468.631 | ¤7.69 | 08/04/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/04/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/04/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,161.68 |