I want to search for...
Permit #2023060796
Permit Details
Status: COED
| Parcel Id: 07-11-31-7014-00070-0710 |
| CONDITIONED SPACE: 1992 sqft |
| GARAGE: 674 sqft |
| OPENED PORCH (WITH ROOF) : 333 sqft |
| Total Square Footage: 2999 sqft |
| Block: 00070 |
| Subdivision: 2202 - SECTION 14-COUNTRY CLUB COVE |
| Job Phone: 386-445-9009 |
| Location Address: 12 CROSSGATE CT E |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 06/27/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: STEINMULLER MICHAEL & CLAUDIA STEINMULLER JTWROS |
|
Address 860 HILLCREST DRIVE ORIENT, NY 11957 |
| Lot: 0710 |
| Contracted Stated Job Value: ¤340,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
ANDREW SCOTT DIGAETANO JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
44 FORT CAROLINE PALM COAST, FL 32137 |
CCC1331606 (Exp: 08/31/2026) | 386-302-9063 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
48 EAGLE LAKES DRIVE FLAGLER BEACH, FL 32136 |
CAC048127 (Exp: 08/31/2026) | 386-597-3280 |
DONALD WALLS JR
| Status | Location Address | State License Number | Phone |
| INACTIVE |
2860 S US HIGHWAY 17 , 0 |
LQ35326 (Exp: 04/04/2025) | 386-698-1033 |
DENNIS GENE GAINEY
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
P.O. BOX 1203 Bunnell, FL 32110 |
CFC046004 (Exp: 08/31/2026) | (386) 437-5637 | 386-437-3012 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/15/2024 | FINAL APPROVED | JWALKER |
| ROW - FINAL APRON (AFTER POUR) | 05/13/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 05/13/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 05/09/2024 | FINAL APPROVED | LFITZGERALD |
| U-CROSS CONNECTION | 05/09/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/9/2024 2:24:03 PM *** has potable irrigation with PVB-no cross connectin | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/08/2024 | APPROVED | EMADISON |
| Note: Inspector Notes from Inspection 9270 4/15/24 PIPE IS GOOD. YOU NEED TO TURN DOWN THE CULVERT PIPE BAND BOLTS SO THE ARE NOT IN THE POUR AT TOP OF PIPE. FOR FUTURE REFERENCE YOU NEED TO HAVE THE CUVERT END FOOTERS NO LONGER THAN 6" IN LENGTH TO THE BACK FORMBOARD. THEY ARE A BIT LONG. OTHERWISE YOU WILL BE CUTTING THE ADDITIONAL OVERPOUR OUT LATER. APPROVING TJIS INSPECTION AS NOTED. MAKE SURE YOU TURN THE BOLTS. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/08/2024 | APPROVED - AS NOTED | EMADISON |
| Note: *** NOTES ADDED BY EMADISON 5/8/2024 9:12:51 AM *** ** 05/08/24 ALONG RIGHT SIDE PROPERTY LINE OF VACANT BUILDER NEEDS TO CREATE A 2:1 BEFORE THE ROW FINAL IN APPROVED (NOTE AREAS OF WHITE PAINT) | |||
| ELEVATION CERTIFICATE-FINAL APPROVAL | 05/08/2024 | APPROVED | JMYERS |
| ROW- PRE-APRON (PRE-POUR) | 04/15/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/15/24 PIPE IS GOOD. YOU NEED TO TURN DOWN THE CULVERT PIPE BAND BOLTS SO THE ARE NOT IN THE POUR AT TOP OF PIPE. FOR FUTURE REFERENCE YOU NEED TO HAVE THE CUVERT END FOOTERS NO LONGER THAN 6" IN LENGTH TO THE BACK FORMBOARD. THEY ARE A BIT LONG. OTHERWISE YOU WILL BE CUTTING THE ADDITIONAL OVERPOUR OUT LATER. APPROVING TJIS INSPECTION AS NOTED. MAKE SURE YOU TURN THE BOLTS. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 03/12/2024 | APPROVED | AGAETANO |
| LATH/BRICK/ WATER BARRIER | 02/23/2024 | APPROVED | AGAETANO |
| INSULATION | 01/29/2024 | APPROVED | AGAETANO |
| ALL ROUGH | 01/25/2024 | APPROVED | AGAETANO |
| Note: 01-25-2024 Gas rough inspected and approved. | |||
| WALL SHEATHING | 01/18/2024 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/18/2024 | APPROVED | AGAETANO |
| ROOF VALLEY & METAL | 01/18/2024 | APPROVED | AGAETANO |
| ELEV CERT-FOUNDATION APPROVAL | 01/17/2024 | APPROVED | JMYERS |
| Note: The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| TIE BEAM / LINTEL | 12/21/2023 | APPROVED | AGAETANO |
| Note: 12/20/2023 - PREVIOUS INSPECTION NOTES 12-20-2023 1. Missed dowel 2. Clearance of rebar not met at CMU. Please see highlighted notes on drawings. | |||
| TIE BEAM / LINTEL | 12/20/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 12-20-2023 1. Missed dowel 2. Clearance of rebar not met at CMU. Please see highlighted notes on drawings. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/15/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/01/2023 | APPROVED | AGAETANO |
| Note: 11/30/2023 - PREVIOUS INSPECTION NOTES 11/29/2023 - PREVIOUS INSPECTION NOTES 11/28/2023 - PREVIOUS INSPECTION NOTES 11-28-23 1. Drill and epoxy bottom rebar of turn down footing into stem wall footing. Left side of building. ( Shower area). 2. UFER not visible. 3. Please tamp area. Check all. 4. Clearance on rebar. Check all. 5. Plumbing lines over column pad. Inspection stopped. 11-29-2023 Above issue not resolved. Plumbing lines installed over coulmn pad. Highlighted on previous inspection. | |||
| MONOLITHIC SLAB | 11/30/2023 | CANCELLED BY APPLICANT | AGAETANO |
| Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 11/28/2023 - PREVIOUS INSPECTION NOTES 11-28-23 1. Drill and epoxy bottom rebar of turn down footing into stem wall footing. Left side of building. ( Shower area). 2. UFER not visible. 3. Please tamp area. Check all. 4. Clearance on rebar. Check all. 5. Plumbing lines over column pad. Inspection stopped. 11-29-2023 Above issue not resolved. Plumbing lines installed over coulmn pad. Highlighted on previous inspection. | |||
| MONOLITHIC SLAB | 11/29/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 11/28/2023 - PREVIOUS INSPECTION NOTES 11-28-23 1. Drill and epoxy bottom rebar of turn down footing into stem wall footing. Left side of building. ( Shower area). 2. UFER not visible. 3. Please tamp area. Check all. 4. Clearance on rebar. Check all. 5. Plumbing lines over column pad. Inspection stopped. 11-29-2023 Above issue not resolved. Plumbing lines installed over coulmn pad. Highlighted on previous inspection. | |||
| MONOLITHIC SLAB | 11/28/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 11-28-23 1. Drill and epoxy bottom rebar of turn down footing into stem wall footing. Left side of building. ( Shower area). 2. UFER not visible. 3. Please tamp area. Check all. 4. Clearance on rebar. Check all. 5. Plumbing lines over column pad. Inspection stopped. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/13/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 11/13/2023 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 11/13/2023 | APPROVED | MGIBSON |
| DOWN CELL | 08/31/2023 | APPROVED | FWILLIS |
| STEM WALL FOUNDATION | 08/10/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-10-23 1. Stemwall is not built per detail. | |||
| STEM WALL FOUNDATION | 08/10/2023 | APPROVED | BTAYLOR |
| Note: 8/10/2023 - PREVIOUS INSPECTION NOTES 8-10-23 1. Stemwall is not built per detail. | |||
| WATER METER INSTALLATION REQUEST | 07/24/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| PLFM | COMPLETE | 05/07/2024 | 05/08/2024 |
| Note: Released By: JERRY REITER - - JREITER@PALMCOASTGOV.COM Final Elevation certificate has been approved. | |||
| PLFM | COMPLETE | 01/16/2024 | 01/17/2024 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The Foundation elevation certificate has been approved. Please provide Final prior to receiving CO. | |||
| ENGIN1 | COMPLETE | 12/14/2023 | 12/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/14/2023 | 12/15/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/30/2023 | 11/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 09/20/2023 | 09/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 09/20/2023 | 09/25/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/24/2023 | 08/31/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 08/01/2023 | 08/02/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The additional construction elevation certificate was rejected, one was already approved. | |||
| GAS | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLFM | CANCEL | 06/23/2023 | 06/23/2023 |
| ZON | COMPLETE | 06/23/2023 | 06/23/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLFM | COMPLETE | 06/21/2023 | 06/22/2023 |
| Note: Released By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM The construction elevation certificate has been approved. Please provide foundation and final prior to receiving CO. | |||
| GAS | HOLD | 06/21/2023 | 06/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide BTUs for appliances on gas riser diagram. (Second Request) Gas riser not uploaded. Elevation cert was uploaded and named gas riser diagram | |||
| BLD | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | HOLD | 06/15/2023 | 06/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide BTUs for appliances on gas riser diagram | |||
| LOCATE | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| PLFM | HOLD | 06/15/2023 | 06/16/2023 |
| Note: Held By: JORDAN MYERS, C.F.M - (386)986-4789 - JMYERS@PALMCOASTGOV.COM According to the Site Plan submitted, the structure will fall inside the Special Flood Hazard Area. Elevation Certificates will be required at construction drawings, foundation, and final. | |||
| SWALE | COMPLETE | 06/15/2023 | 07/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 05/15/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/15/2024 |
| CONNECTION FEES | ¤1,166.26 | 06/27/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 06/27/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 06/27/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 06/27/2023 |
| IMPACT FEE FIRE | ¤420.52 | 06/27/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 06/27/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 06/27/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 06/27/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 06/27/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 06/27/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 06/27/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 06/27/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 06/27/2023 |
| SURCHARGE FS 533.721 | ¤6.15 | 06/27/2023 |
| SURCHARGE - FS 468.631 | ¤9.23 | 06/27/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 06/27/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 06/27/2023 |
| SW ENG PRE APRON | ¤30.00 | 06/27/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 06/27/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 06/27/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 06/27/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 06/27/2023 |
| SEWER CREDIT | (¤1,147.00) | 06/27/2023 |
| SEWER INSPECTION | ¤25.00 | 06/27/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 06/27/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 06/27/2023 |
| SITE PLAN 30 | ¤30.00 | 06/27/2023 |
| WATER- TURN ON | ¤25.00 | 06/27/2023 |
| ADJUSTMENT 50% | (¤615.10) | 06/27/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 06/27/2023 |
| INSPECTION - RESIDENTIAL | ¤935.00 | 06/27/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤265.20 | 06/27/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,478.11 |