Permit #2023060809
Permit Details
Status: COED
| Parcel Id: 28-10-30-5415-00000-1070 |
| CONDITIONED SPACE: 2042 sqft |
| GARAGE: 458 sqft |
| OPENED PORCH (WITH ROOF) : 35 sqft |
| SCREEN PORCH (SOLID ROOF) : 238 sqft |
| Total Square Footage: 2773 sqft |
| Subdivision: 2310 - SAWMILL BRANCH 2A |
| Job Phone: 904-219-3385 |
| Location Address: 14 SAWMILL CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/18/2023 |
| NOC: RECORDED |
| Applicant name: RAYMOND CLIVE CROSBY |
| Owner: DR HORTON, INC |
|
Address 4220 RACE TRACK RD ST JOHNS, FL 32259 |
| Lot: 107 |
| Contracted Stated Job Value: ¤204,200.00 |
| Job Description: SINGLE FAMILY |
| Type: CN |
Contractor
DR HORTON, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4220 RACE TRACK RD SAINT JOHNS, FL 32259 |
CBC058997 (Exp: 08/31/2026) | 904-268-2845 | 904-899-5992 |
Sub Contractors
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/16/2024 | FINAL APPROVED | KSANDOE |
| Note: 1/4/2024 - PREVIOUS INSPECTION NOTES 1. Exhaust duct cover at soffit are loose and pulling away from soffit 2. Cable block ground wire needs to be sealed where it meets siding 3. AHU closet wall where disconnect is needs to be sealed properly 4. Duct jumper in master bedroom covered 5. Smoke outside master bedroom needs to be moved to the higher ceiling (ceiling height change) per manufactor specs | |||
| BLD - BUILDING FINAL | 01/04/2024 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Exhaust duct cover at soffit are loose and pulling away from soffit 2. Cable block ground wire needs to be sealed where it meets siding 3. AHU closet wall where disconnect is needs to be sealed properly 4. Duct jumper in master bedroom covered 5. Smoke outside master bedroom needs to be moved to the higher ceiling (ceiling height change) per manufactor specs | |||
| U -UTILITY RESIDENTIAL FINAL | 12/27/2023 | FINAL APPROVED | DHANEY |
| U-CROSS CONNECTION | 12/27/2023 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 12/21/2023 | APPROVED | RGROSS |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/21/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Site plans show lots drain forward starting with lot 12. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/21/2023 | APPROVED - AS NOTED | RGROSS |
| Note: Inspector Notes from Inspection 9463 Site plans show lots drain forward starting with lot 12. | |||
| ROW - STORMWATER FINAL | 12/21/2023 | APPROVED | RGROSS |
| Note: Inspector Notes from Inspection 9465 Inspector Notes from Inspection 9463 Site plans show lots drain forward starting with lot 12. | |||
| ELECTRIC - EARLY POWER | 12/01/2023 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2200 9/22/23- Please label GFCI exterior outlet in panel before final. Authorize release of email to FPL @ 10:41a. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/29/2023 | APPROVED | GBERTOLA |
| Note: READY TO POUR MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL | |||
| INSULATION | 10/25/2023 | APPROVED | RSIMS |
| Note: 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23: Not Ready! Cancelled by Applicant verbally. 10/19/2023 - PREVIOUS INSPECTION NOTES 10/19/23: Inspection Stopped! Not Ready! Firestop missing in too many places to identify all. Examples: Missing Firestop * at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Some areas marked on studs with FS where required. * at cross bracing where ceiling elevation changes. * behind kitchen wall bracing. * Multiple locations in garage. 10/18/2023 - PREVIOUS INSPECTION NOTES | |||
| U - SEWER TIE IN | 10/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| GRAVITY SEWER TEST | 10/24/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 10/23/2023 | CANCELLED BY APPLICANT | RSIMS |
| Note: 10/23/23: Not Ready! Cancelled by Applicant verbally. 10/19/2023 - PREVIOUS INSPECTION NOTES 10/19/23: Inspection Stopped! Not Ready! Firestop missing in too many places to identify all. Examples: Missing Firestop * at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Some areas marked on studs with FS where required. * at cross bracing where ceiling elevation changes. * behind kitchen wall bracing. * Multiple locations in garage. 10/18/2023 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 10/19/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/19/23: Inspection Stopped! Not Ready! Firestop missing in too many places to identify all. Examples: Missing Firestop * at Horizontal wire runs over 10ft. Per FBC 302.11: Required Locations (1.2. Horizontally at intervals not exceeding 10 feet (3048 mm)). Some areas marked on studs with FS where required. * at cross bracing where ceiling elevation changes. * behind kitchen wall bracing. * Multiple locations in garage. 10/18/2023 - PREVIOUS INSPECTION NOTES | |||
| INSULATION | 10/18/2023 | CANCELLED BY APPLICANT | FWILLIS |
| LATH/BRICK/ WATER BARRIER | 10/13/2023 | APPROVED | JSTEWART |
| Note: 10/11/2023 - PREVIOUS INSPECTION NOTES 10/11/23- Not ready Windows and SGD No water barrier (Flashing). R703.4 Flashing Inspector Notes from Inspection 2420 10/11/23- Please secure SD Box in hallway. Please fasten Romex at outlet entry in left front bedroom (garage side). will check at insulation. | |||
| ALL ROUGH | 10/11/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 10/11/23- Please secure SD Box in hallway. Please fasten Romex at outlet entry in left front bedroom (garage side). will check at insulation. | |||
| LATH/BRICK/ WATER BARRIER | 10/11/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 10/11/23- Added Window nailing inspection rear SGD. Please do not trim till aproved (water barrier/Flashing) | |||
| LATH/BRICK/ WATER BARRIER | 10/11/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 10/11/23- Not ready Windows and SGD No water barrier (Flashing). R703.4 Flashing Inspector Notes from Inspection 2420 10/11/23- Please secure SD Box in hallway. Please fasten Romex at outlet entry in left front bedroom (garage side). will check at insulation. | |||
| ELECTRIC-TUG | 09/22/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 9/22/23- Please label GFCI exterior outlet in panel before final. Authorize release of email to FPL @ 10:41a. | |||
| ROOF VALLEY & METAL | 09/18/2023 | APPROVED | JSTEWART |
| WALL SHEATHING | 09/07/2023 | APPROVED | FWILLIS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/07/2023 | APPROVED | FWILLIS |
| SHEARWALL | 09/06/2023 | APPROVED | JSTEWART |
| FOUND SURVEY APPROVED (OFFICE) | 08/15/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/02/2023 | APPROVED | FWILLIS |
| Note: 7/31/2023 - PREVIOUS INSPECTION NOTES 7/31/23: Inspection stopped. Not ready. Still being cleaned out. | |||
| MONOLITHIC SLAB | 07/31/2023 | Disapproved - NO FEE | RSIMS |
| Note: 7/31/23: Inspection stopped. Not ready. Still being cleaned out. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 07/24/2023 | APPROVED | JSTEWART |
| WATER METER INSTALLATION REQUEST | 07/24/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ZON | COMPLETE | 08/15/2023 | 08/15/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/15/2023 | 08/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/14/2023 | 08/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/14/2023 | 08/14/2023 |
| Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Patio slab at right rear of home appears to be exceeding the minimum required setback of 5'. Show setback from patio, not home in front of patio - demonstrating it meets the minimum required 5'. | |||
| MECH | COMPLETE | 07/14/2023 | 07/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/10/2023 | 07/11/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R11 insulation in walls. Energy Calcs say R13. Revise to match.(Second Request) | |||
| ELEC | COMPLETE | 07/10/2023 | 07/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/16/2023 | 07/06/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/15/2023 | 06/20/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electric load calcs do not match the living space of the home. 2. The electrical riser diagram needs to reference the correct NEC code year | |||
| ENGIN1 | COMPLETE | 06/15/2023 | 06/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/15/2023 | 06/20/2023 |
| LOCATE | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/15/2023 | 06/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R11 insulation in walls. Energy Calcs say R13. Revise to match. 2. Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 06/15/2023 | 06/22/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 01/16/2024 |
| CONNECTION FEES | ¤25.00 | 07/18/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/18/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/18/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/18/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/18/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/18/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/18/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/18/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/18/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/18/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/18/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/18/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/18/2023 |
| SURCHARGE FS 533.721 | ¤4.67 | 07/18/2023 |
| SURCHARGE - FS 468.631 | ¤7.00 | 07/18/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/18/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/18/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/18/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/18/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/18/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/18/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/18/2023 |
| SEWER INSPECTION | ¤25.00 | 07/18/2023 |
| SEWER CAPITAL FACILITY | ¤2,803.23 | 07/18/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,605.24 | 07/18/2023 |
| SITE PLAN 30 | ¤30.00 | 07/18/2023 |
| WATER-METER | ¤505.39 | 07/18/2023 |
| WATER-METER | ¤419.86 | 07/18/2023 |
| ADJUSTMENT 50% | (¤466.84) | 07/18/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/18/2023 |
| INSPECTION - RESIDENTIAL | ¤704.00 | 07/18/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤199.68 | 07/18/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,805.90 |