I want to search for...

Permit #2023060813

Permit Details

Status: COED

Parcel Id: 28-10-30-5415-00000-1060
CONDITIONED SPACE: 2147 sqft
GARAGE: 557 sqft
OPENED PORCH (WITH ROOF) : 54 sqft
SCREEN PORCH (SOLID ROOF) : 131 sqft
Total Square Footage: 2889 sqft
Subdivision: 2310 - SAWMILL BRANCH 2A
Job Phone: 904-219-3385
Location Address: 12 SAWMILL CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/13/2023
NOC: RECORDED
Applicant name: RAYMOND CLIVE CROSBY
Owner: DR HORTON, INC

Address

4220 RACE TRACK RD

JACKSONVILLE, FL 32259

Lot: 106
Contracted Stated Job Value: ¤214,700.00
Job Description: SINGLE FAMILY
Type: CN

Contractor

DR HORTON, INC.
Status Location Address State License Number Phone Fax
ACTIVE

4220 RACE TRACK RD

SAINT JOHNS, FL 32259

CBC058997 (Exp: 08/31/2026) 904-268-2845 904-899-5992

Sub Contractors

PAUL ERIC FORSTER
Status Location Address State License Number Phone
ACTIVE

6114 GOODMAN RD

JACKSONVILLE, FL 32244

CFC1429261 (Exp: 08/31/2026) 904-647-1820
JAMES M GREENSLADE
Status Location Address State License Number Phone Fax
ACTIVE

311 S BAY ST

BUNNELL, FL 32110

EC13006083 (Exp: 08/31/2026) 386-263-2960 386-263-2980
DANA SUE COOLEY
Status Location Address State License Number Phone
INACTIVE

PO BOX 1718

FLAGLER BEACH, FL 32136

CCC1333449 (Exp: 08/31/2026) 904-535-1680
EDWARD DOUGLAS TENNANT
Status Location Address State License Number Phone Fax
INACTIVE

3370 AGRICULTURAL CENTER DRIVE

ST. AUGUSTINE , FL 32092

CAC1813372 (Exp: 08/31/2026) (904)829-8898 (904)829-6587

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/11/2023 FINAL APPROVED JSTEWART
U -UTILITY RESIDENTIAL FINAL 12/11/2023 FINAL APPROVED DHANEY
Note: 11/15/2023 - PREVIOUS INSPECTION NOTES Sewer clean out cap/lid Broke - Needs replaced .
U -UTILITY RESIDENTIAL FINAL 11/16/2023 Disapproved - NO FEE DHANEY
Note: Sewer clean out cap/lid Broke - Needs replaced .
U-CROSS CONNECTION 11/16/2023 APPROVED DHANEY
ROW - FINAL APRON (AFTER POUR) 11/15/2023 APPROVED EMADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 11/15/2023 APPROVED EMADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 11/15/2023 APPROVED EMADISON
ROW - STORMWATER FINAL 11/15/2023 APPROVED EMADISON
ELECTRIC - EARLY POWER 11/03/2023 APPROVED JSTEWART
GRAVITY SEWER TEST 10/24/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 10/24/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 10/20/2023 APPROVED RGROSS
INSULATION 09/25/2023 APPROVED RSIMS
Note: 9/22/2023 - PREVIOUS INSPECTION NOTES 9/22/23- .Repair and secure eave baffles......1 inch MINIMUM CLEARANCE FOR VENT AND INSULATION…. R806.3 1 Previous not #1 not rectified. Inspector Notes from Inspection 2420 9/14/23: Must be complete prior to next inspection. Check at next inspection. 1). No water pressure 2). No 5ft head pressure. 3). Nail plates needed at garage back wall & entry left wall just after AHU closet. Marked with NP on studs. 4). Master bathroom: exhaust fan duct needs to be moved off of roof sheathing. (directly up against right now) 9/13/2023 - PREVIOUS INSPECTION NOTES
INSULATION 09/22/2023 Disapproved - NO FEE JSTEWART
Note: 9/22/23- .Repair and secure eave baffles......1 inch MINIMUM CLEARANCE FOR VENT AND INSULATION…. R806.3 1 Previous not #1 not rectified. Inspector Notes from Inspection 2420 9/14/23: Must be complete prior to next inspection. Check at next inspection. 1). No water pressure 2). No 5ft head pressure. 3). Nail plates needed at garage back wall & entry left wall just after AHU closet. Marked with NP on studs. 4). Master bathroom: exhaust fan duct needs to be moved off of roof sheathing. (directly up against right now) 9/13/2023 - PREVIOUS INSPECTION NOTES
ALL ROUGH 09/14/2023 APPROVED - AS NOTED RSIMS
Note: 9/14/23: Must be complete prior to next inspection. Check at next inspection. 1). No water pressure 2). No 5ft head pressure. 3). Nail plates needed at garage back wall & entry left wall just after AHU closet. Marked with NP on studs. 4). Master bathroom: exhaust fan duct needs to be moved off of roof sheathing. (directly up against right now) 9/13/2023 - PREVIOUS INSPECTION NOTES
LATH/BRICK/ WATER BARRIER 09/14/2023 APPROVED RSIMS
Note: 9/13/2023 - PREVIOUS INSPECTION NOTES
ALL ROUGH 09/13/2023 CANCELLED BY APPLICANT MKRASKI
LATH/BRICK/ WATER BARRIER 09/13/2023 CANCELLED BY APPLICANT MKRASKI
ELECTRIC-TUG 09/05/2023 APPROVED RSIMS
Note: 9/5/23: FPL emailed at @ 11:18.
ROOF VALLEY & METAL 08/23/2023 APPROVED TSTAUFFACHER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/11/2023 APPROVED FWILLIS
Note: 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: ** Severly bowed and unfastened load bearing stud in garage just after shearwall needs to be replaced and fastened properly. 8/8/2023 - PREVIOUS INSPECTION NOTES NO ANCHOR BOLTS , STRAPPING AND CLIPS INSTALLED THROUGHOUT AS PER PLAN.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/10/2023 Disapproved - NO FEE RSIMS
Note: 8/10/23: ** Severly bowed and unfastened load bearing stud in garage just after shearwall needs to be replaced and fastened properly. 8/8/2023 - PREVIOUS INSPECTION NOTES NO ANCHOR BOLTS , STRAPPING AND CLIPS INSTALLED THROUGHOUT AS PER PLAN.
WALL SHEATHING 08/08/2023 APPROVED FWILLIS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 08/08/2023 Disapproved -FEE REQUIRED FWILLIS
Note: NO ANCHOR BOLTS , STRAPPING AND CLIPS INSTALLED THROUGHOUT AS PER PLAN.
FOUND SURVEY APPROVED (OFFICE) 08/01/2023 APPROVED TBAKER
MONOLITHIC SLAB 07/21/2023 APPROVED JSTEWART
Note: 7/20/2023 - PREVIOUS INSPECTION NOTES 7/20/23- 3" clearence from earth not met at Both corners of garage opening and side of entry way. FBC R404.1.2.3.7.4
MONOLITHIC SLAB 07/20/2023 Disapproved - NO FEE JSTEWART
Note: 7/20/23- 3" clearence from earth not met at Both corners of garage opening and side of entry way. FBC R404.1.2.3.7.4
PLUMBING 1ST ROUGH UNDERGROUND 07/17/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 07/17/2023 APPROVED CSTONE

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 07/31/2023 08/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 07/31/2023 07/31/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
MECH COMPLETE 07/10/2023 07/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
URB COMPLETE 06/16/2023 07/06/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BLD COMPLETE 06/15/2023 06/16/2023
Note: Released By: JPI
CUSVC COMPLETE 06/15/2023 06/16/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 06/15/2023 06/20/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/15/2023 06/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 06/15/2023 06/20/2023
LOCATE COMPLETE 06/15/2023 06/20/2023
Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM
MECH HOLD 06/15/2023 06/20/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Plans show R11 insulation in walls. Energy Calcs say R13. Revise to match. 2. Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 COMPLETE 06/15/2023 06/22/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 06/15/2023 06/16/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 12/11/2023
CONNECTION FEES ¤25.00 07/13/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/13/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/13/2023
FC IMPACT FEE EMS ¤62.00 07/13/2023
IMPACT FEE FIRE ¤420.52 07/13/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/13/2023
FC IMPACT FEE LIBRARY ¤268.00 07/13/2023
IMPACT FEE PARKS ¤1,769.15 07/13/2023
IMPACT FEE SCHOOL ¤5,450.00 07/13/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 07/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/13/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/13/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/13/2023
SURCHARGE FS 533.721 ¤4.90 07/13/2023
SURCHARGE - FS 468.631 ¤7.35 07/13/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/13/2023
SW ENG INSPECTION 80 ¤80.00 07/13/2023
SW ENG PRE APRON ¤30.00 07/13/2023
SW ENG - REVIEW 20 ¤20.00 07/13/2023
SW ENG RES REVIEW 200 ¤200.00 07/13/2023
TRANS IMPACT FEE ADMIN ¤99.33 07/13/2023
TRANS IMPACT FEE ADMIN (¤99.33) 07/13/2023
SEWER INSPECTION ¤25.00 07/13/2023
SEWER CAPITAL FACILITY ¤2,803.23 07/13/2023
WATER CAPITAL FACILITY FEE ¤2,605.24 07/13/2023
SITE PLAN 30 ¤30.00 07/13/2023
WATER-METER ¤505.39 07/13/2023
WATER-METER ¤419.86 07/13/2023
ADJUSTMENT 50% (¤489.79) 07/13/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/13/2023
INSPECTION - RESIDENTIAL ¤739.75 07/13/2023
PLAN REVIEW - RESIDENTIAL ¤209.82 07/13/2023
Fees Total Due: ¤0.00 Total Paid: ¤18,829.42