I want to search for...
Permit #2023060820
Permit Details
Status: COED
| Parcel Id: 28-10-30-5415-00000-1840 |
| CONDITIONED SPACE: 2353 sqft |
| GARAGE: 560 sqft |
| OPENED PORCH (WITH ROOF) : 30 sqft |
| SCREEN PORCH (SOLID ROOF) : 207 sqft |
| Total Square Footage: 3150 sqft |
| Subdivision: 2310 - SAWMILL BRANCH 2A |
| Job Phone: 904-219-3385 |
| Location Address: 31 LUMBER JACK TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/12/2023 |
| NOC: RECORDED |
| Applicant name: RAYMOND CLIVE CROSBY |
| Owner: DR HORTON, INC |
|
Address 4220 RACE TRACK RD ST JOHNS, FL 32259 |
| Lot: 184 |
| Contracted Stated Job Value: ¤235,300.00 |
| Job Description: SINGLE FAMILY |
| Type: CN |
Contractor
DR HORTON, INC.
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4220 RACE TRACK RD SAINT JOHNS, FL 32259 |
CBC058997 (Exp: 08/31/2026) | 904-268-2845 | 904-899-5992 |
Sub Contractors
EDWARD DOUGLAS TENNANT
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
3370 AGRICULTURAL CENTER DRIVE ST. AUGUSTINE , FL 32092 |
CAC1813372 (Exp: 08/31/2026) | (904)829-8898 | (904)829-6587 |
PAUL ERIC FORSTER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6114 GOODMAN RD JACKSONVILLE, FL 32244 |
CFC1429261 (Exp: 08/31/2026) | 904-647-1820 |
DANA SUE COOLEY
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 1718 FLAGLER BEACH, FL 32136 |
CCC1333449 (Exp: 08/31/2026) | 904-535-1680 |
JAMES M GREENSLADE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
311 S BAY ST BUNNELL, FL 32110 |
EC13006083 (Exp: 08/31/2026) | 386-263-2960 | 386-263-2980 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 12/07/2023 | APPROVED | RSIMS |
| Note: 12/1/2023 - PREVIOUS INSPECTION NOTES 12/1/23- 1. Master Toilet room Exhaust fan not working. M1507.2 Recirculation of air. 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER AND OR CONDENSOR UNIT WITH FACTORY APPLIED LABEL | |||
| BLD - BUILDING FINAL | 12/01/2023 | Disapproved - NO FEE | JSTEWART |
| Note: 12/1/23- 1. Master Toilet room Exhaust fan not working. M1507.2 Recirculation of air. 2. UNIT LABELING..FBC.R. M1303.1 MUST IDENTIFY MAXIMUM OVER CURRENT BREAKER SIZE ON AIR HANDLER AND OR CONDENSOR UNIT WITH FACTORY APPLIED LABEL | |||
| U-CROSS CONNECTION | 11/20/2023 | APPROVED | DHANEY |
| U -UTILITY RESIDENTIAL FINAL | 11/20/2023 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 11/17/2023 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 11/17/2023 | APPROVED | EMADISON |
| ROW - STORMWATER FINAL | 11/17/2023 | APPROVED | EMADISON |
| ROW - FINAL APRON (AFTER POUR) | 11/17/2023 | APPROVED | EMADISON |
| ELECTRIC - EARLY POWER | 11/07/2023 | APPROVED | JSTEWART |
| Note: Inspector Notes from Inspection 2200 9/11/23-Authorize release of email to FPL @ 10:48a. | |||
| ROW- PRE-APRON (PRE-POUR) | 10/30/2023 | APPROVED | PFLANAGAN |
| Note: ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| INSULATION | 10/02/2023 | APPROVED | FWILLIS |
| Note: Inspector Notes from Inspection 2420 9/20/23- Please make sure smoke detector in hallway is 4" away from wall. smoke detector in front bedroom at peak of vaulted ceiling needs to be 4" min from the center of the vault, Before Final. 9/12/2023 - PREVIOUS INSPECTION NOTES 1. Windows installed do not match product approval number revision is required 2. Dryer vent seam is not sealed 3. Chase for island power requires nail plate (wall side) 4. Structual studs have been cut at washer hook up. enginnered letter for repair is required to be submitted and apporved by Building dept. Stopped inspection not ready | |||
| GRAVITY SEWER TEST | 09/22/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 09/22/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ALL ROUGH | 09/20/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 9/20/23- Please make sure smoke detector in hallway is 4" away from wall. smoke detector in front bedroom at peak of vaulted ceiling needs to be 4" min from the center of the vault, Before Final. 9/12/2023 - PREVIOUS INSPECTION NOTES 1. Windows installed do not match product approval number revision is required 2. Dryer vent seam is not sealed 3. Chase for island power requires nail plate (wall side) 4. Structual studs have been cut at washer hook up. enginnered letter for repair is required to be submitted and apporved by Building dept. Stopped inspection not ready | |||
| LATH/BRICK/ WATER BARRIER | 09/12/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Back porch beam is missing water barrier | |||
| LATH/BRICK/ WATER BARRIER | 09/12/2023 | APPROVED | MKRASKI |
| ALL ROUGH | 09/12/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Windows installed do not match product approval number revision is required 2. Dryer vent seam is not sealed 3. Chase for island power requires nail plate (wall side) 4. Structual studs have been cut at washer hook up. enginnered letter for repair is required to be submitted and apporved by Building dept. Stopped inspection not ready | |||
| ELECTRIC-TUG | 09/11/2023 | APPROVED - AS NOTED | JSTEWART |
| Note: 9/11/23-Authorize release of email to FPL @ 10:48a. | |||
| ROOF VALLEY & METAL | 08/28/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/25/2023 | APPROVED | TSTAUFFACHER |
| Note: 8/24/2023 - PREVIOUS INSPECTION NOTES 98/24/2023- Prior notes not done 8/22/2023 - PREVIOUS INSPECTION NOTES 8/22/23: Roof sheathing bump checked/ Ties checked - approved Truss Engineering - Disapproved 1). Truss T14 (all 6) are missing one piece of engineering in the center & the installed engineering pieces are on the wrong webs per MiTek. 2). Trusses T63 & T64 are missing engineering per MiTek. Marked on MiTek. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/24/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: 98/24/2023- Prior notes not done 8/22/2023 - PREVIOUS INSPECTION NOTES 8/22/23: Roof sheathing bump checked/ Ties checked - approved Truss Engineering - Disapproved 1). Truss T14 (all 6) are missing one piece of engineering in the center & the installed engineering pieces are on the wrong webs per MiTek. 2). Trusses T63 & T64 are missing engineering per MiTek. Marked on MiTek. | |||
| WALL SHEATHING | 08/22/2023 | APPROVED | RSIMS |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 08/22/2023 | PARTIALLY APPROVED | RSIMS |
| Note: 8/22/23: Roof sheathing bump checked/ Ties checked - approved Truss Engineering - Disapproved 1). Truss T14 (all 6) are missing one piece of engineering in the center & the installed engineering pieces are on the wrong webs per MiTek. 2). Trusses T63 & T64 are missing engineering per MiTek. Marked on MiTek. | |||
| FOUND SURVEY APPROVED (OFFICE) | 08/03/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 07/27/2023 | APPROVED | FWILLIS |
| PLUMBING 1ST ROUGH UNDERGROUND | 07/24/2023 | APPROVED | JSTEWART |
| WATER METER INSTALLATION REQUEST | 07/13/2023 | APPROVED | CSTONE |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 09/14/2023 | 09/15/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/14/2023 | 07/14/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/10/2023 | 07/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| URB | COMPLETE | 06/16/2023 | 07/06/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/15/2023 | 06/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/15/2023 | 06/20/2023 |
| LOCATE | COMPLETE | 06/15/2023 | 06/20/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | HOLD | 06/15/2023 | 06/20/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Heatload does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 06/15/2023 | 06/21/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/15/2023 | 06/20/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM going forward please check one of the boxes that states no more than 2 accent colors. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 12/07/2023 |
| CONNECTION FEES | ¤25.00 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/12/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/12/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/12/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/12/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/12/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/12/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/12/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/12/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 07/12/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/12/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/12/2023 |
| SURCHARGE FS 533.721 | ¤5.34 | 07/12/2023 |
| SURCHARGE - FS 468.631 | ¤8.01 | 07/12/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/12/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/12/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/12/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/12/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 07/12/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 07/12/2023 |
| SEWER INSPECTION | ¤25.00 | 07/12/2023 |
| SEWER CAPITAL FACILITY | ¤2,803.23 | 07/12/2023 |
| WATER CAPITAL FACILITY FEE | ¤2,605.24 | 07/12/2023 |
| SITE PLAN 30 | ¤30.00 | 07/12/2023 |
| WATER-METER | ¤505.39 | 07/12/2023 |
| WATER-METER | ¤419.86 | 07/12/2023 |
| ADJUSTMENT 50% | (¤533.91) | 07/12/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/12/2023 |
| INSPECTION - RESIDENTIAL | ¤808.50 | 07/12/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤229.32 | 07/12/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,874.65 |