I want to search for...
Permit #2023060982
Permit Details
Status: COED
| Parcel Id: 07-11-31-7015-00010-0270 |
| CONDITIONED SPACE: 2804 sqft |
| OPENED PORCH (WITH ROOF) : 52 sqft |
| SCREEN PORCH (SOLID ROOF) : 396 sqft |
| GARAGE: 741 sqft |
| Total Square Footage: 3993 sqft |
| Block: 00010 |
| Subdivision: 2194 - SECTION 15-COUNTRY CLUB COVE |
| Job Phone: 386-445-2012 |
| Location Address: 59 COCHISE CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/02/2023 |
| NOC: RECORDED |
| Applicant name: JOHN NICHOLAS CORDASCI |
| Owner: DAVID O GARGANO AND CHI D GARGANO |
|
Address 275 EVERGREEN AVENUE HAMDEN, CT 06518 |
| Lot: 0270 |
| Contracted Stated Job Value: ¤614,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
SKYWAY BUILDERS INC
| Status | Location Address | State License Number | Phone |
| INACTIVE |
PO BOX 354786 PALM COAST, FL 32135 |
CBC1263769 (Exp: 08/31/2024) | 386-445-2012 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
MARK JOHN LUTCZA
| Status | Location Address | State License Number | Phone |
| ACTIVE |
26 ROYAL LEAF LANE PALM COAST, FL 32164 |
EC13005145 (Exp: 08/31/2026) | 386-586-0770 |
RICHARD GARY WILSON JR
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
1504 OLD MOODY BLVD BUNNELL, FL 32110 |
UNIT 6 BUNNELL, FL 32110 |
CAC1817645 (Exp: 08/31/2026) | 386-586-6290 |
DANIEL DAVID RUTKOWSKI III
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
1687 STATE AVENUE HOLLY HILL, FL 32117 |
CCC1328639 (Exp: 08/31/2026) | 386-290-7490 | 386-256-0001 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 06/26/2024 | FINAL APPROVED | JSTEWART |
| U -UTILITY RESIDENTIAL FINAL | 06/18/2024 | FINAL APPROVED | BWRIGHT |
| Note: 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY LFITZGERALD 6/17/2024 10:36:06 AM *** unable to locate sewer C/O at the tap | |||
| ROW - STORMWATER FINAL | 06/17/2024 | APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 06/17/2024 | Disapproved -FEE REQUIRED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 10:36:06 AM *** unable to locate sewer C/O at the tap | |||
| U-CROSS CONNECTION | 06/17/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 6/17/2024 10:35:26 AM *** irrigatin meter-no cross connection | |||
| ROW - FINAL APRON (AFTER POUR) | 06/17/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/04/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/04/2024 | APPROVED | EMADISON |
| ROW- PRE-APRON (PRE-POUR) | 05/03/2024 | APPROVED - AS NOTED | EMADISON |
| Note: *** NOTES ADDED BY EMADISON 5/3/2024 10:40:57 AM *** ** 05/03/24 READY TO SET PAVERS ** At the time of the inspection all minimum city requirements were met. It is the builder’s responsibility to ensure that nothing changes after this Inspection is approved. 5/2/2024 - PREVIOUS INSPECTION NOTES ** 05/02/24 AS NOTED IN PREVIOUS INSPECTION DATED 04/05/24 ** BUILDER NEEDS TO SCHEDULE THE NEXT PRE-POUR INSPECTION AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL ** ***DO NOT SET ANY PAVERS*** UNTIL AFTER THE INSPECTION FOR COMPACTION OF PAVER BASE MATERIAL HAS BEEN APPROVED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ______________________________________________________________________________________________________________________ New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9271 ** 04/26/24 PAVER RESTRAINT INSPECTION WAS PREVIOUSLY PASSED 0N 04/05/24 ** THE NEXT DRIVEWAY PRE-POUR INSPECTION REQUIRED IS AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL. ******** DO NOT SET ANY PAVERS UNTIL THE NEXR PRE-POUR INSPECTION HAS BEEN APPROVED******** | |||
| ROW- PRE-APRON (PRE-POUR) | 05/02/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 05/02/24 AS NOTED IN PREVIOUS INSPECTION DATED 04/05/24 ** BUILDER NEEDS TO SCHEDULE THE NEXT PRE-POUR INSPECTION AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL ** ***DO NOT SET ANY PAVERS*** UNTIL AFTER THE INSPECTION FOR COMPACTION OF PAVER BASE MATERIAL HAS BEEN APPROVED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ______________________________________________________________________________________________________________________ New inspection due to canceled inspection New inspection due to canceled inspection Inspector Notes from Inspection 9271 ** 04/26/24 PAVER RESTRAINT INSPECTION WAS PREVIOUSLY PASSED 0N 04/05/24 ** THE NEXT DRIVEWAY PRE-POUR INSPECTION REQUIRED IS AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL. ******** DO NOT SET ANY PAVERS UNTIL THE NEXR PRE-POUR INSPECTION HAS BEEN APPROVED******** | |||
| ROW- PRE-APRON (PRE-POUR) | 05/01/2024 | CANCELLED BY APPLICANT | WEB |
| Note: New inspection due to canceled inspection Inspector Notes from Inspection 9271 ** 04/26/24 PAVER RESTRAINT INSPECTION WAS PREVIOUSLY PASSED 0N 04/05/24 ** THE NEXT DRIVEWAY PRE-POUR INSPECTION REQUIRED IS AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL. ******** DO NOT SET ANY PAVERS UNTIL THE NEXR PRE-POUR INSPECTION HAS BEEN APPROVED******** | |||
| ROW- PRE-APRON (PRE-POUR) | 04/30/2024 | CANCELLED BY APPLICANT | WEB |
| Note: Inspector Notes from Inspection 9271 ** 04/26/24 PAVER RESTRAINT INSPECTION WAS PREVIOUSLY PASSED 0N 04/05/24 ** THE NEXT DRIVEWAY PRE-POUR INSPECTION REQUIRED IS AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL. ******** DO NOT SET ANY PAVERS UNTIL THE NEXR PRE-POUR INSPECTION HAS BEEN APPROVED******** | |||
| ROW- PAVER RESTRAINTS | 04/26/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/26/24 PAVER RESTRAINT INSPECTION WAS PREVIOUSLY PASSED 0N 04/05/24 ** THE NEXT DRIVEWAY PRE-POUR INSPECTION REQUIRED IS AFTER YOU HAVE SPREAD AND COMPACTED THE PAVER BASE MATERIAL. ******** DO NOT SET ANY PAVERS UNTIL THE NEXR PRE-POUR INSPECTION HAS BEEN APPROVED******** | |||
| ROW- PRE-APRON (PRE-POUR) | 04/05/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: READY TO POUR APRON AND PAVER RESTRAINTS ONLY. ALL BASE NEEDS TO SPREAD AND COMPACTED BEFORE NEXT PREPOUR WILL BE SCHEDULED AND PASSED **** DO NOT LAY ANY PAVERS AT THIS TIME**** AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS | |||
| ROW- PAVER RESTRAINTS | 04/05/2024 | APPROVED | PFLANAGAN |
| Note: PAVER RESTRAINTS GOOD AT THIS TIME | |||
| ELECTRIC - EARLY POWER | 02/21/2024 | APPROVED | AGAETANO |
| INSULATION | 12/27/2023 | APPROVED | AGAETANO |
| INSULATION | 12/22/2023 | CANCELLED BY APPLICANT | WEB |
| LATH/BRICK/ WATER BARRIER | 12/18/2023 | APPROVED | AGAETANO |
| ALL ROUGH | 12/18/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 11/27/2023 - PREVIOUS INSPECTION NOTES 12-18-2023 1. Energy calcs do not match windows installed. Please revise and submit to the building department. 2. Nail plate needed at dryer vent. Check at insulation. | |||
| WINDOW NAILING | 11/27/2023 | APPROVED | AGAETANO |
| Note: 11-27-2023 SGD frame approved only. | |||
| ALL ROUGH | 11/27/2023 | CANCELLED BY APPLICANT | AGAETANO |
| GRAVITY SEWER TEST | 11/03/2023 | APPROVED | RSIMS |
| U - SEWER TIE IN | 11/03/2023 | APPROVED | RSIMS |
| WALL SHEATHING | 10/02/2023 | APPROVED | AGAETANO |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/02/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 10-02-2023 Floor plan, 2 x 12 header does not have HTT4 and studs installed. Please install per plan. LVL not sufficient fasteners. Check at next inspection. | |||
| ROOF VALLEY & METAL | 10/02/2023 | APPROVED | AGAETANO |
| ELECTRIC TEMP POLE | 09/20/2023 | APPROVED | AGAETANO |
| TIE BEAM / LINTEL | 09/06/2023 | APPROVED | AGAETANO |
| FOUND SURVEY APPROVED (OFFICE) | 08/29/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 08/22/2023 | APPROVED | FWILLIS |
| Note: 8/21/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 8/17/2023 - PREVIOUS INSPECTION NOTES Slab work not started 08-21-2023 1. F1 footings not installed per plan. Check all F1 footings. 2. Garage bearing wall plumbing lines not per code. 3. AC line not installed as per plan. Cannot run paralell to bearing wall footing. 4. Refrigerator water lines not installed as per code. Releiving arch and or pipes need to be sleeved. 5. Multiple areas need to be tamped. Inspection stopped. | |||
| MONOLITHIC SLAB | 08/21/2023 | Disapproved - NO FEE | AGAETANO |
| Note: New inspection due to canceled inspection 8/17/2023 - PREVIOUS INSPECTION NOTES Slab work not started 08-21-2023 1. F1 footings not installed per plan. Check all F1 footings. 2. Garage bearing wall plumbing lines not per code. 3. AC line not installed as per plan. Cannot run paralell to bearing wall footing. 4. Refrigerator water lines not installed as per code. Releiving arch and or pipes need to be sleeved. 5. Multiple areas need to be tamped. Inspection stopped. | |||
| ROW- PROJECT STATUS | 08/21/2023 | APPROVED | PFLANAGAN |
| Note: WENT OUT TO LOOK AT ROAD DAMAGE BUILDER REQUEST. SEE PHOTOS ON INSPECTION 9200 DATED 8/21/23 FOR AREA THAT NEEDS REPAIRED AREA WAS PAINTED. THIS INSPECTION WAS DURING SLAB POUR. THE BUILDER WILL BE RESPONSIBILE FOR THE AREA OUT LINED IN PAINT. IF THERE IS ANY MORE AREAS AT AFTER POUR AREAS WILL NEED REPAIRED. | |||
| MONOLITHIC SLAB | 08/18/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 8/17/2023 - PREVIOUS INSPECTION NOTES Slab work not started | |||
| MONOLITHIC SLAB | 08/17/2023 | Disapproved -FEE REQUIRED | TSTAUFFACHER |
| Note: Slab work not started | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 08/16/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/04/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 06/03/2024 | 06/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/03/2024 | 06/07/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 04/18/2024 | 04/22/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 04/18/2024 | 04/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/18/2024 | 04/18/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/18/2024 | 04/18/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/28/2023 | 08/29/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/28/2023 | 08/29/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/27/2023 | 07/27/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2023 | 07/21/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/19/2023 | 07/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/19/2023 | 07/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/19/2023 | 07/19/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please turn in original right of way agreement for recording | |||
| BLD | COMPLETE | 07/19/2023 | 07/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/19/2023 | 07/25/2023 |
| Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM Need to know if this structure is block or wood to determine if the FFE elevation will work. On the right side the proposed elevations go up and down, they are not consistent flowing frow rear to front. | |||
| BADMIN | INFORMATION | 06/29/2023 | 06/29/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Unable to process NOC must include State of Florida, County of Flagler. It may be notarized out of state however document must state on top. State of Florida, County of Flagler. | |||
| SW1 | HOLD | 06/28/2023 | 06/28/2023 |
| Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side. Positive fall is considered to be 0.10 feet in 20 feet. The minimum fall from the rear property line to the front is 0.50 feet. Refer to stormwater checklist to make the corrections needed to meet the city minimums stormwater requirements | |||
| BADMIN | COMPLETE | 06/22/2023 | 06/26/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ZON | HOLD | 06/20/2023 | 06/23/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a right of way agreement for paver driveway. It must be signed by all owners on the deed and notarized. Once electronic copy is approved we will ask for the original copy to send for recording | |||
| BLD | HOLD | 06/20/2023 | 06/23/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 06/20/2023 | 06/21/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 06/20/2023 | 06/22/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need to reference the 2017 NEC 2. Need correct outlet spacing in M.bed and bed 3. NEC 2017 210.52 3. All outlets in laundry room need to be GFCI protected. NEC 2017 210.8 | |||
| ENGIN1 | COMPLETE | 06/20/2023 | 06/20/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 06/20/2023 | 06/22/2023 |
| LOCATE | COMPLETE | 06/20/2023 | 06/23/2023 |
| Note: Released By: CANDACE STONE - (386)986-2539 - CSTONE@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 06/20/2023 | 06/22/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 06/20/2023 | 07/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 06/27/2024 |
| REINSPECTION FEE | ¤40.00 | 06/27/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 06/27/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 06/27/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 06/27/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 06/27/2024 |
| CONNECTION FEES | ¤1,166.26 | 08/02/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/02/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/02/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/02/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/02/2023 |
| SEWER INSPECTION | ¤25.00 | 08/02/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/02/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/02/2023 |
| SITE PLAN 30 | ¤30.00 | 08/02/2023 |
| SURCHARGE FS 533.721 | ¤10.99 | 08/02/2023 |
| SURCHARGE - FS 468.631 | ¤16.48 | 08/02/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/02/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/02/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/02/2023 |
| WATER-METER | ¤505.39 | 08/02/2023 |
| WATER- TURN ON | ¤25.00 | 08/02/2023 |
| WATER- TURN ON | ¤25.00 | 08/02/2023 |
| ADJUSTMENT 50% | (¤1,098.71) | 08/02/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/02/2023 |
| INSPECTION - RESIDENTIAL | ¤1,688.50 | 08/02/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤478.92 | 08/02/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/02/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/02/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/02/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/02/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/02/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/02/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/02/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/02/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 08/02/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/02/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/02/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/02/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/02/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/02/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤22,797.70 |