I want to search for...
Permit #2023061516
Permit Details
Status: COED
| Parcel Id: 05-12-31-2755-00000-0060 |
| CONDITIONED SPACE: 1885 sqft |
| GARAGE: 444 sqft |
| OPENED PORCH (WITH ROOF) : 221 sqft |
| Total Square Footage: 2550 sqft |
| Block: 00000 |
| Subdivision: 2313 - THE GABLES SUBDIVISION |
| Job Phone: (386)756-0439 |
| Location Address: 211 HAWTHORN AVE |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/04/2023 |
| NOC: RECORDED |
| Applicant name: JAMES MICHAEL MATHER |
| Owner: PAYTAS HOMES INC |
|
Address PO BOX 290490 PORT ORANGE, FL 32127 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
PAYTAS HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 290490 PORT ORANGE, FL 32127 |
CBC1261873 (Exp: 08/31/2026) | (386)756-0439 |
Sub Contractors
GERALD EDWARD MASTERS JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
505 HERBERT STREET PORT ORANGE, FL 32129 |
EC13003217 (Exp: 08/31/2026) | (386)304-2600 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DANIEL P HUCKS
| Status | Location Address | State License Number | Phone | Fax |
| CANCEL |
400 N. U.S. 1 Ormond Beach, FL 32174 |
CAC029376 (Exp: 08/31/2024) | 386-672-8494 | 386-673-7856 |
IAN MICHEAL JOHNSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
4244 JACKSON STREET PORT ORANGE, FL 32127 |
CCC1325915 (Exp: 08/31/2026) | 386-760-0764 | 386-760-3080 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 01/12/2024 | Approval - Private Provider | PPROVIDER |
| U-CROSS CONNECTION | 01/10/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 01/10/2024 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. 12/29/23 UPON WALKING PROPERTY DETERMINED THERE IS A LOW SPOT OFF OFF THE RIGHT REEAR STRUCTURE CORNER THAT IS HOLDING WATER. THIS WILL NEED TO HAVE A BIT OF DIRT ADDED, COMPACTED AND RESET SOD TO ALLOW FOR POSITIVE FORWARD DRAINAGE BEFORE ROW FINAL PASSAGE. APPROVING THIS INSPECTION AS NOTED. | |||
| ROW - STORMWATER FINAL | 01/10/2024 | APPROVED - AS NOTED | GBERTOLA |
| Note: 1/10/24= I DID FAILL THE INSPECTION ON 209 FOR THAT ISSUE THERE IS AN ISSUE WITH EXCESS WATER ACCUMULATING BETWEEN THE TWO HOUSES LOCATED AT #209 AND 211 ON THE RIGHT SIDE OF THE PROPERTY. THE DRAINAGE SYSTEM BETWEEN THE HOUSES NEEDS TO BE REDESIGNED TO ENSURE THAT WATER FLOWS FROM THE BACK TO THE FRONT. ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 12/29/23 UPON WALKING PROPERTY DETERMINED THERE IS A LOW SPOT OFF OFF THE RIGHT REEAR STRUCTURE CORNER THAT IS HOLDING WATER. THIS WILL NEED TO HAVE A BIT OF DIRT ADDED, COMPACTED AND RESET SOD TO ALLOW FOR POSITIVE FORWARD DRAINAGE BEFORE ROW FINAL PASSAGE. APPROVING THIS INSPECTION AS NOTED. | |||
| U -UTILITY RESIDENTIAL FINAL | 01/10/2024 | FINAL APPROVED | JHARDING |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 12/29/2023 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 12/5/23 ** SPREAD AND COMPACTION INSPECTION COMPLETE YOU MAY NOW LAY PAVERS AT THE TIME OF INSPECTION Inspector Notes from Inspection 9271 11/30/23 YOU ARE READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 12/29/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 12/29/23 UPON WALKING PROPERTY DETERMINED THERE IS A LOW SPOT OFF OFF THE RIGHT REEAR STRUCTURE CORNER THAT IS HOLDING WATER. THIS WILL NEED TO HAVE A BIT OF DIRT ADDED, COMPACTED AND RESET SOD TO ALLOW FOR POSITIVE FORWARD DRAINAGE BEFORE ROW FINAL PASSAGE. APPROVING THIS INSPECTION AS NOTED. | |||
| ELECTRIC - EARLY POWER | 12/11/2023 | Approval - Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 12/05/2023 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12/5/23 ** SPREAD AND COMPACTION INSPECTION COMPLETE YOU MAY NOW LAY PAVERS AT THE TIME OF INSPECTION Inspector Notes from Inspection 9271 11/30/23 YOU ARE READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS. | |||
| ROW- PAVER RESTRAINTS | 11/30/2023 | APPROVED - AS NOTED | FSLADISH |
| Note: 11/30/23 YOU ARE READY TO POUR PAVER RESTRAINTS AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS. | |||
| ROW- PRE-APRON (PRE-POUR) | 11/30/2023 | PARTIALLY APPROVED | FSLADISH |
| Note: 11/30/23 YOU ARE APPROVED TO POUR DRIVEWAY APRON AND PAVER RESTRAINTS AS OF THIS INSPECTION. DO NOT LAY ANY PAVERS AT THIS TIME. NEXT INSPECTION WILL BE FOR PAVER BASE SPREAD AND COMPACTION. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. SPOKE TO BOB CM AND DETERMINED THAT THE SIDEWALKS AT 9' FROM EOP WERE CORRECT. | |||
| LATH/BRICK/ WATER BARRIER | 10/19/2023 | Approval - Private Provider | PPROVIDER |
| INSULATION | 10/19/2023 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 10/16/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 09/25/2023 | Approval - Private Provider | PPROVIDER |
| WALL SHEATHING | 09/21/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 09/21/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 09/20/2023 | Approval - Private Provider | PPROVIDER |
| Note: Inspector Notes from Inspection 9450 THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 09/20/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| ELECTRIC-TUG | 08/30/2023 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 08/22/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 08/21/2023 | APPROVED | CBOWERMASTER |
| FOUND SURVEY APPROVED (OFFICE) | 08/18/2023 | APPROVED | AMOBLEY |
| MONOLITHIC SLAB | 08/09/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/07/2023 | Approval - Private Provider | PPROVIDER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/18/2023 | 08/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/18/2023 | 08/18/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/26/2023 | 08/04/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/26/2023 | 07/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/26/2023 | 07/26/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 07/19/2023 | 07/25/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM WATER IS STILL GOING UP TO THE HOUSE WATER NEEDS TO FLOW AWAY FROM STURTURE THEN TO THE FRONT ROAD | |||
| ENGIN1 | COMPLETE | 07/19/2023 | 07/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/19/2023 | 07/19/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/12/2023 | 07/12/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Stamped landscape Builder only provided the first sheet of the elevation all other pages addatched on the first submission. ok by Alisha | |||
| SW1 | HOLD | 07/12/2023 | 07/18/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM ALL WATER IN THE BACK IS FLOWING BACK TO THE HOUSE WATER NEEDS TO FLOW AWAY THEN AROUND TO THE SIDES | |||
| ENGIN1 | COMPLETE | 07/12/2023 | 07/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/06/2023 | 07/07/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM repeat comment: Landscape plan: Please add 3 more shrubs to the front of the home as it a calls for 8 shrubs along the front and 4 to wrap each corner of the home. Elevation Plan: please add banding around the garage door. PLEASE BRING IN ORIGINALS FOR THE ROW | |||
| URB | COMPLETE | 07/05/2023 | 07/07/2023 |
| Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 06/29/2023 | 07/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 06/29/2023 | 07/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 06/29/2023 | 07/10/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 06/29/2023 | 07/11/2023 |
| Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM YOU NEED TO PROVIDE ELEVATION SHOTS ALONG THE LEFT SIDE PROPERTY LINE IN 20' INTERVALS. ITS TO HARD TO DETERMINE WHERE THE ELEVATION SHOTS ARE ACTUALLY TAKEN. PLEASE CLEAN UP SURVEYS SEVERAL NUMBERS ON TOP OF NUMBERS MAKE IT HARD TO READ. | |||
| ZON | HOLD | 06/29/2023 | 07/05/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: Please add 3 more shrubs to the front of the home as it a calls for 8 shrubs along the front and 4 to wrap each corner of the home. Elevation Plan: please add banding around the garage door. PLEASE BRING IN ORIGINALS FOR THE ROW. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER-METER | ¤505.39 | 08/04/2023 |
| WATER-METER | ¤419.86 | 08/04/2023 |
| ADJUSTMENT 50% | (¤15.00) | 08/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/04/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 08/04/2023 |
| CONNECTION FEES | ¤25.00 | 08/04/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/04/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/04/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/04/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/04/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/04/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/04/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/04/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/04/2023 |
| RECORDING FEE REIMBURSE DOC | ¤44.00 | 08/04/2023 |
| IMPACT FEE TRANSPORTATION | ¤3,311.00 | 08/04/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/04/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/04/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/04/2023 |
| SURCHARGE FS 533.721 | ¤2.40 | 08/04/2023 |
| SURCHARGE - FS 468.631 | ¤3.60 | 08/04/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/04/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/04/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/04/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/04/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/04/2023 |
| TRANS IMPACT FEE ADMIN | ¤99.33 | 08/04/2023 |
| TRANS IMPACT FEE ADMIN | (¤99.33) | 08/04/2023 |
| SEWER INSPECTION | ¤25.00 | 08/04/2023 |
| SITE PLAN 30 | ¤30.00 | 08/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤13,168.92 |