Permit #2023070070

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00290-0110
CONDITIONED SPACE: 1443 sqft
GARAGE: 406 sqft
OPENED PORCH (WITH ROOF) : 31 sqft
Total Square Footage: 1880 sqft
Block: 00290
Subdivision: -
Job Phone: 904-268-7730
Location Address: 293 UNDERWOOD TR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/21/2023
NOC: RECORDED
Applicant name: SCOTT CHRISTIAN HOWARD
Owner: FOCUS HOMES LLC OF FLORIDA

Address

5220 SHAD RD

JACKSONVILLE, FL 32257

Lot: 0110
Contracted Stated Job Value: ¤179,000.00
Job Description: SINGLE FAMILY HOME
Type: CN

Contractor

FOCUS HOMES LLC OF FLORIDA
Status Location Address Mailing Address State License Number Phone
ACTIVE

5220 SHAD RD

JACKSONVILLE, FL 32257

# 202

JACKSONVILLE, FL 32257

CRC1332443 (Exp: 08/31/2026) 904-268-7730

Sub Contractors

DANIEL GREGORY PUGLISI
Status Location Address State License Number Phone
INACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

EC13011195 (Exp: 08/31/2024) 407-302-7800
CLINTON J HULSLANDER SR
Status Location Address State License Number Phone Fax
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CFC1430632 (Exp: 08/31/2026) 407-321-0064 407-688-8534
RONALD KEVIN HAUPT
Status Location Address State License Number Phone
ACTIVE

4005 MARONDA WAY

SANFORD, FL 32771

CAC058534 (Exp: 08/31/2026) 407-321-0064
DEBORAH MAXINE JACKSON
Status Location Address State License Number Phone
ACTIVE

1165 SOUTH 5TH

MACCLENNY, FL 32063

CCC1330709 (Exp: 08/31/2026) 904-322-9409

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 12/14/2023 FINAL APPROVED BTAYLOR
Note: 12/13/2023 - PREVIOUS INSPECTION NOTES 12-13-23 1. No hot water. 2. No energy cals.
U-CROSS CONNECTION 12/14/2023 APPROVED - AS NOTED JHARDING
Note: No cross connections.
U -UTILITY RESIDENTIAL FINAL 12/14/2023 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 12/13/2023 APPROVED TPOLACEK
Note: 12/13/23 ** At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved 12/12/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
BLD - BUILDING FINAL 12/13/2023 Disapproved - NO FEE BTAYLOR
Note: 12-13-23 1. No hot water. 2. No energy cals.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/12/2023 APPROVED TPOLACEK
Note: 12/12/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 11.27/23 READY TO POUR AT THE TIME OF THI INSPECTION. PIPE IS WITHIN TOLERANCE. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES 11/21/2023 - PREVIOUS INSPECTION NOTES 11/21/23 THIS SITE IS STILL NOT READY FOR PRE POUR INSPECTION. FORMS ARE NOT UP OR READY. SEE PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 SITE IS NOT READY FOR PRE POUR INSPECTION. NO FORMS SET AND CULVERT PIPE FULL OF DIRT AND SILT. SEE PHOTO FOR REFERENCE.
ROW FIELD SURVEY /GRADING CERTIFICATION 12/12/2023 APPROVED TPOLACEK
Note: 12/12/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. 11/28/23= AFTER MEETING WITH THE MANAGER, I DECIDED TO SPLIT THE B DRAIN INTO TWO, WITH THE WATER FLOWING HALFWAY TO THE BACK AND HALFWAY TO THE FRONT.PER GBERTOLA. NEED TO SUBMIT A NEW SITE PLAN
ROW - STORMWATER FINAL 12/12/2023 APPROVED - AS NOTED TPOLACEK
Note: 12/12/23 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- PRE-APRON (PRE-POUR) 11/27/2023 APPROVED - AS NOTED FSLADISH
Note: 11.27/23 READY TO POUR AT THE TIME OF THI INSPECTION. PIPE IS WITHIN TOLERANCE. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. ________________________________________________________________________________________________________________________ 11/22/2023 - PREVIOUS INSPECTION NOTES 11/21/2023 - PREVIOUS INSPECTION NOTES 11/21/23 THIS SITE IS STILL NOT READY FOR PRE POUR INSPECTION. FORMS ARE NOT UP OR READY. SEE PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 SITE IS NOT READY FOR PRE POUR INSPECTION. NO FORMS SET AND CULVERT PIPE FULL OF DIRT AND SILT. SEE PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 11/22/2023 CANCELLED BY APPLICANT FSLADISH
Note: 11/21/2023 - PREVIOUS INSPECTION NOTES 11/21/23 THIS SITE IS STILL NOT READY FOR PRE POUR INSPECTION. FORMS ARE NOT UP OR READY. SEE PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 SITE IS NOT READY FOR PRE POUR INSPECTION. NO FORMS SET AND CULVERT PIPE FULL OF DIRT AND SILT. SEE PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 11/22/2023 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 11/21/2023 CANCELLED BY APPLICANT WEB
ROW- PRE-APRON (PRE-POUR) 11/21/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 11/21/23 THIS SITE IS STILL NOT READY FOR PRE POUR INSPECTION. FORMS ARE NOT UP OR READY. SEE PHOTO FOR REFERENCE. __________________________________________________________________________________________________________________________ 11/20/2023 - PREVIOUS INSPECTION NOTES 11/20/23 SITE IS NOT READY FOR PRE POUR INSPECTION. NO FORMS SET AND CULVERT PIPE FULL OF DIRT AND SILT. SEE PHOTO FOR REFERENCE.
ROW- PRE-APRON (PRE-POUR) 11/20/2023 Disapproved -FEE REQUIRED FSLADISH
Note: 11/20/23 SITE IS NOT READY FOR PRE POUR INSPECTION. NO FORMS SET AND CULVERT PIPE FULL OF DIRT AND SILT. SEE PHOTO FOR REFERENCE.
ELECTRIC - EARLY POWER 11/13/2023 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 9/18/2023 - PREVIOUS INSPECTION NOTES 9/15/2023 - PREVIOUS INSPECTION NOTES 9-22-23 1. Emailed FPL at 2:55. 11-13-23 1. Emailed FPL at 1:43.
INSULATION 10/04/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 09/29/2023 APPROVED BTAYLOR
ALL ROUGH 09/28/2023 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 09/28/2023 CANCELLED BY APPLICANT WEB
ELECTRIC-TUG 09/22/2023 APPROVED - AS NOTED BTAYLOR
Note: 9/18/2023 - PREVIOUS INSPECTION NOTES 9/15/2023 - PREVIOUS INSPECTION NOTES 9-22-23 1. Emailed FPL at 2:55.
ROOF VALLEY & METAL 09/20/2023 APPROVED BTAYLOR
ELECTRIC-TUG 09/18/2023 CANCELLED BY APPLICANT BTAYLOR
Note: 9/15/2023 - PREVIOUS INSPECTION NOTES
ELECTRIC-TUG 09/15/2023 CANCELLED BY APPLICANT BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/12/2023 APPROVED BTAYLOR
ROOF SHEATHING 09/12/2023 APPROVED BTAYLOR
Note: 9/11/2023 - PREVIOUS INSPECTION NOTES
WALL SHEATHING 09/12/2023 APPROVED BTAYLOR
Note: 9/11/2023 - PREVIOUS INSPECTION NOTES
WALL SHEATHING 09/11/2023 CANCELLED BY APPLICANT BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/11/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING 09/11/2023 CANCELLED BY APPLICANT BTAYLOR
ELECTRIC-TUG 09/07/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING / BRACES/TIES/DOWN CELL 09/06/2023 CANCELLED BY APPLICANT WEB
WALL SHEATHING 09/05/2023 CANCELLED BY APPLICANT WEB
ROOF SHEATHING 09/05/2023 CANCELLED BY APPLICANT WEB
WALL SHEATHING 08/28/2023 CANCELLED BY APPLICANT WEB
MONOLITHIC SLAB 08/21/2023 APPROVED BTAYLOR
Note: 8/18/2023 - PREVIOUS INSPECTION NOTES 8-18-23 1. Rebar needs atleast 3" of clerance from earth.
MONOLITHIC SLAB 08/18/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 8-18-23 1. Rebar needs atleast 3" of clerance from earth.
PLUMBING 1ST ROUGH UNDERGROUND 08/16/2023 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2075 8/14/2023 - PREVIOUS INSPECTION NOTES 8/11/2023 - PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTES C/M TO SCHEDUAL FIRT ROUGH FOR 8/16/23
GRAVITY SEWER TEST 08/15/2023 APPROVED - AS NOTED MGIBSON
Note: 8/14/2023 - PREVIOUS INSPECTION NOTES 8/11/2023 - PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTES C/M TO SCHEDUAL FIRT ROUGH FOR 8/16/23
GRAVITY SEWER TEST 08/14/2023 CANCELLED BY APPLICANT WEB
GRAVITY SEWER TEST 08/14/2023 Disapproved - NO FEE MGIBSON
Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTES
FOUND SURVEY APPROVED (OFFICE) 08/14/2023 APPROVED TDOAK
PLUMBING 1ST ROUGH UNDERGROUND 08/14/2023 CANCELLED BY APPLICANT WEB
PLUMBING 1ST ROUGH UNDERGROUND 08/14/2023 Disapproved -FEE REQUIRED MGIBSON
Note: 8/11/2023 - PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES NO TEST ON DWV STILL NOT HOLDING HEAD TEST 5' STILL NOT HOLDING HEAD TES CHECK FOR LEAKS
PLUMBING 1ST ROUGH UNDERGROUND 08/11/2023 Disapproved -FEE REQUIRED MGIBSON
Note: 8/10/2023 - PREVIOUS INSPECTION NOTES NO TEST ON DWV STILL NOT HOLDING HEAD TEST 5'
GRAVITY SEWER TEST 08/11/2023 Disapproved - NO FEE MGIBSON
Note: 8/10/2023 - PREVIOUS INSPECTION NOTES SEE FIRST ROUGH NOTE SEE FIRST ROUGH NOTE
GRAVITY SEWER TEST 08/10/2023 Disapproved - NO FEE MGIBSON
Note: SEE FIRST ROUGH NOTE
PLUMBING 1ST ROUGH UNDERGROUND 08/10/2023 Disapproved -FEE REQUIRED MGIBSON
Note: NO TEST ON DWV
U - SEWER TIE IN 08/10/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WASA VIRTUAL INSPECTION
WATER METER INSTALLATION REQUEST 07/27/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
SW1 COMPLETE 12/07/2023 12/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 11/30/2023 12/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 11/30/2023 12/07/2023
Note: Held By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM Fin Floor Elevation is to high please contact City Engineer to discuss this problem.
ZON COMPLETE 11/30/2023 11/30/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM changes made for stormwater only
ENGIN1 COMPLETE 08/14/2023 08/14/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 08/14/2023 08/14/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 07/13/2023 07/13/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 07/13/2023 07/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 07/13/2023 07/17/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM BUILDER NEED TO CONTACT STORMWATER BEFORE YOU DO THE GRADING TO MAKE SURE THE DRAINAGE IS CORRECT
ENGIN1 COMPLETE 07/13/2023 07/13/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 07/06/2023 07/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 07/05/2023 07/06/2023
Note: Released By: JPI
CUSVC COMPLETE 07/05/2023 07/10/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 07/05/2023 07/10/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit an electrical riser diagram
ENGIN1 COMPLETE 07/05/2023 07/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/05/2023 07/05/2023
LOCATE COMPLETE 07/05/2023 07/10/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/05/2023 07/10/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/05/2023 07/13/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)
ZON HOLD 07/05/2023 07/06/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan : missing square footage of lot
SWALE COMPLETE 07/05/2023 08/10/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 12/18/2023
REINSPECTION RESIDENTIAL ¤40.00 12/18/2023
REINSPECTION RESIDENTIAL ¤40.00 12/18/2023
REINSPECTION RESIDENTIAL ¤40.00 12/18/2023
REINSPECTION RESIDENTIAL ¤40.00 12/18/2023
SW ENG REINSPECTION 30 ¤30.00 12/18/2023
SW ENG REINSPECTION 30 ¤30.00 12/18/2023
SW ENG - REVIEW 20 ¤20.00 07/21/2023
SW ENG RES REVIEW 200 ¤200.00 07/21/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/21/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/21/2023
SEWER CREDIT (¤850.00) 07/21/2023
SEWER INSPECTION ¤25.00 07/21/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/21/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/21/2023
SITE PLAN 30 ¤30.00 07/21/2023
CONNECTION FEES ¤1,166.26 07/21/2023
WATER- TURN ON ¤25.00 07/21/2023
ADJUSTMENT 50% (¤330.94) 07/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/21/2023
INSPECTION - RESIDENTIAL ¤492.25 07/21/2023
PLAN REVIEW - RESIDENTIAL ¤139.62 07/21/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/21/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/21/2023
FC IMPACT FEE EMS ¤62.00 07/21/2023
IMPACT FEE FIRE ¤420.52 07/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/21/2023
FC IMPACT FEE LIBRARY ¤268.00 07/21/2023
IMPACT FEE PARKS ¤1,769.15 07/21/2023
IMPACT FEE SCHOOL ¤5,450.00 07/21/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 07/21/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/21/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/21/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/21/2023
SURCHARGE FS 533.721 ¤3.31 07/21/2023
SURCHARGE - FS 468.631 ¤4.97 07/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/21/2023
SW ENG INSPECTION 80 ¤80.00 07/21/2023
SW ENG PRE APRON ¤30.00 07/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,618.84