I want to search for...
Permit #2023070150
Permit Details
Status: COED
| Parcel Id: 07-11-31-7060-00280-0180 |
| CONDITIONED SPACE: 1880 sqft |
| GARAGE: 487 sqft |
| OPENED PORCH (WITH ROOF) : 300 sqft |
| OPENED PORCH (WITH ROOF) : 32 sqft |
| Total Square Footage: 2699 sqft |
| Block: 00280 |
| Subdivision: - |
| Job Phone: 386-871-8082 |
| Location Address: 99 SLOGANEER TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2023 |
| NOC: RECORDED |
| Applicant name: GAYLORD JAY DOWNER |
| Owner: DOWNER JAMES |
|
Address 100 E KENTUCKY AVE H-105 DELAND, FL 32724 |
| Lot: 0180 |
| Contracted Stated Job Value: ¤325,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
TRIAD BUILDING GROUP, LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1280 BISCAYNE BLVD # 11 DELAND, FL 32724 |
CBC1262885 (Exp: 08/31/2026) | 386-873-2791 |
Sub Contractors
FRED L HOUGH JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4740 HIGHWAY 11 DE LEON SPRINGS, FL 32130 |
EC13010201 (Exp: 08/31/2026) | 386-736-0253 |
RICHARD LEE VONBROCKEN
| Status | Location Address | State License Number | Phone | Fax |
| INACTIVE |
1738 STATE AVE HOLLY HILL, FL 32117 |
CAC035516 (Exp: 08/31/2026) | (386)672-1950 | (386)672-1952 |
GAYLORD JAY DOWNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1280 BISCAYNE BLVD # 11 DELAND, FL 32724 |
CBC1262885 (Exp: 08/31/2026) | 386-873-2791 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 04/12/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irrigation-nobcross connection | |||
| BLD - BUILDING FINAL | 04/10/2024 | FINAL APPROVED | BTAYLOR |
| Note: 3/28/2024 - PREVIOUS INSPECTION NOTES 3-28-24 1. Energy cals do not match equiptment installed. | |||
| BLD - BUILDING FINAL | 03/28/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-28-24 1. Energy cals do not match equiptment installed. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/20/2024 | FINAL APPROVED | JHARDING |
| Note: 3/19/2024 - PREVIOUS INSPECTION NOTES No power to pep panel | |||
| ROW - STORMWATER FINAL | 03/19/2024 | APPROVED | TPOLACEK |
| Note: 03/19/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/19/2024 | Disapproved - NO FEE | JHARDING |
| Note: No power to pep panel | |||
| ROW - FINAL APRON (AFTER POUR) | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/15/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 02/29/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 2/26/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 12-13-23 1. Emailed FPL at 12:47. 2-26-24 1. All outlets in kitchen either pulled out or dont have covers on them. 2-29-24 1. Emailed FPL at 2:14. | |||
| ELECTRIC - EARLY POWER | 02/26/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 12-13-23 1. Emailed FPL at 12:47. 2-26-24 1. All outlets in kitchen either pulled out or dont have covers on them. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/21/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/21/24 PIPE IS WITHIN TOLERANCE. THEY ARE ADDING FRONT ROAD EDGE FORMBOARD AT THIS TIME. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. _______________________________________________________________________________________________________________________ 2/20/2024 - PREVIOUS INSPECTION NOTED | |||
| ROW- PRE-APRON (PRE-POUR) | 02/20/2024 | CANCELLED BY APPLICANT | FSLADISH |
| U - SEWER TIE IN | 02/16/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO CHANGE PLUMBING SUB CONTRACTOR BEFORE NEXT INSPECTION | |||
| GRAVITY SEWER TEST | 02/16/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 NEED TO CHANGE PLUMBING SUB CONTRACTOR BEFORE NEXT INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 01/26/2024 | APPROVED | BVITALE |
| LATH/BRICK/ WATER BARRIER | 01/04/2024 | APPROVED | BTAYLOR |
| INSULATION | 12/20/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 12/18/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 12/13/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12-13-23 1. Emailed FPL at 12:47. | |||
| ROOF VALLEY & METAL | 12/08/2023 | APPROVED | BTAYLOR |
| Note: 12/5/2023 - PREVIOUS INSPECTION NOTES 12-5-23 1. Incorrect nailing pattern for underlaymant. | |||
| ROOF VALLEY & METAL | 12/05/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 12-5-23 1. Incorrect nailing pattern for underlaymant. | |||
| WALL SHEATHING | 11/29/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/29/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 11/28/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/08/2023 | APPROVED | BTAYLOR |
| Note: 11/6/2023 - PREVIOUS INSPECTION NOTES 11/6/23: * no address marked as required.(FBC 319.1 / 501.2). * Missing dowels & rebar at 2 locations. Marked on plans * Window sill mortar beds along with mortar joints at precast window sills are too thick. 1/2" Max per FBC R606.3.1 Marked at sills & highlighted on plans. * Check mortar joints in between block that are excessive. | |||
| TIE BEAM / LINTEL | 11/06/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/6/23: * no address marked as required.(FBC 319.1 / 501.2). * Missing dowels & rebar at 2 locations. Marked on plans * Window sill mortar beds along with mortar joints at precast window sills are too thick. 1/2" Max per FBC R606.3.1 Marked at sills & highlighted on plans. * Check mortar joints in between block that are excessive. | |||
| MONOLITHIC SLAB | 10/24/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 10/23/23: Small (8" x 11") prints are not clearly legible. Large prints are not stamped approved. Please provide legible approved prints before re-inspection. (11" x 17" minimum preferably). 1). No compaction report. 2). Right side plumbing sleeve is not fully through the footer as required. (305.3). | |||
| MONOLITHIC SLAB | 10/24/2023 | APPROVED | BTAYLOR |
| Note: 10/23/2023 - PREVIOUS INSPECTION NOTES 10/23/23: Small (8" x 11") prints are not clearly legible. Large prints are not stamped approved. Please provide legible approved prints before re-inspection. (11" x 17" minimum preferably). 1). No compaction report. 2). Right side plumbing sleeve is not fully through the footer as required. (305.3). | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/19/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: NEED TO CHANGE PLUMBING SUB CONTRACTOR BEFORE NEXT INSPECTION | |||
| WATER METER INSTALLATION REQUEST | 09/13/2023 | APPROVED | CBOWERMASTER |
| Note: 9/5/2023 12:39:23 PM- PREVIOUS INSPECTION NOTES wooded lot | |||
| WATER METER INSTALLATION REQUEST | 09/05/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: wooded lot |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/05/2024 | 04/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/23/2023 | 08/24/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/22/2023 | 08/22/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Engineer plans still call out for a 400 amp service and so do the electric load calcs. | |||
| MECH | HOLD | 08/22/2023 | 08/23/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide heatload calculation. it is missing from Energy calcs | |||
| BLD | COMPLETE | 08/22/2023 | 08/23/2023 |
| Note: Released By: JPI | |||
| ELEC | COMPLETE | 08/22/2023 | 08/22/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/02/2023 | 08/04/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide heatlaod and duct layout signed by AC contractor. 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| ELEC | HOLD | 08/02/2023 | 08/03/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. 2/0 Alum. is not rated for the 400 mp service. NEC 2017 Table 310.15(B)(16) | |||
| ZON | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/02/2023 | 08/07/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| BLD | HOLD | 07/08/2023 | 07/16/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| BADMIN | COMPLETE | 07/08/2023 | 07/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/06/2023 | 07/07/2023 |
| Note: Held By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Released By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 07/06/2023 | 07/10/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/06/2023 | 07/10/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Electrical load calculations do not match the living space of the house. NEC 2017 220 2. Submit a electrical riser diagram that includes all wire sizes and breaker sizes | |||
| ENGIN1 | COMPLETE | 07/06/2023 | 07/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/06/2023 | 07/10/2023 |
| LOCATE | COMPLETE | 07/06/2023 | 07/10/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/06/2023 | 07/10/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Provide Entire heatload and duct layout signed by the AC contractor 2. Energy Calcs need to be signed by the owner/ owner agent below the preparer per R103.1.1.2 FBC Energy Conservation 2020 7Th edition | |||
| SW1 | COMPLETE | 07/06/2023 | 07/17/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/06/2023 | 07/11/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide sod type and if irrigation will be installed on landscape plan Must have a minimum of four shrubs along each front side wrapping corners of home Horizontal band must wrap the left corner at least two foot | |||
| SWALE | COMPLETE | 07/06/2023 | 08/10/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/10/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/10/2024 |
| REINSPECTION FEE | ¤40.00 | 04/10/2024 |
| SURCHARGE FS 533.721 | ¤5.89 | 08/24/2023 |
| SURCHARGE - FS 468.631 | ¤8.83 | 08/24/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/24/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/24/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/24/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/24/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/24/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/24/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/24/2023 |
| SEWER CREDIT | (¤1,466.00) | 08/24/2023 |
| SEWER INSPECTION | ¤25.00 | 08/24/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/24/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/24/2023 |
| SITE PLAN 30 | ¤30.00 | 08/24/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/24/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/24/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/24/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/24/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/24/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/24/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/24/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/24/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/24/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/24/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/24/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/24/2023 |
| CONNECTION FEES | ¤1,166.26 | 08/24/2023 |
| WATER- TURN ON | ¤25.00 | 08/24/2023 |
| ADJUSTMENT 50% | (¤588.63) | 08/24/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/24/2023 |
| INSPECTION - RESIDENTIAL | ¤893.75 | 08/24/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤253.50 | 08/24/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,199.47 |