I want to search for...

Permit #2023070225

Permit Details

Status: COED

Parcel Id: 07-11-31-7059-00170-0030
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
Total Square Footage: 2942 sqft
Block: 00170
Subdivision: 2211 - SECTION 59-SEMINOLE PARK
Job Phone: 831-383-2883
Location Address: 2 SEA SWIRL PL
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 02/06/2024
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: FLORIDA SUN PARTNERS II LLC

Address

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

Lot: 0030
Contracted Stated Job Value: ¤220,324.00
Job Description: Single Family Residence
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CFC1430061 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
ROW - FINAL APRON (AFTER POUR) 09/25/2024 APPROVED FSLADISH
Note: 9/25/24 PIPE ELEVATION IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ______________________________________________________________________________________________________________________ 9/23/2024 - PREVIOUS INSPECTION NOTES CANCELED BY TEXT -------------------------------------------------- 9/13/24 UPON WALKING PROPERTY FOUND AREAS OF WASHOUTS ON BOTH SIDES OF DRIVEWAY NEAR MITERED ENDS AND DRIVEWAY APRON. THERE ARE AREAS ON THE LEFT SIDE PROPERTY LINE THAT WILL NEED TO BE FILLED IN, COMPACTED AND SODDED TO MATCH GRADE. IN THE REAR LEFT CORNER THERE IS A GOOD AMOUNT OF STANDING WATER IN AN AREA THAT APPEARS TO HAVE BEEN DISTURBED DURING CLEARING. I CALLED CM DAN AND ASKED HIM FOR ANY INFO AND LET HIM KNOW THAT UNLESS WE HAVE PHOTOS AND A COMMUNICATION TRAIL THAT THIS WAS EXISTING PRE CLEARING, THEY WOULD BE REQUIRED TO CORRECT THIS AREA TO AS GOOD OR BETTER CONDITION. HE INDICATED HE DID NOT KNOW BUT WOULD CONTACT THE NEIGHBOR TO FIND OUT INFORMATION REGARDING THIS. HE INDICATED THAT THEY WOULD FIX THIS AREA IF NEED BE. BASED ON THIS CONVERSATION AS A COURTESY I LET HIM KNOW THAT I WOULD PASS THE FIELD SURVEY AS NOTED WITH THE CAVEAT THAT THESE AREAS WILL NEED TO BE REPAIRED BEFORE A ROW FINAL PASSAGE. HE AGREED. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW - STORMWATER FINAL 09/25/2024 APPROVED FSLADISH
Note: 9/25/24 AT THE TIME OF THIS THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED ________________________________________________________________________________________________________________________ 9/23/2024 - PREVIOUS INSPECTION NOTES CANCELED BY TEXT --------------------------------------------- 9/13/24 UPON WALKING PROPERTY FOUND AREAS OF WASHOUTS ON BOTH SIDES OF DRIVEWAY NEAR MITERED ENDS AND DRIVEWAY APRON. THERE ARE AREAS ON THE LEFT SIDE PROPERTY LINE THAT WILL NEED TO BE FILLED IN, COMPACTED AND SODDED TO MATCH GRADE. IN THE REAR LEFT CORNER THERE IS A GOOD AMOUNT OF STANDING WATER IN AN AREA THAT APPEARS TO HAVE BEEN DISTURBED DURING CLEARING. I CALLED CM DAN AND ASKED HIM FOR ANY INFO AND LET HIM KNOW THAT UNLESS WE HAVE PHOTOS AND A COMMUNICATION TRAIL THAT THIS WAS EXISTING PRE CLEARING, THEY WOULD BE REQUIRED TO CORRECT THIS AREA TO AS GOOD OR BETTER CONDITION. HE INDICATED HE DID NOT KNOW BUT WOULD CONTACT THE NEIGHBOR TO FIND OUT INFORMATION REGARDING THIS. HE INDICATED THAT THEY WOULD FIX THIS AREA IF NEED BE. BASED ON THIS CONVERSATION AS A COURTESY I LET HIM KNOW THAT I WOULD PASS THE FIELD SURVEY AS NOTED WITH THE CAVEAT THAT THESE AREAS WILL NEED TO BE REPAIRED BEFORE A ROW FINAL PASSAGE. HE AGREED. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW - STORMWATER FINAL 09/23/2024 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELED BY TEXT --------------------------------------------- 9/13/24 UPON WALKING PROPERTY FOUND AREAS OF WASHOUTS ON BOTH SIDES OF DRIVEWAY NEAR MITERED ENDS AND DRIVEWAY APRON. THERE ARE AREAS ON THE LEFT SIDE PROPERTY LINE THAT WILL NEED TO BE FILLED IN, COMPACTED AND SODDED TO MATCH GRADE. IN THE REAR LEFT CORNER THERE IS A GOOD AMOUNT OF STANDING WATER IN AN AREA THAT APPEARS TO HAVE BEEN DISTURBED DURING CLEARING. I CALLED CM DAN AND ASKED HIM FOR ANY INFO AND LET HIM KNOW THAT UNLESS WE HAVE PHOTOS AND A COMMUNICATION TRAIL THAT THIS WAS EXISTING PRE CLEARING, THEY WOULD BE REQUIRED TO CORRECT THIS AREA TO AS GOOD OR BETTER CONDITION. HE INDICATED HE DID NOT KNOW BUT WOULD CONTACT THE NEIGHBOR TO FIND OUT INFORMATION REGARDING THIS. HE INDICATED THAT THEY WOULD FIX THIS AREA IF NEED BE. BASED ON THIS CONVERSATION AS A COURTESY I LET HIM KNOW THAT I WOULD PASS THE FIELD SURVEY AS NOTED WITH THE CAVEAT THAT THESE AREAS WILL NEED TO BE REPAIRED BEFORE A ROW FINAL PASSAGE. HE AGREED. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW - FINAL APRON (AFTER POUR) 09/23/2024 CANCELLED BY APPLICANT PFLANAGAN
Note: CANCELED BY TEXT -------------------------------------------------- 9/13/24 UPON WALKING PROPERTY FOUND AREAS OF WASHOUTS ON BOTH SIDES OF DRIVEWAY NEAR MITERED ENDS AND DRIVEWAY APRON. THERE ARE AREAS ON THE LEFT SIDE PROPERTY LINE THAT WILL NEED TO BE FILLED IN, COMPACTED AND SODDED TO MATCH GRADE. IN THE REAR LEFT CORNER THERE IS A GOOD AMOUNT OF STANDING WATER IN AN AREA THAT APPEARS TO HAVE BEEN DISTURBED DURING CLEARING. I CALLED CM DAN AND ASKED HIM FOR ANY INFO AND LET HIM KNOW THAT UNLESS WE HAVE PHOTOS AND A COMMUNICATION TRAIL THAT THIS WAS EXISTING PRE CLEARING, THEY WOULD BE REQUIRED TO CORRECT THIS AREA TO AS GOOD OR BETTER CONDITION. HE INDICATED HE DID NOT KNOW BUT WOULD CONTACT THE NEIGHBOR TO FIND OUT INFORMATION REGARDING THIS. HE INDICATED THAT THEY WOULD FIX THIS AREA IF NEED BE. BASED ON THIS CONVERSATION AS A COURTESY I LET HIM KNOW THAT I WOULD PASS THE FIELD SURVEY AS NOTED WITH THE CAVEAT THAT THESE AREAS WILL NEED TO BE REPAIRED BEFORE A ROW FINAL PASSAGE. HE AGREED. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
BLD - BUILDING FINAL 09/18/2024 FINAL APPROVED BTAYLOR
Note: 9/16/2024 - PREVIOUS INSPECTION NOTES 9-16-24 1. No hot water. 2. Air handler needs to have lockout breaker installed.
BLD - BUILDING FINAL 09/16/2024 Disapproved - NO FEE BTAYLOR
Note: 9-16-24 1. No hot water. 2. Air handler needs to have lockout breaker installed.
U-CROSS CONNECTION 09/16/2024 APPROVED - AS NOTED BWRIGHT
Note: IRR with potable water. PVB in place. No CC.
U -UTILITY RESIDENTIAL FINAL 09/16/2024 FINAL APPROVED BWRIGHT
ROW FIELD SURVEY /GRADING CERTIFICATION 09/13/2024 APPROVED - AS NOTED FSLADISH
Note: 9/13/24 UPON WALKING PROPERTY FOUND AREAS OF WASHOUTS ON BOTH SIDES OF DRIVEWAY NEAR MITERED ENDS AND DRIVEWAY APRON. THERE ARE AREAS ON THE LEFT SIDE PROPERTY LINE THAT WILL NEED TO BE FILLED IN, COMPACTED AND SODDED TO MATCH GRADE. IN THE REAR LEFT CORNER THERE IS A GOOD AMOUNT OF STANDING WATER IN AN AREA THAT APPEARS TO HAVE BEEN DISTURBED DURING CLEARING. I CALLED CM DAN AND ASKED HIM FOR ANY INFO AND LET HIM KNOW THAT UNLESS WE HAVE PHOTOS AND A COMMUNICATION TRAIL THAT THIS WAS EXISTING PRE CLEARING, THEY WOULD BE REQUIRED TO CORRECT THIS AREA TO AS GOOD OR BETTER CONDITION. HE INDICATED HE DID NOT KNOW BUT WOULD CONTACT THE NEIGHBOR TO FIND OUT INFORMATION REGARDING THIS. HE INDICATED THAT THEY WOULD FIX THIS AREA IF NEED BE. BASED ON THIS CONVERSATION AS A COURTESY I LET HIM KNOW THAT I WOULD PASS THE FIELD SURVEY AS NOTED WITH THE CAVEAT THAT THESE AREAS WILL NEED TO BE REPAIRED BEFORE A ROW FINAL PASSAGE. HE AGREED. PHOTOS FOR REFERENCE. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9463 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/12/2024 APPROVED - AS NOTED FSLADISH
Note: 9/12/24 ELEVATION SHOTS AGAINST STRUCTURE PROVIDED AS REQUIRED. ELEVATION SHOT IN SWALE AT CORNER REVISED TO INDICATE FLOW AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED THAT I WILL VERIFY ON FIELD SURVEY INSPECTION. __________________________________________________________________________________________________________________________ 9/10/2024 - PREVIOUS INSPECTION NOTES 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW- FINAL SURVEY/GRADING CERTIFICATION 09/10/2024 Disapproved - NO FEE FSLADISH
Note: 9/10/24 YOU NEED TO PROVIDE ELEVATION SHOTS ON ALL CORNERS OF THE STUCTURE AND EVERY 20 FT ALONG IT. SO WE CAN DETERMINE IF IT MEETS BELOW FFE REQUIREMENTS. FRONT TWO CORNERS HAVE NO ELEVATION SHOTS. YOU ARE SHOWING YOU SWALE TO BE 5 TENTHS HIGHER (25.3) AT THE CORNER THAN THE PREVIOUS SHOT OF 24.8 UPSTREAM. THIS WILL IMPEDE DRAINAGE FLOW AND CAUSE WATER TO POOL IN THIS AREA. Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for woodframe structures. (H) Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. Inspector Notes from Inspection 9270 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT WITHIN SWALE PLAN DIAGRAM TOLERANCE. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ELECTRIC - EARLY POWER 08/23/2024 APPROVED - AS NOTED KSANDOE
Note: Release Power
FLOOR / WALL PENETRATION 08/23/2024 APPROVED KSANDOE
GRAVITY SEWER TEST 08/02/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 08/02/2024 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 07/30/2024 APPROVED - AS NOTED FSLADISH
Note: 7/30/24 BM WAS'NT MATCHING UP. SPOKE TO JEFF CREWS WHO INDICATED HE SPOKE WITH THE GRADER AND THAT THE BM HAD SOMEHOW BEEN DAMAGED. JEFF TOLD ME TO SET LEFT SIDE CENTER LINE 26.10 AS BM AND CONFIRM RIGHT SIDE (INTERSECTION) WAS 26.25 AS INDICATED IN HIS NOTES. RIGHT WAS 26.20. USING THE 26.10 AS MY BASE LINE, PIPE SHOT 24.40 to a 24.38. JEFF SAID THIS WAS ACCEPTABLE SO I AM GOING TO APPROVE THIS AS NOTED. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
PEP TANK INSTALLATION REQUEST 07/16/2024 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 07/03/2024 APPROVED BTAYLOR
INSULATION 07/03/2024 APPROVED BTAYLOR
ALL ROUGH 06/28/2024 APPROVED BTAYLOR
ELECTRIC-TUG 06/27/2024 APPROVED RMARTIN
ROOF VALLEY & METAL 06/25/2024 APPROVED BTAYLOR
WALL SHEATHING 06/20/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 06/20/2024 APPROVED - AS NOTED BTAYLOR
Note: 6-20-24 1. Silt fence needs to be replaced before next inspection.
FOUND SURVEY APPROVED (OFFICE) 06/18/2024 APPROVED TBAKER
TIE BEAM / LINTEL 06/05/2024 APPROVED BTAYLOR
MONOLITHIC SLAB 05/28/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 05/22/2024 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 04/25/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 07/10/2024 07/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/10/2024 07/10/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 06/17/2024 06/18/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 06/17/2024 06/17/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
MECH COMPLETE 04/08/2024 04/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH HOLD 04/05/2024 04/08/2024
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Plans show unvented attic. Energy Calcs say vented. revise calcs
BLD COMPLETE 04/01/2024 04/02/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 12/22/2023 01/03/2024
Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM
ZON COMPLETE 12/22/2023 12/22/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/11/2023 12/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 12/11/2023 12/19/2023
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- Please add adjacent elevations to lot 4 at a 20-foot interval and a 10 foot offset. 2- Please confirm/clarify one existing elevation that shows 00 inside the property.
ZON COMPLETE 12/11/2023 12/11/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/01/2023 12/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/01/2023 12/01/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
SW1 HOLD 12/01/2023 12/11/2023
Note: Held By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM 1- Please add adjacent elevations to lot 4 at a 20-foot interval and revise the proposed elevations adjacent to lot 4 to ensure that they do not negatively affect it. 2- Please depict the proposed loation of the PEP tank. 3- Please revise one existing elevation that shows 00.
ZON HOLD 10/26/2023 10/26/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Floor plan and site plan have been corrected so that the AC pad is on the right side. Now you must still have the landscape plan corrected to match.
ENGIN1 HOLD 10/26/2023 10/26/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation disagrees with other site elevations by .6'
SW1 COMPLETE 10/26/2023 11/07/2023
Note: Released By: JEFF CREWS - - JCREWS@PALMCOASTGOV.COM
ZON HOLD 09/14/2023 09/14/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Floor plan: Shows the AC on the right of the house all other plans show the ac on the left of the home. Site plan ladscape and floor plan should match
ENGIN1 HOLD 09/14/2023 09/15/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation disagrees with other site elevations by .6'
SW1 HOLD 09/14/2023 09/20/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM The subject lots drainage must not negatively impact any adjacent property. (B) Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) WATER IN THE BACK YARD IS RUNNING INTO THE EMPTY LOT IN THE BACK. STORMWATER NEED TO RUN FROM THE BACK TO THE FRONT
BLD COMPLETE 09/14/2023 09/15/2023
Note: Released By: JPI
ELEC COMPLETE 09/14/2023 09/15/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 08/25/2023 08/28/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation disagrees with other site elevations by .6' Wrong survey was submitted on 8-18
ENGIN1 COMPLETE 08/18/2023 08/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/18/2023 08/18/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Site plan submitted not for this address REPEAT COMMENT: window on right side of home is missing banding around the window
BLD COMPLETE 08/18/2023 08/19/2023
Note: Released By: JPI
SW1 HOLD 08/18/2023 08/28/2023
Note: Held By: FRANK SLADISH - - FSLADISH@PALMCOASTGOV.COM Must provide the actual proposed FFE of the structure not just a minimum on your site plan.
ENGIN1 HOLD 08/11/2023 08/11/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation disagrees with other site elevations by .6'
BLD HOLD 07/24/2023 07/24/2023
Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
ZON HOLD 07/24/2023 07/24/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Repeat comment Elevation plan : window on Row side RS of home is missing banding around the window
ENGIN1 COMPLETE 07/24/2023 07/25/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation disagrees with other site elevations by .6'
SW1 HOLD 07/24/2023 07/31/2023
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Need more elevations off the rear patio demonstrating enough drainage away from the structure.
ELEC COMPLETE 07/24/2023 07/25/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 HOLD 07/17/2023 07/17/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Site benchmark elevation disagrees with other site elevations by .6'
BLD HOLD 07/07/2023 07/07/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 07/07/2023 07/10/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/07/2023 07/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/07/2023 07/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/07/2023 07/10/2023
LOCATE COMPLETE 07/07/2023 07/11/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/07/2023 07/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/07/2023 07/17/2023
Note: Held By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM Must have an accepted sight plan to review.
ZON HOLD 07/07/2023 07/11/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: please add material of walkway Elevation plan : window on Row side RS of home is missing banding around the window
BADMIN COMPLETE 07/07/2023 07/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 07/07/2023 12/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 09/25/2024
PLAN REVIEW - REVISION ¤32.50 09/25/2024
CONTRACTOR CHANGE ¤20.00 09/25/2024
CONTRACTOR CHANGE ¤20.00 09/25/2024
CONTRACTOR CHANGE ¤20.00 02/06/2024
CONNECTION FEES ¤1,166.26 02/06/2024
WATER- TURN ON ¤25.00 02/06/2024
ADJUSTMENT 50% (¤512.73) 02/06/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 02/06/2024
INSPECTION - RESIDENTIAL ¤775.50 02/06/2024
PLAN REVIEW - RESIDENTIAL ¤219.96 02/06/2024
FC IMPACT FEE EMS ¤62.00 02/06/2024
IMPACT FEE FIRE ¤420.52 02/06/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 02/06/2024
FC IMPACT FEE LIBRARY ¤268.00 02/06/2024
IMPACT FEE PARKS ¤1,769.15 02/06/2024
IMPACT FEE SCHOOL ¤5,450.00 02/06/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 02/06/2024
WATER -IRRIGATION INSPECTION ¤25.00 02/06/2024
SURCHARGE FS 533.721 ¤5.13 02/06/2024
SURCHARGE - FS 468.631 ¤7.69 02/06/2024
SW ENG - FOUNDATION SURVEY ¤20.00 02/06/2024
SW ENG INSPECTION 80 ¤80.00 02/06/2024
SW ENG PRE APRON ¤30.00 02/06/2024
SW ENG - REVIEW 20 ¤20.00 02/06/2024
SW ENG RES REVIEW 200 ¤200.00 02/06/2024
SEWER CREDIT (¤1,342.00) 02/06/2024
SEWER INSPECTION ¤25.00 02/06/2024
SEWER CAPITAL FACILITY ¤5,344.82 02/06/2024
WATER CAPITAL FACILITY FEE ¤3,923.88 02/06/2024
SITE PLAN 30 ¤30.00 02/06/2024
Fees Total Due: ¤0.00 Total Paid: ¤20,185.68