Permit #2023070295
Permit Details
Status: COED
| Parcel Id: 07-11-31-7032-00620-0040 |
| CONDITIONED SPACE: 2274 sqft |
| GARAGE: 494 sqft |
| OPENED PORCH (WITH ROOF) : 212 sqft |
| Total Square Footage: 2980 sqft |
| Block: 00620 |
| Subdivision: 2155 - SECTION 32-ROYAL PALMS |
| Job Phone: 229-375-9123 |
| Location Address: 24 ROCKING LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/25/2023 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JMR III |
|
Address 10 WHITTINGTON DR PALM COAST, FL 32164 |
| Lot: 0040 |
| Contracted Stated Job Value: ¤313,812.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
RBI HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
21 CEDARWOOD CT PALM COAST, FL 32137 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
WILLIAM ROBERT BARRICK
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
50 LEANNI WAY PALM COAST, FL 32137 |
STE E2 PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2025) | 229-375-9123 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/09/2024 | FINAL APPROVED | AGAETANO |
| Note: 5/8/2024 - PREVIOUS INSPECTION NOTES 05-08-2024 1. Multiple outlets loose. Check all. 2. Lanai outlets need waterproof covers. | |||
| BLD - BUILDING FINAL | 05/08/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 05-08-2024 1. Multiple outlets loose. Check all. 2. Lanai outlets need waterproof covers. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/03/2024 | APPROVED | TPOLACEK |
| Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 9:29:03 AM *** PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME OF THE INSPECTION ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| ROW - STORMWATER FINAL | 05/03/2024 | APPROVED | TPOLACEK |
| Note: *** NOTES ADDED BY TPOLACEK 5/3/2024 9:29:34 AM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| U -UTILITY RESIDENTIAL FINAL | 05/03/2024 | FINAL APPROVED | DHANEY |
| Note: Inspector Notes from Inspection 9035 has potable irrigation with PVB-no cross connection | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/01/2024 | APPROVED | TPOLACEK |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/01/2024 | APPROVED | TPOLACEK |
| Note: 05/01/24 BUILDER CREATED THE REQUESTED DRAINAGE SYSTEM IN THE BACK YARD. DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY.AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THE BUILDER NEEDS TO SUBMIT A NEW SITE PLAN. ADDITIONALLY, THEY NEED TO CREATE A DRAINAGE SYSTEM THAT GOES FROM THE BACK TO THE FRONT BY MAKING A SWALE AROUND THE PROPERTY THAT IS AT LEAST 3/10 LOWER THAN THE PROPERTY LINE.PER GBERTOLA | |||
| U-CROSS CONNECTION | 05/01/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: has potable irrigation with PVB-no cross connection | |||
| ROW- PRE-APRON (PRE-POUR) | 04/24/2024 | APPROVED | TPOLACEK |
| Note: AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED | |||
| ROW- PROJECT STATUS | 04/18/2024 | APPROVED | GBERTOLA |
| Note: 4/18/24= meeting with the builder | |||
| ROW- PROJECT STATUS | 03/27/2024 | APPROVED | GBERTOLA |
| Note: THE BUILDER NEEDS TO SUBMIT A NEW SITE PLAN. ADDITIONALLY, THEY NEED TO CREATE A DRAINAGE SYSTEM THAT GOES FROM THE BACK TO THE FRONT BY MAKING A SWALE AROUND THE PROPERTY THAT IS AT LEAST 3/10 LOWER THAN THE PROPERTY LINE.per gbertola | |||
| ELECTRIC - EARLY POWER | 03/12/2024 | APPROVED | JWALKER |
| Note: 3/11/2024 - PREVIOUS INSPECTION NOTES Master toilet room missing double switch cover. | |||
| ELECTRIC - EARLY POWER | 03/11/2024 | Disapproved - NO FEE | JWALKER |
| Note: Master toilet room missing double switch cover. | |||
| GRAVITY SEWER TEST | 02/14/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 02/14/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 01/10/2024 | APPROVED | JWALKER |
| Note: 1/8/2024 - PREVIOUS INSPECTION NOTES Wire mesh will need to be installed over the exposed zip tape around the windows. Zip tape is not an approved base for plaster. | |||
| INSULATION | 01/09/2024 | APPROVED | JWALKER |
| Note: 1/8/2024 - PREVIOUS INSPECTION NOTES 1/8/24 The below listed corrections from the all rough inspection have not been completed. 1. The HVAC distribution box above the kitchen area is missing supports. 2. Microwave exhaust duct. Seal all mechanical joints and install nail plates front and rear at the 2x4 wall top plate. 3. Missing nail plates for wire above the den / study window at the top chord. Check for corrections at the Insulation inspection. | |||
| INSULATION | 01/08/2024 | Disapproved - NO FEE | JWALKER |
| Note: 1/8/24 The below listed corrections from the all rough inspection have not been completed. 1. The HVAC distribution box above the kitchen area is missing supports. 2. Microwave exhaust duct. Seal all mechanical joints and install nail plates front and rear at the 2x4 wall top plate. 3. Missing nail plates for wire above the den / study window at the top chord. Check for corrections at the Insulation inspection. | |||
| LATH/BRICK/ WATER BARRIER | 01/08/2024 | Disapproved - NO FEE | JWALKER |
| Note: Wire mesh will need to be installed over the exposed zip tape around the windows. Zip tape is not an approved base for plaster. | |||
| ALL ROUGH | 01/04/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. The HVAC distribution box above the kitchen area is missing supports. 2. Microwave exhaust duct. Seal all mechanical joints and install nail plates front and rear at the 2x4 wall top plate. 3. Missing nail plates for wire above the den / study window at the top chord. Check for corrections at the Insulation inspection. | |||
| ELECTRIC TEMP POLE | 12/28/2023 | APPROVED | JWALKER |
| Note: 12/22/2023 - PREVIOUS INSPECTION NOTES Cross bacing 2x's have not been supported at the bases. Common practice is to drive stake's into the ground and nail the cross braces to the stake's. 12/21/2023 - PREVIOUS INSPECTION NOTES Post needs to be cross braced both ways. | |||
| ELECTRIC TEMP POLE | 12/22/2023 | Disapproved - NO FEE | JWALKER |
| Note: Cross bacing 2x's have not been supported at the bases. Common practice is to drive stake's into the ground and nail the cross braces to the stake's. 12/21/2023 - PREVIOUS INSPECTION NOTES Post needs to be cross braced both ways. | |||
| ROW - DRAINAGE | 12/22/2023 | APPROVED | TPOLACEK |
| Note: 12/22/23 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ___________________________________________________________________________________________ 12/15/2023 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE THE PORTER JOHN OUT OF RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO PUT A SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND LEAVE AN ENTRANCE TO YOUR LOT THE SILT FENCE ALONG THE RIGHT OF WAY WILL ALLOW NO SEDIMENT TO WASH IN THE ROADSIDE SWALE ANY MORE 3) NEED TO LEAVE THE ROADSIDE SWALE OPEN AT ALL TIMES DURING CONSTRCTION OR PUT AN TEMP. CULVERT SO WATER WILL FLOW TO OUTFALL 4) NEED TO CLEAN ALL SEDIMENT OUT OF ADJACENT LOTS ROADSIDE SWALE NEXT INSPECTION ON 12/22/23. YOU WILL HAVE 7 BUSINESS DAY TO FIX ALL AREAS ABOVE OR THERE WILL BE AN INSPECTION HOLD ON THIS CONSTRCTION SITE. | |||
| ELECTRIC TEMP POLE | 12/21/2023 | Disapproved - NO FEE | JWALKER |
| Note: Post needs to be cross braced both ways. | |||
| ROW - DRAINAGE | 12/15/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) NEED TO REMOVE THE PORTER JOHN OUT OF RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO PUT A SILT FENCE AROUND THE ENTIRE CONSTRUCTION SITE AND LEAVE AN ENTRANCE TO YOUR LOT THE SILT FENCE ALONG THE RIGHT OF WAY WILL ALLOW NO SEDIMENT TO WASH IN THE ROADSIDE SWALE ANY MORE 3) NEED TO LEAVE THE ROADSIDE SWALE OPEN AT ALL TIMES DURING CONSTRCTION OR PUT AN TEMP. CULVERT SO WATER WILL FLOW TO OUTFALL 4) NEED TO CLEAN ALL SEDIMENT OUT OF ADJACENT LOTS ROADSIDE SWALE NEXT INSPECTION ON 12/22/23. YOU WILL HAVE 7 BUSINESS DAY TO FIX ALL AREAS ABOVE OR THERE WILL BE AN INSPECTION HOLD ON THIS CONSTRCTION SITE. | |||
| ROOF VALLEY & METAL | 12/05/2023 | APPROVED | JWALKER |
| Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 11/29/23 Peel and stick or metal is required in valleys 11/17/23 Items 2 and 4 listed below need to be corrected prior to all rough inspection. 11/15/2023 - PREVIOUS INSPECTION NOTES 1. Please have a full set of approved drawings in order onsited for reinspection. 2. Front entry framing and truss connections are concealed by sheating. All sheating does Not need to be removed. Just remove enough to unconceal. 3. The HTS20 anchor at the garage bearing wall needs to attach to the PLS post below. Wrapping around the top plate is not the correct application. 4. Rear bearing wall missing the CS stapping at the 2x8 header. 5. Install the L-50 anchor at the overframing. See over framing detail. 6. Truss T-14 is missing a hold down anchor at the inner CMU wall. | |||
| ROOF VALLEY & METAL | 11/29/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 11/29/23 Peel and stick or metal is required in valleys 11/17/23 Items 2 and 4 listed below need to be corrected prior to all rough inspection. 11/15/2023 - PREVIOUS INSPECTION NOTES 1. Please have a full set of approved drawings in order onsited for reinspection. 2. Front entry framing and truss connections are concealed by sheating. All sheating does Not need to be removed. Just remove enough to unconceal. 3. The HTS20 anchor at the garage bearing wall needs to attach to the PLS post below. Wrapping around the top plate is not the correct application. 4. Rear bearing wall missing the CS stapping at the 2x8 header. 5. Install the L-50 anchor at the overframing. See over framing detail. 6. Truss T-14 is missing a hold down anchor at the inner CMU wall. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/17/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 11/17/23 Items 2 and 4 listed below need to be corrected prior to all rough inspection. 11/15/2023 - PREVIOUS INSPECTION NOTES 1. Please have a full set of approved drawings in order onsited for reinspection. 2. Front entry framing and truss connections are concealed by sheating. All sheating does Not need to be removed. Just remove enough to unconceal. 3. The HTS20 anchor at the garage bearing wall needs to attach to the PLS post below. Wrapping around the top plate is not the correct application. 4. Rear bearing wall missing the CS stapping at the 2x8 header. 5. Install the L-50 anchor at the overframing. See over framing detail. 6. Truss T-14 is missing a hold down anchor at the inner CMU wall. | |||
| WALL SHEATHING | 11/15/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/15/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Please have a full set of approved drawings in order onsited for reinspection. 2. Front entry framing and truss connections are concealed by sheating. All sheating does Not need to be removed. Just remove enough to unconceal. 3. The HTS20 anchor at the garage bearing wall needs to attach to the PLS post below. Wrapping around the top plate is not the correct application. 4. Rear bearing wall missing the CS stapping at the 2x8 header. 5. Install the L-50 anchor at the overframing. See over framing detail. 6. Truss T-14 is missing a hold down anchor at the inner CMU wall. | |||
| FOUND SURVEY APPROVED (OFFICE) | 10/05/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/26/2023 | APPROVED | KSANDOE |
| Note: 9/25/2023 - PREVIOUS INSPECTION NOTES 1. Lintel 9 at the garage calls for to #5 rebar to be installed at the bottom. Only 1 installed. 2. Lintel (6) at the rear lanai slider opening calls for 2 at the top and 2 at the bottom reinforcing bars. Only 1 installed top and bottom. 3. Rear lanai lintel not numbered also calls for 2 top and 2 bottom only 1 installed. See page 4.0FF of the prints. 4. Lintel (2) at the front entry 2 top and 2 bottom. 5. The precast window sills have not been installed. | |||
| TIE BEAM / LINTEL | 09/25/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. Lintel 9 at the garage calls for to #5 rebar to be installed at the bottom. Only 1 installed. 2. Lintel (6) at the rear lanai slider opening calls for 2 at the top and 2 at the bottom reinforcing bars. Only 1 installed top and bottom. 3. Rear lanai lintel not numbered also calls for 2 top and 2 bottom only 1 installed. See page 4.0FF of the prints. 4. Lintel (2) at the front entry 2 top and 2 bottom. 5. The precast window sills have not been installed. | |||
| MONOLITHIC SLAB | 09/13/2023 | APPROVED | JWALKER |
| PLUMBING 1ST ROUGH UNDERGROUND | 09/01/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/18/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 04/08/2024 | 04/08/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM For future submittals, please include a description of what the change/revision is. Site plans are not reviewed by the Building Staff, boxes identifed should be one of these, zoning, stormwater or engineering. | |||
| SW1 | COMPLETE | 04/08/2024 | 04/15/2024 |
| Note: Released By: SINA VEDADI MOGHADAM - (386)986-2569 - SVEDADIMOGHADAM@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/08/2024 | 04/08/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 04/04/2024 | 04/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/31/2024 | 02/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/31/2024 | 02/01/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/02/2024 | 01/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 01/02/2024 | 01/02/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/14/2023 | 11/16/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/04/2023 | 10/04/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/21/2023 | 08/22/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/21/2023 | 08/28/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/21/2023 | 08/21/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/15/2023 | 08/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/19/2023 | 07/24/2023 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 07/11/2023 | 08/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/10/2023 | 07/16/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/10/2023 | 07/10/2023 |
| LOCATE | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/10/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/10/2023 | 07/18/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/10/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/08/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/08/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/08/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/08/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/08/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 05/08/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/08/2024 |
| CONNECTION FEES | ¤1,166.26 | 07/25/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/25/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/25/2023 |
| SEWER CREDIT | (¤1,147.00) | 07/25/2023 |
| SEWER INSPECTION | ¤25.00 | 07/25/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/25/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/25/2023 |
| SITE PLAN 30 | ¤30.00 | 07/25/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/25/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/25/2023 |
| WATER-METER | ¤505.39 | 07/25/2023 |
| WATER- TURN ON | ¤25.00 | 07/25/2023 |
| WATER- TURN ON | ¤25.00 | 07/25/2023 |
| ADJUSTMENT 50% | (¤569.21) | 07/25/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/25/2023 |
| INSPECTION - RESIDENTIAL | ¤863.50 | 07/25/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤244.92 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/25/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/25/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/25/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/25/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/25/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/25/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/25/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/25/2023 |
| SURCHARGE FS 533.721 | ¤5.69 | 07/25/2023 |
| SURCHARGE - FS 468.631 | ¤8.54 | 07/25/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/25/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,033.96 |