I want to search for...

Permit #2023070306

Permit Details

Status: COED

Parcel Id: 07-11-31-7026-00710-0040
CONDITIONED SPACE: 1243 sqft
GARAGE: 425 sqft
OPENED PORCH (WITH ROOF) : 31 sqft
Total Square Footage: 1699 sqft
Block: 00710
Subdivision: 2153 - SECTION 26-PINE GROVE
Job Phone: 202-494-2019
Location Address: 16 PITTSON LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/01/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2 LLC

Address

3670 MAGUIRE BOULEVARD SUITE 220

ORLANDO, FL 32803

Lot: 0040
Contracted Stated Job Value: ¤125,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
ROW - STORMWATER FINAL 04/25/2024 APPROVED - AS NOTED FSLADISH
Note: 4/25/24 DIRT REMOVED. SWALE SET TO GRADE AT THE TIME OF THIS INSPECTION. PASSING AS NOTED THAT THE REQUIRED CORRECTIONS FROM PREVIOUS INSPECTORS NOTES COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ 4/23/2024 - PREVIOUS INSPECTION NOTES 04/23/24 THERE HAVE BEEN NO CHANGES AT THIS TIME. PLEASE READ PREVIOUS NOTES AND MAKE CORRECTIONS BEFORE SUBMITTING THE NEXT INSPECTION. IT'S NECESSARY TO REMOVE ALL THE DIRT PILED UP AGAINST THE VINYL FENCE ON THE BACKYARD PROPERTY LINE. THE FRONT SWALE NEEDS TO MATCH THE EXISTING GRADE ALL ACROSS, AS WATER FLOWS FROM RIGHT TO LEFT.per gbertola
U -UTILITY RESIDENTIAL FINAL 04/23/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 no irr-no cross connection
ROW - STORMWATER FINAL 04/23/2024 Disapproved -FEE REQUIRED TPOLACEK
Note: 04/23/24 THERE HAVE BEEN NO CHANGES AT THIS TIME. PLEASE READ PREVIOUS NOTES AND MAKE CORRECTIONS BEFORE SUBMITTING THE NEXT INSPECTION. IT'S NECESSARY TO REMOVE ALL THE DIRT PILED UP AGAINST THE VINYL FENCE ON THE BACKYARD PROPERTY LINE. THE FRONT SWALE NEEDS TO MATCH THE EXISTING GRADE ALL ACROSS, AS WATER FLOWS FROM RIGHT TO LEFT.per gbertola
BLD - BUILDING FINAL 04/23/2024 FINAL APPROVED RSIMS
ROW - FINAL APRON (AFTER POUR) 04/19/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/19/2024 APPROVED GBERTOLA
Note: 4/19/24= CORRECTION WERE MADE AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ DURING THE MEETING WITH THE BUILDER, I NOTICED THAT THEY DID NOT FOLLOW THE SITE PLAN THE FINAL SURVEY SHOULD WAS BUILT ONE FOOT HIGHER THAN WHAT THEY PROPOSED. I AGREE WITH THE INSPECTOR ED MADISON
ROW FIELD SURVEY /GRADING CERTIFICATION 04/19/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR
ROW- PROJECT STATUS 04/02/2024 APPROVED - AS NOTED GBERTOLA
Note: DURING THE MEETING WITH THE BUILDER, I NOTICED THAT THEY DID NOT FOLLOW THE SITE PLAN THE FINAL SURVEY SHOULD WAS BUILT ONE FOOT HIGHER THAN WHAT THEY PROPOSED. I AGREE WITH THE INSPECTOR ED MADISON
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/28/2024 Disapproved - NO FEE EMADISON
Note: ** 03/28/24 AFTER FURTHER REVIEW OF THE SUBMITTED FINAL YOUR ELEVATIONS ARE 1 FOOT HIGHER THAN WHAT WAS PROPOSED ON YOUR SUBMITTED SITE PLAN THIS WAS MISSED ON PREVIOUS REVIEWS. __________________________________________________________________________________________________________________ 3/26/2024 - PREVIOUS INSPECTION NOTES 03/26/24 AFTER REGRADE AND CREATION OF INSIDE SWALE THERE ARE NO ELEVATION SHOTS ON SURVEY TO INDICATE DRAINAGE FLOW. THERE ARE HIGH AND LOW ELEVATION CHANGES ALONG RIGHT SIDE PROPERTY LINE FROM FENCE TO SWALE. THERE NEEDS TO BE ELEVATION SHOTS INDICATING CORRECT FLOW. --------------------------------------------------------------------------- 3/18/2024 - PREVIOUS INSPECTION NOTES ** 03/18/24FINAL SURVEY SHOWS YOU ARE PUSHING YOUR WATER BACK AT YOUR STRUCTURE ** Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) ** FFE ARE REQUIRED OF ALL ADJACENT PROPERTIES THIS INCLUDES THE PROPERTIES ALONG THE REAR PROPERTY LINE ** CULVERT IS OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/26/2024 Disapproved - NO FEE TPOLACEK
Note: 03/26/24 AFTER REGRADE AND CREATION OF INSIDE SWALE THERE ARE NO ELEVATION SHOTS ON SURVEY TO INDICATE DRAINAGE FLOW. THERE ARE HIGH AND LOW ELEVATION CHANGES ALONG RIGHT SIDE PROPERTY LINE FROM FENCE TO SWALE. THERE NEEDS TO BE ELEVATION SHOTS INDICATING CORRECT FLOW. --------------------------------------------------------------------------- 3/18/2024 - PREVIOUS INSPECTION NOTES ** 03/18/24FINAL SURVEY SHOWS YOU ARE PUSHING YOUR WATER BACK AT YOUR STRUCTURE ** Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) ** FFE ARE REQUIRED OF ALL ADJACENT PROPERTIES THIS INCLUDES THE PROPERTIES ALONG THE REAR PROPERTY LINE ** CULVERT IS OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/18/2024 Disapproved - NO FEE EMADISON
Note: ** 03/18/24FINAL SURVEY SHOWS YOU ARE PUSHING YOUR WATER BACK AT YOUR STRUCTURE ** Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) ** FFE ARE REQUIRED OF ALL ADJACENT PROPERTIES THIS INCLUDES THE PROPERTIES ALONG THE REAR PROPERTY LINE ** CULVERT IS OUT OF TOLERANCE IN ACCORDANCE WITH THE CITY OF PALM COASTS SWALE PLAN
ROW- PRE-APRON (PRE-POUR) 02/09/2024 APPROVED - AS NOTED FSLADISH
Note: 2/9/24 PIPE IS GOOD. MAKE SURE ALL WATER IS OUT OF THE MITERED END AND THE MITERED END FOOTER IS 6" X 6" AS REQUIRED BY COPC SPECS. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U-CROSS CONNECTION 02/09/2024 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW- PRE-APRON (PRE-POUR) 02/06/2024 CANCELLED BY APPLICANT WEB
ELECTRIC - EARLY POWER 02/06/2024 APPROVED RSIMS
Note: 2/6/24: FPL emailed to release power. Inspector Notes from Inspection 2200 Emailed FPL @ 1234. Release Power
GRAVITY SEWER TEST 01/30/2024 APPROVED MGIBSON
U - SEWER TIE IN 01/30/2024 APPROVED MGIBSON
INSULATION 01/10/2024 APPROVED FWILLIS
Note: 12/28/2023 - PREVIOUS INSPECTION NOTES Interior garage door not installed Inspector Notes from Inspection 2420 12/22/23: Check at next inspection. Must be complete prior to Insulation Inspection. 1). Lineset sleeve needs to be fully sealed. 2). Ground conduit sleeve needs to go fully from ground to Meter panel box. 3). Master bedroom window is missing anchors on the bottom sash. 4). Interior garage door is not installed.
PEP TANK INSTALLATION REQUEST 01/09/2024 APPROVED BVITALE
INSULATION 12/28/2023 Disapproved -FEE REQUIRED KSANDOE
Note: Interior garage door not installed Inspector Notes from Inspection 2420 12/22/23: Check at next inspection. Must be complete prior to Insulation Inspection. 1). Lineset sleeve needs to be fully sealed. 2). Ground conduit sleeve needs to go fully from ground to Meter panel box. 3). Master bedroom window is missing anchors on the bottom sash. 4). Interior garage door is not installed.
LATH/BRICK/ WATER BARRIER 12/27/2023 APPROVED RSIMS
Note: Inspector Notes from Inspection 2420 12/22/23: Check at next inspection. Must be complete prior to Insulation Inspection. 1). Lineset sleeve needs to be fully sealed. 2). Ground conduit sleeve needs to go fully from ground to Meter panel box. 3). Master bedroom window is missing anchors on the bottom sash. 4). Interior garage door is not installed.
ALL ROUGH 12/22/2023 APPROVED - AS NOTED RSIMS
Note: 12/22/23: Check at next inspection. Must be complete prior to Insulation Inspection. 1). Lineset sleeve needs to be fully sealed. 2). Ground conduit sleeve needs to go fully from ground to Meter panel box. 3). Master bedroom window is missing anchors on the bottom sash. 4). Interior garage door is not installed.
ROOF VALLEY & METAL 12/18/2023 APPROVED FWILLIS
Note: 12/13/2023 - PREVIOUS INSPECTION NOTES R905.1.1.1 Underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured horizontally and vertically, of 12 inches (305 mm) o.c. between side laps, and one row at the end and side laps fastened 6 inches (152 mm) o.c.
WALL SHEATHING 12/13/2023 APPROVED KSANDOE
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/13/2023 APPROVED KSANDOE
ROOF VALLEY & METAL 12/13/2023 Disapproved - NO FEE KSANDOE
Note: R905.1.1.1 Underlayment shall be attached to a nailable deck with corrosion-resistant fasteners with a maximum fastener spacing, measured horizontally and vertically, of 12 inches (305 mm) o.c. between side laps, and one row at the end and side laps fastened 6 inches (152 mm) o.c.
ELECTRIC-TUG 12/13/2023 APPROVED - AS NOTED KSANDOE
Note: Emailed FPL @ 1234. Release Power
FOUND SURVEY APPROVED (OFFICE) 12/12/2023 APPROVED TBAKER
TIE BEAM / LINTEL 11/07/2023 APPROVED KSANDOE
MONOLITHIC SLAB 10/18/2023 APPROVED KSANDOE
Note: 10/16/2023 - PREVIOUS INSPECTION NOTES Foundation areas have washedd in and need to be rebuilt. New inspection due to canceled inspection 10/11/2023 - PREVIOUS INSPECTION NOTES Steel on left side of garage is resting on earth and needs to be cleaned out under. Steel accross the back needs to be 3" from foundation walls 10/3/2023 - PREVIOUS INSPECTION NOTES Areas of the foundation in the rear have caved under the barrier and need to be cleaned out. Garage floor is soft. Does not feel compacted under foot. 3" minimum clearance for rebar has not been met throughout
MONOLITHIC SLAB 10/16/2023 Disapproved -FEE REQUIRED KSANDOE
Note: Foundation areas have washedd in and need to be rebuilt. New inspection due to canceled inspection 10/11/2023 - PREVIOUS INSPECTION NOTES Steel on left side of garage is resting on earth and needs to be cleaned out under. Steel accross the back needs to be 3" from foundation walls 10/3/2023 - PREVIOUS INSPECTION NOTES Areas of the foundation in the rear have caved under the barrier and need to be cleaned out. Garage floor is soft. Does not feel compacted under foot. 3" minimum clearance for rebar has not been met throughout
MONOLITHIC SLAB 10/12/2023 CANCELLED BY APPLICANT WEB
Note: 10/11/2023 - PREVIOUS INSPECTION NOTES Steel on left side of garage is resting on earth and needs to be cleaned out under. Steel accross the back needs to be 3" from foundation walls 10/3/2023 - PREVIOUS INSPECTION NOTES Areas of the foundation in the rear have caved under the barrier and need to be cleaned out. Garage floor is soft. Does not feel compacted under foot. 3" minimum clearance for rebar has not been met throughout
MONOLITHIC SLAB 10/11/2023 Disapproved -FEE REQUIRED KSANDOE
Note: Steel on left side of garage is resting on earth and needs to be cleaned out under. Steel accross the back needs to be 3" from foundation walls 10/3/2023 - PREVIOUS INSPECTION NOTES Areas of the foundation in the rear have caved under the barrier and need to be cleaned out. Garage floor is soft. Does not feel compacted under foot. 3" minimum clearance for rebar has not been met throughout
MONOLITHIC SLAB 10/03/2023 Disapproved - NO FEE KSANDOE
Note: Areas of the foundation in the rear have caved under the barrier and need to be cleaned out. Garage floor is soft. Does not feel compacted under foot. 3" minimum clearance for rebar has not been met throughout
PLUMBING 1ST ROUGH UNDERGROUND 09/29/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/21/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 03/15/2024 03/19/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 03/15/2024 03/15/2024
Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM THE ENERGY CALCULATION SUBMITTED FOR INCORRECT ADDRESS OTHER WAS SUBMITTED FOR REVIEW
ENGIN1 COMPLETE 12/12/2023 12/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/12/2023 12/12/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 HOLD 10/02/2023 10/03/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 10/02/2023 10/02/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ZON COMPLETE 07/18/2023 07/18/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 07/18/2023 07/19/2023
Note: Released By: JPI
ENGIN1 COMPLETE 07/18/2023 07/18/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 07/18/2023 07/24/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
SWALE COMPLETE 07/11/2023 08/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 07/10/2023 07/16/2023
Note: Held By: JPI 1. 25103.R1 as been applied for based on the DBPR website but is not approved. Please select a different option.
CUSVC COMPLETE 07/10/2023 07/10/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/10/2023 07/11/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/10/2023 07/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/10/2023 07/10/2023
LOCATE COMPLETE 07/10/2023 07/11/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/10/2023 07/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/10/2023 07/18/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 07/10/2023 07/11/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need one additional tree. Ac pad location on floor plan doesn't match site and landscape plan
BADMIN COMPLETE 07/10/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 04/25/2024
SW ENG REINSPECTION 20 ¤20.00 04/15/2024
REINSPECTION RESIDENTIAL ¤40.00 03/15/2024
REINSPECTION RESIDENTIAL ¤40.00 03/15/2024
REINSPECTION RESIDENTIAL ¤40.00 03/15/2024
CONNECTION FEES ¤1,166.26 08/01/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/01/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/01/2023
FC IMPACT FEE EMS ¤62.00 08/01/2023
IMPACT FEE FIRE ¤420.52 08/01/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/01/2023
FC IMPACT FEE LIBRARY ¤268.00 08/01/2023
IMPACT FEE PARKS ¤1,769.15 08/01/2023
IMPACT FEE SCHOOL ¤5,450.00 08/01/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 08/01/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/01/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/01/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/01/2023
SURCHARGE FS 533.721 ¤2.92 08/01/2023
SURCHARGE - FS 468.631 ¤4.38 08/01/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/01/2023
SW ENG INSPECTION 80 ¤80.00 08/01/2023
SW ENG PRE APRON ¤30.00 08/01/2023
WATER- TURN ON ¤25.00 08/01/2023
ADJUSTMENT 50% (¤292.11) 08/01/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/01/2023
INSPECTION - RESIDENTIAL ¤431.75 08/01/2023
PLAN REVIEW - RESIDENTIAL ¤122.46 08/01/2023
SW ENG - REVIEW 20 ¤20.00 08/01/2023
SW ENG RES REVIEW 200 ¤200.00 08/01/2023
TRANS IMPACT FEE ADMIN ¤54.36 08/01/2023
TRANS IMPACT FEE ADMIN (¤54.36) 08/01/2023
SEWER CREDIT (¤1,342.00) 08/01/2023
SEWER INSPECTION ¤25.00 08/01/2023
SEWER CAPITAL FACILITY ¤5,344.82 08/01/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 08/01/2023
SITE PLAN 30 ¤30.00 08/01/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,007.03