I want to search for...

Permit #2023070310

Permit Details

Status: COED

Parcel Id: 07-11-31-7034-01020-0290
CONDITIONED SPACE: 2258 sqft
GARAGE: 767 sqft
OPENED PORCH (WITH ROOF) : 276 sqft
OPENED PORCH (WITH ROOF) : 64 sqft
Total Square Footage: 3365 sqft
Block: 01020
Subdivision: 2165 - SECTION 34-EASTHAMPTON
Job Phone: 386-931-4799
Location Address: 8 EVANSVILLE LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/28/2023
NOC: RECORDED
Applicant name: JOHN DONALD GORDON
Owner: PRECISION CUSTOM BUILDERS OF NORTH FLORIDA LLC

Address

7755 SOUTH US 1

BUNNELL, FL 32110

Lot: 0290
Contracted Stated Job Value: ¤375,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PRECISION CUSTOM BUILDERS OF NORTH FLORIDA, LLC
Status Location Address State License Number Phone
ACTIVE

7755 S. US HWY 1

BUNNELL, FL 32110

CGC1528576 (Exp: 08/31/2026) 386-931-4799

Sub Contractors

DANIEL DAVID RUTKOWSKI III
Status Location Address State License Number Phone Fax
ACTIVE

1687 STATE AVENUE

HOLLY HILL, FL 32117

CCC1328639 (Exp: 08/31/2026) 386-290-7490 386-256-0001
MARK JOHN LUTCZA
Status Location Address State License Number Phone
ACTIVE

26 ROYAL LEAF LANE

PALM COAST, FL 32164

EC13005145 (Exp: 08/31/2026) 386-586-0770
RICHARD GARY WILSON JR
Status Location Address Mailing Address State License Number Phone
ACTIVE

1504 OLD MOODY BLVD

BUNNELL, FL 32110

UNIT 6

BUNNELL, FL 32110

CAC1817645 (Exp: 08/31/2026) 386-586-6290
JACOB D CASTLE
Status Location Address State License Number Phone
CANCEL

508 N MOORE ST

BUNNELL, FL 32110

RF11067810 (Exp: 08/31/2027) 386-864-5066

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/16/2024 FINAL APPROVED RSIMS
Note: 2/9/2024 - PREVIOUS INSPECTION NOTES 2-9-24 MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED PRODUCT 10/4/23: Need revision submitted for the different shingles (Certainteed Landmark) loaded on roof than what was originally submitted. (Tamko). 10/18/23: This house has spray foam insulation in the attic which was inspected & approved during Insulation Inspection.
BLD - BUILDING FINAL 02/09/2024 Disapproved -FEE REQUIRED LMILLER
Note: 2-9-24 MODEL NUMBERS ON ENERGY CALCS 403.6.1 MODEL NUMBERS NOT MATCHING MODEL NUMBER ON UNIT/UNITS... NEED TO OBTAIN APPROVED REVISION OR PLACE APPROVED PRODUCT 10/4/23: Need revision submitted for the different shingles (Certainteed Landmark) loaded on roof than what was originally submitted. (Tamko). 10/18/23: This house has spray foam insulation in the attic which was inspected & approved during Insulation Inspection.
U -UTILITY RESIDENTIAL FINAL 01/05/2024 FINAL APPROVED JHARDING
Note: 12/27/2023 - PREVIOUS INSPECTION NOTES Pep tank not completed , needs pump and floats - advised sewer dept. .
U-CROSS CONNECTION 12/27/2023 APPROVED DHANEY
U -UTILITY RESIDENTIAL FINAL 12/27/2023 Disapproved - NO FEE DHANEY
Note: Pep tank not completed , needs pump and floats - advised sewer dept. .
U - SEWER TIE IN 12/27/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
GRAVITY SEWER TEST 12/27/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/22/2023 APPROVED TPOLACEK
Note: 12/22/23 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW- FINAL SURVEY/GRADING CERTIFICATION 12/22/2023 CANCELLED BY INSPECTOR TPOLACEK
Note: DUPLICATE INSPECTION
ROW FIELD SURVEY /GRADING CERTIFICATION 12/22/2023 APPROVED TPOLACEK
Note: 12/22/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 12/22/2023 APPROVED TPOLACEK
Note: 12/22/23 AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 12/22/2023 APPROVED TPOLACEK
Note: 12/22/23 PIPE IS GOOD, CUTS ARE MADE, CULVERT CLEAR, HOT PATCH COMPLETE. AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ELECTRIC - EARLY POWER 11/17/2023 APPROVED RSIMS
Note: 11/16/2023 - PREVIOUS INSPECTION NOTES 11/16/23: * Master bathroom light fixture over shower stall is not safed off as required. Inspector Notes from Inspection 2170 8/24/23: FPL emailed at @ 14:55.
ELECTRIC - EARLY POWER 11/16/2023 Disapproved - NO FEE RSIMS
Note: 11/16/23: * Master bathroom light fixture over shower stall is not safed off as required. Inspector Notes from Inspection 2170 8/24/23: FPL emailed at @ 14:55.
ROW- PRE-APRON (PRE-POUR) 11/08/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARTS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
PEP TANK INSTALLATION REQUEST 10/23/2023 APPROVED CBOWERMASTER
INSULATION 10/18/2023 APPROVED RSIMS
LATH/BRICK/ WATER BARRIER 10/12/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 10/11/23: Must be complete prior to Insulation inspection. Check at Insulation. ** All of the bathroom exhaust fans have ductwork that is crushed at the fan to ductwork transition. Requires the appropriate fitting to complete the transition from rectangle to round.
ALL ROUGH 10/11/2023 APPROVED - AS NOTED RSIMS
Note: 10/11/23: Must be complete prior to Insulation inspection. Check at Insulation. ** All of the bathroom exhaust fans have ductwork that is crushed at the fan to ductwork transition. Requires the appropriate fitting to complete the transition from rectangle to round.
ROOF VALLEY & METAL 10/10/2023 APPROVED RSIMS
Note: 10/9/2023 - PREVIOUS INSPECTION NOTES 10/9/23: Previously listed items from Inspection 2460 must be fully resolved before any new inspections can be approved. All items remain unresolved. Inspector Notes from Inspection 2460 10/4/23: Check at next inspection. 1). Trusses C4 and C5 are missing engineering circled on truss docs. Also, plywood on ceiling is impeding verification of the 2nd area of engineering required. 2). C6 truss - ceiling plywood & ductwork are blocking view of engineering. Cannot be verified. 3). Garage load bearing wall requires SP2 brackets but SP4 straps were used. Please change or submit revision.
ROOF VALLEY & METAL 10/09/2023 Disapproved -FEE REQUIRED RSIMS
Note: 10/9/23: Previously listed items from Inspection 2460 must be fully resolved before any new inspections can be approved. All items remain unresolved. Inspector Notes from Inspection 2460 10/4/23: Check at next inspection. 1). Trusses C4 and C5 are missing engineering circled on truss docs. Also, plywood on ceiling is impeding verification of the 2nd area of engineering required. 2). C6 truss - ceiling plywood & ductwork are blocking view of engineering. Cannot be verified. 3). Garage load bearing wall requires SP2 brackets but SP4 straps were used. Please change or submit revision.
WALL SHEATHING 10/04/2023 APPROVED RSIMS
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/04/2023 APPROVED - AS NOTED RSIMS
Note: 10/4/23: Check at next inspection. 1). Trusses C4 and C5 are missing engineering circled on truss docs. Also, plywood on ceiling is impeding verification of the 2nd area of engineering required. 2). C6 truss - ceiling plywood & ductwork are blocking view of engineering. Cannot be verified. 3). Garage load bearing wall requires SP2 brackets but SP4 straps were used. Please change or submit revision.
ROOF VALLEY & METAL 10/04/2023 Disapproved -FEE REQUIRED RSIMS
Note: 10/4/23: Need revision submitted for the different shingles (Certainteed Landmark) loaded on roof than what was originally submitted. (Tamko) before Building Final Inspection. Added to Building Final. 1). 5" x 5" wall flashing is not secured to the CMU and is not sealed to the wall as required by Manufacturer & FBC.
FOUND SURVEY APPROVED (OFFICE) 10/03/2023 APPROVED TDOAK
TIE BEAM / LINTEL 09/06/2023 APPROVED RSIMS
ELECTRIC TEMP POLE 08/24/2023 APPROVED - AS NOTED RSIMS
Note: 8/24/23: FPL emailed at @ 14:55.
MONOLITHIC SLAB 08/15/2023 APPROVED RSIMS
PLUMBING 1ST ROUGH UNDERGROUND 08/10/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/08/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 02/12/2024 02/12/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
MECH COMPLETE 02/12/2024 02/15/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/05/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD HOLD 10/04/2023 10/05/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide updated roofing worksheet
SW1 COMPLETE 09/27/2023 09/27/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 09/22/2023 09/22/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Please submit original 2' Easement Encroachment Agreement. Also note that this encroachment must be approved by the City stormwater department so as not to impede drainage. Foundation survey will be re-reviewed once the above two items are complete.
SW1 HOLD 09/22/2023 09/25/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEW SITE PLAN DOES NOT HAVE ANY PROPOSED ELEVATIONS
ZON COMPLETE 09/22/2023 09/25/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/20/2023 09/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 09/20/2023 09/20/2023
Note: Held By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM Mechanical equipment pad encroaching in platted 5' utility easement.
BADMIN INFORMATION 09/01/2023 09/01/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Please describe what this is for- the locate survey has already been marked for water and sewer at the time of permit issuance, they dont change. You marked zoning, but the customer service/utility handles the locates.
BADMIN INFORMATION 09/01/2023 09/01/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM Repeat comment Please describe what this is for- the locate survey has already been marked for water and sewer at the time of permit issuance, they dont change. You marked zoning, but the customer service/utility handles the locates
CUSVC COMPLETE 08/22/2023 08/22/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ZON COMPLETE 07/19/2023 07/19/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ELEC COMPLETE 07/19/2023 07/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BLD COMPLETE 07/19/2023 07/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SW1 COMPLETE 07/19/2023 07/25/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/19/2023 07/19/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SWALE COMPLETE 07/11/2023 08/16/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD HOLD 07/10/2023 07/17/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal)
CUSVC COMPLETE 07/10/2023 07/11/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC HOLD 07/10/2023 07/13/2023
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit manufacture specs on the recess cans showing the fire rating.
ENGIN1 COMPLETE 07/10/2023 07/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/10/2023 07/10/2023
LOCATE COMPLETE 07/10/2023 07/12/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/10/2023 07/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 HOLD 07/10/2023 07/18/2023
Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO RE UPLOAD SITE PLAN TO BLURRY
ZON HOLD 07/10/2023 07/12/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM site plan: Site plan / survey scanned copy not legible Landscape plan: please look at the lanai area does not match the site plan all plans must match

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 02/12/2024
REINSPECTION RESIDENTIAL ¤40.00 02/09/2024
REINSPECTION RESIDENTIAL ¤40.00 02/09/2024
RECORDING FEE REIMBURSE DOC ¤35.50 10/03/2023
WATER-METER ¤505.39 09/13/2023
WATER- TURN ON ¤25.00 09/13/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/13/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/28/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/28/2023
SURCHARGE FS 533.721 ¤6.77 07/28/2023
SURCHARGE - FS 468.631 ¤10.15 07/28/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/28/2023
SW ENG INSPECTION 80 ¤80.00 07/28/2023
SW ENG PRE APRON ¤30.00 07/28/2023
SW ENG - REVIEW 20 ¤20.00 07/28/2023
SW ENG RES REVIEW 200 ¤200.00 07/28/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/28/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/28/2023
SEWER CREDIT (¤850.00) 07/28/2023
SEWER INSPECTION ¤25.00 07/28/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/28/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/28/2023
SITE PLAN 30 ¤30.00 07/28/2023
WATER- TURN ON ¤25.00 07/28/2023
ADJUSTMENT 50% (¤676.88) 07/28/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/28/2023
INSPECTION - RESIDENTIAL ¤1,031.25 07/28/2023
PLAN REVIEW - RESIDENTIAL ¤292.50 07/28/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 07/28/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/28/2023
CONNECTION FEES ¤1,166.26 07/28/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/28/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/28/2023
FC IMPACT FEE EMS ¤62.00 07/28/2023
IMPACT FEE FIRE ¤420.52 07/28/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/28/2023
FC IMPACT FEE LIBRARY ¤268.00 07/28/2023
IMPACT FEE PARKS ¤1,769.15 07/28/2023
IMPACT FEE SCHOOL ¤5,450.00 07/28/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,444.31