Permit #2023070324
Permit Details
Status: COED
| Parcel Id: 07-11-31-7063-00540-0010 |
| CONDITIONED SPACE: 1753 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 89 sqft |
| Total Square Footage: 2459 sqft |
| Block: 00540 |
| Subdivision: 2174 - SECTION 63-ZEBULAHS TRAIL |
| Job Phone: 202-494-2019 |
| Location Address: 6 ZAMIA PL |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/01/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0010 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/18/2024 | FINAL APPROVED | RSIMS |
| Note: 3/13/2024 - PREVIOUS INSPECTION NOTES 3-13-24 1. Energy cals do not match. 2. Air handler breaker needs to be bumped down. | |||
| BLD - BUILDING FINAL | 03/13/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 3-13-24 1. Energy cals do not match. 2. Air handler breaker needs to be bumped down. | |||
| U-CROSS CONNECTION | 03/13/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No irrigation, no cross connections. | |||
| ROW - FINAL APRON (AFTER POUR) | 03/11/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 03/11/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/11/2024 | FINAL APPROVED | JHARDING |
| BLD - BUILDING FINAL | 03/11/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/08/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/08/2024 | APPROVED | EMADISON |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/26/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 2/26/24 YOUR NUBERS IN THE REAR SHOW ALL DRAINAGE RUNNING OFF THE BACK OF THE PROPERTY. WE NEED ELEVATION SHOTS IN THE REAR AT THE HIGHSPOT AND AROUND TO THE ADJOIMING PROPERTY LINES, SHOWING US IF THE DRAINAGE IS GOING TO BE MOVING FROM REAR TO FRONT SWALE AS INDICATED ON YOUR SIGHT PLAN. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 2/1/24 PIPE IS GOOD. CORRECTION TO FPRMBOARDS MADE. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/30/2024 - PREVIOUS INSPECTION NOTES going to meet Bill tomorrow. Inspector Notes from Inspection 9270 2/1/24 PIPE IS GOOD. CORRECTION TO FPRMBOARDS MADE. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/30/2024 - PREVIOUS INSPECTION NOTES going to meet Bill tomorrow. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/1/24 PIPE IS GOOD. CORRECTION TO FPRMBOARDS MADE. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/30/2024 - PREVIOUS INSPECTION NOTES going to meet Bill tomorrow. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/30/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: going to meet Bill tomorrow. | |||
| ELECTRIC - EARLY POWER | 01/25/2024 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2200 12-15-23 1. Emailed FPL at 10:17. | |||
| GRAVITY SEWER TEST | 01/17/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 01/17/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 01/03/2024 | APPROVED | TCHURCHILL |
| LATH/BRICK/ WATER BARRIER | 12/22/2023 | APPROVED | RSIMS |
| INSULATION | 12/20/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 12/15/2023 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 12/15/2023 | APPROVED - AS NOTED | BTAYLOR |
| Note: 12-15-23 1. Emailed FPL at 10:17. | |||
| WALL SHEATHING | 11/30/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11/14/23: Only the left side middle window sill mortar bed remains too thick. All others are corrected. Check at next inspection. (marked with an X). 11/13/2023 - PREVIOUS INSPECTION NOTES 11-13-23 1. Missing dowels. 2. Mud beds for windows exceed 1/2". | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/30/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11/14/23: Only the left side middle window sill mortar bed remains too thick. All others are corrected. Check at next inspection. (marked with an X). 11/13/2023 - PREVIOUS INSPECTION NOTES 11-13-23 1. Missing dowels. 2. Mud beds for windows exceed 1/2". | |||
| ROOF VALLEY & METAL | 11/30/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 11/14/23: Only the left side middle window sill mortar bed remains too thick. All others are corrected. Check at next inspection. (marked with an X). 11/13/2023 - PREVIOUS INSPECTION NOTES 11-13-23 1. Missing dowels. 2. Mud beds for windows exceed 1/2". | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/15/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/14/2023 | APPROVED - AS NOTED | RSIMS |
| Note: 11/14/23: Only the left side middle window sill mortar bed remains too thick. All others are corrected. Check at next inspection. (marked with an X). 11/13/2023 - PREVIOUS INSPECTION NOTES 11-13-23 1. Missing dowels. 2. Mud beds for windows exceed 1/2". | |||
| TIE BEAM / LINTEL | 11/13/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: 11-13-23 1. Missing dowels. 2. Mud beds for windows exceed 1/2". | |||
| MONOLITHIC SLAB | 10/18/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 10/17/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/19/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/14/2024 | 03/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/17/2023 | 10/18/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 10/17/2023 | 10/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/24/2023 | 07/25/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/18/2023 | 07/18/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need one more foundation planting in the front. Must have a minimum of 8 shrubs along the front. | |||
| BLD | COMPLETE | 07/18/2023 | 07/19/2023 |
| Note: Released By: JPI | |||
| ENGIN1 | COMPLETE | 07/18/2023 | 07/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/18/2023 | 07/24/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/11/2023 | 08/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/10/2023 | 07/16/2023 |
| Note: Held By: JPI 1. Product 25103.2 R1 has been applied for on the DBPR website but has not been approved. Please select a different product. | |||
| CUSVC | COMPLETE | 07/10/2023 | 07/10/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/10/2023 | 07/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/10/2023 | 07/10/2023 |
| LOCATE | COMPLETE | 07/10/2023 | 07/12/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/10/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/10/2023 | 07/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/10/2023 | 07/12/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Front layout of house on plans do not match the layout on site and landscape plans | |||
| BADMIN | COMPLETE | 07/10/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 08/01/2023 |
| ADJUSTMENT 50% | (¤410.36) | 08/01/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/01/2023 |
| INSPECTION - RESIDENTIAL | ¤616.00 | 08/01/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤174.72 | 08/01/2023 |
| CONNECTION FEES | ¤1,166.26 | 08/01/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/01/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/01/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/01/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/01/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/01/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/01/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/01/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/01/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/01/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/01/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/01/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/01/2023 |
| SURCHARGE FS 533.721 | ¤4.10 | 08/01/2023 |
| SURCHARGE - FS 468.631 | ¤6.16 | 08/01/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/01/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/01/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/01/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/01/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/01/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/01/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/01/2023 |
| SEWER CREDIT | (¤1,342.00) | 08/01/2023 |
| SEWER INSPECTION | ¤25.00 | 08/01/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/01/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/01/2023 |
| SITE PLAN 30 | ¤30.00 | 08/01/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,968.25 |