I want to search for...
Permit #2023070384
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00350-0130 |
| CONDITIONED SPACE: 2208 sqft |
| GARAGE: 438 sqft |
| OPENED PORCH (WITH ROOF) : 197 sqft |
| Total Square Footage: 2843 sqft |
| Block: 00350 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 386-445-9009 |
| Location Address: 4 RED BIRCH LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/25/2023 |
| NOC: RECORDED |
| Applicant name: BRIAN ANDREW GAZZOLI |
| Owner: SEAGATE HOMES LLC |
|
Address 185 CYPRESS POINT PKWY STE 7 PALM COAST, FL 32164 |
| Lot: 0130 |
| Contracted Stated Job Value: ¤315,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
SEAGATE HOMES, LLC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
185 CYPRESS POINT PARKWAY Palm Coast, FL 32137 |
SUITE 7 Palm Coast, FL 32137 |
CGC1518372 (Exp: 08/31/2026) | 386-246-6132 |
Sub Contractors
RICHARD H SIMMONS JR
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 1963 BUNNELL, FL 32110 |
ES12001217 (Exp: 08/31/2026) | 386-437-0607 | 386-437-1847 |
TIMUR ISPARYAN
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
3665 SPRINK PARK ROAD JACKSONVILLE , FL 32207 |
CMC1249968 (Exp: 08/31/2026) | 904-245-1818 | 904-337-1910 |
CHAD DAVID GRESSANI
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2640 BROOKSHIRE CIRCLE MELBOURNE, FL 32904 |
CCC1327235 (Exp: 08/31/2026) | 321-288-6415 | 321-729-8997 |
GLEN WILLIAM KEHLE
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
P. O. Box 353511 BUNNELL, FL 32110 |
CFC057241 (Exp: 08/31/2026) | (386) 447-4249 | (386) 437-8488 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/10/2024 | FINAL APPROVED | AGAETANO |
| Note: 5/9/2024 - PREVIOUS INSPECTION NOTES 05-09-2024 Job Johnny on site. | |||
| BLD - BUILDING FINAL | 05/09/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 05-09-2024 Job Johnny on site. | |||
| U-CROSS CONNECTION | 05/09/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: *** NOTES ADDED BY LFITZGERALD 5/9/2024 10:59:33 AM *** has potable irr with PVB-no cross connection | |||
| U -UTILITY RESIDENTIAL FINAL | 05/09/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - STORMWATER FINAL | 05/03/2024 | APPROVED | GBERTOLA |
| Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:19:36 AM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR rjg. NOTE TO INSPECTOR: Nieghbor at 6 very worried about the drainage from this new home. Please double check that there is a clearly defined swale and no stormwater will drain onto her lot. | |||
| ROW - FINAL APRON (AFTER POUR) | 05/03/2024 | APPROVED | GBERTOLA |
| Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:19:05 AM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 05/03/2024 | APPROVED | GBERTOLA |
| Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:17:54 AM *** The back slope of the property is steep because of a crest that blocks water from flowing in the opposite direction. As a result, the sides of the property's house have elevated areas. However, if we construct a common swale, the water will flow back. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 4/30/2024 - PREVIOUS INSPECTION NOTES 04/30/24 The site plan indicates a common swale on both sides of the property. the survey shows an inside swale. The site plan indicates an elevation of 29.40 proposed at back berm and final survey shows 30.50. this is over the .40 allowed deviation. the right side of struction has 2 numbers that are off from the rest of the struture. 28.80 & 28.70. You will need to regrade both sides and back to conform to the site plan that was submitted and approved. Inspector Notes from Inspection 9270 ** 04/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 05/03/2024 | APPROVED | GBERTOLA |
| Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:18:39 AM *** The back slope of the property is steep because of a crest that blocks water from flowing in the opposite direction. As a result, the sides of the property's house have elevated areas. However, if we construct a common swale, the water will flow back. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR NOTE TO INSPECTOR : THIS CONSTRUCTION SITE NEEDS TO MATCH THE SITE PLAN FOR THERE DRAINAGE PLAN AS COMMON SWALES WHERE THERE ELEVATIONS ARE LOWER THAN ADJOINING LOTS SO THERE SWALE WILL MOVE ALL WATER FROM THE BACK TO FRONT. THE HIGH POINT NEEDS TO BE A MINIMUM OF .50 LOWER THE FINISH GRADE OUTSIDE THE HOUSE SO NO WATER WILL IMPACT THE ADJOINING LOTS TO THE RIGHT OR LEFT. ---------------------------------------------------------------------------------------------------- ENSURE THAT WATER DOES NOT AFFECT THE NEIGHBORS ON THE LEFT SIDE OF THE HOUSE..per Rgross and gbertola | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/30/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 04/30/24 The site plan indicates a common swale on both sides of the property. the survey shows an inside swale. The site plan indicates an elevation of 29.40 proposed at back berm and final survey shows 30.50. this is over the .40 allowed deviation. the right side of structure has 2 numbers that are off from the rest of the structure. 28.80 & 28.70. You will need to regrade both sides and back to conform to the site plan that was submitted and approved. Inspector Notes from Inspection 9270 ** 04/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW - DRAINAGE | 04/12/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/12/24 THERE IS NO STANDING WATER RESIDENT AT 6 RED BIRCH LN SHOWED PHOTOS OF DRAINAGE CONVEYANCE BETWEEN # 6 AND # 4 HAD FLOWING WATER FROM REAR TO FRONT THERE IS NO STANDING WATER THE GROUND IS NOT MUDDY OR SOFT ** NO ISSUES NOTED AT THE TIME OF THIS INSPECTION WHEN FINAL SURVEY IS SUBMITTED INSPECTOR NEEDS TO CHECK THE ELEVATION OF PROPOSED SITE PLAN AND FINAL SURVEY CITIZEN AT 6 RED BIRCH SAYS THE BACKYARD IS TOO HIGH. PLEASE INSPECT. MH | |||
| ROW- PRE-APRON (PRE-POUR) | 04/02/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 04/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW - DRAINAGE | 03/27/2024 | APPROVED - AS NOTED | PFLANAGAN |
| Note: THIS IS STILL IN THE PROCESS OF DOING THE FINAL GRADE AT THIS TIME. WILL NOT KNOW IF THE BERM IS TO HIGH WITH OUT A FINAL SURVEY THAT SHOWS THE ELEVATION OF THE BERM. I AM PUTTING NOTES IN THE FINAL SURVEY AND THE FIELD INSPECTION THAT THIS CONSTRUCTION SITE NEEDS TO MATCH THE SITE PLAN FOR THERE DRAINAGE PLAN AS COMMON SWALE WHERE THERE ELEVATIONS ARE LOWER THAN ADJOINING LOTS. AND THEY NEED TO START THERE HIGH POINT .50 LOWER THE FINISH GRADE OUTSIDE THE HOUSE SO NO WATER WILL IMPACT THE ADJOINING LOTS TO THE RIGHT OR LEFT. --------------------------------------------------------------------------------------------------- CITIZEN AT 4 SAYS THEY HAVE ADDED MORE FILL DIRT AND THE BACKYARD IS TOO HIGH PLS INSPECT MH | |||
| ELECTRIC - EARLY POWER | 03/20/2024 | APPROVED | RMARTIN |
| GRAVITY SEWER TEST | 02/08/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 02/08/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/02/2024 | APPROVED | BVITALE |
| LATH/BRICK/ WATER BARRIER | 01/26/2024 | APPROVED | JWALKER |
| INSULATION | 01/24/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 Dryer exhaust duct has not been completed. Check for correction at insulation. | |||
| ALL ROUGH | 01/18/2024 | APPROVED - AS NOTED | JWALKER |
| Note: Dryer exhaust duct has not been completed. Check for correction at insulation. | |||
| ROOF VALLEY & METAL | 01/10/2024 | APPROVED | JWALKER |
| WALL SHEATHING | 01/02/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2460 1. Truss T14 missing one of two meta anchors at the rear wall. 2. Truss EJ7 left wall at the left side of bath window. Meta strap, missed nailing. Check for corrections at all rough. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/28/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Truss T14 missing one of two meta anchors at the rear wall. 2. Truss EJ7 left wall at the left side of bath window. Meta strap, missed nailing. Check for corrections at all rough. | |||
| WALL SHEATHING | 12/28/2023 | Disapproved - NO FEE | JWALKER |
| Note: Sheating above garage opening at the gable missing nailing. | |||
| TIE BEAM / LINTEL | 12/12/2023 | APPROVED | JWALKER |
| ROW - DRAINAGE | 12/12/2023 | APPROVED | TPOLACEK |
| Note: 12/12/23 CORRECTIONS MADE 12/6/2023 - PREVIOUS INSPECTION NOTES 12/6/23=they are working on the site at the time of the inspection, builder request a couple more they to install the culvert pipe. inspector be back on site 12/12/23 12/5/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) THE SILT FENCE IS INSTALLED INCORRECTLY NEED TO TRENCH AND BURY TO THE PICK LINE AT THE BOTTOM SO SILT FENCE DOESN'T FAIL 3) ALSO YOU NEED TO INSTALL SILT FENCE ACROSSED THE RIGHT OF WAY LINE AND PUT AN ENTRENCE TO YOUR CONSTRUCTION SITE 4) YOU NEED TO CLEAN ALL DIRT OFF OF ROADWAY THIS IS A HAZARD TO MOTORIST 5) NOW WITH ALL THE TRAFFIC GOING IN AND OUT YOU WILL NEED TO PUT A TEMP. CULVERT SO THE ROADSIDE SWALE WILL STAY OPEN 6) NOW THE BLOCK INSTALLERS HAVE WASHED ALL MOTAR IN THE ROADSIDE SWALE. THIS IS AN ILLICIT DISCHARGE. YOU WILL NEED TO HAVE A WASH OUT STATION WITH PLASTIC LINED ON SITE SO ALL PAINTS AND ALL OTHER PRODUCTS CAN BE WASHED IN IT. SO NO PRODUCTS WILL ENTER INTO THE CITY'S DRAINAGE SYSTEM. NEXT TIME THERE WILL BE CODE ENFORCEMENT INVOLVED AND EPA WILL BE CONTACTED FOR A VIOLATIONS. THIS IS NOT THE FIRST TIME AT THIS SITE. --------------------------------------------------------------------------------------- 12/4/2023 - PREVIOUS INSPECTION NOTES NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/11/2023 | APPROVED | BBEMBRY |
| ROW - DRAINAGE | 12/06/2023 | Disapproved - NO FEE | GBERTOLA |
| Note: 12/6/23=they are working on the site at the time of the inspection, builder request a couple more they to install the culvert pipe. inspector be back on site 12/12/23 12/5/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) THE SILT FENCE IS INSTALLED INCORRECTLY NEED TO TRENCH AND BURY TO THE PICK LINE AT THE BOTTOM SO SILT FENCE DOESN'T FAIL 3) ALSO YOU NEED TO INSTALL SILT FENCE ACROSSED THE RIGHT OF WAY LINE AND PUT AN ENTRENCE TO YOUR CONSTRUCTION SITE 4) YOU NEED TO CLEAN ALL DIRT OFF OF ROADWAY THIS IS A HAZARD TO MOTORIST 5) NOW WITH ALL THE TRAFFIC GOING IN AND OUT YOU WILL NEED TO PUT A TEMP. CULVERT SO THE ROADSIDE SWALE WILL STAY OPEN 6) NOW THE BLOCK INSTALLERS HAVE WASHED ALL MOTAR IN THE ROADSIDE SWALE. THIS IS AN ILLICIT DISCHARGE. YOU WILL NEED TO HAVE A WASH OUT STATION WITH PLASTIC LINED ON SITE SO ALL PAINTS AND ALL OTHER PRODUCTS CAN BE WASHED IN IT. SO NO PRODUCTS WILL ENTER INTO THE CITY'S DRAINAGE SYSTEM. NEXT TIME THERE WILL BE CODE ENFORCEMENT INVOLVED AND EPA WILL BE CONTACTED FOR A VIOLATIONS. THIS IS NOT THE FIRST TIME AT THIS SITE. --------------------------------------------------------------------------------------- 12/4/2023 - PREVIOUS INSPECTION NOTES NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| ROW - DRAINAGE | 12/05/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) THE SILT FENCE IS INSTALLED INCORRECTLY NEED TO TRENCH AND BURY TO THE PICK LINE AT THE BOTTOM SO SILT FENCE DOESN'T FAIL 3) ALSO YOU NEED TO INSTALL SILT FENCE ACROSSED THE RIGHT OF WAY LINE AND PUT AN ENTRENCE TO YOUR CONSTRUCTION SITE 4) YOU NEED TO CLEAN ALL DIRT OFF OF ROADWAY THIS IS A HAZARD TO MOTORIST 5) NOW WITH ALL THE TRAFFIC GOING IN AND OUT YOU WILL NEED TO PUT A TEMP. CULVERT SO THE ROADSIDE SWALE WILL STAY OPEN 6) NOW THE BLOCK INSTALLERS HAVE WASHED ALL MOTAR IN THE ROADSIDE SWALE. THIS IS AN ILLICIT DISCHARGE. YOU WILL NEED TO HAVE A WASH OUT STATION WITH PLASTIC LINED ON SITE SO ALL PAINTS AND ALL OTHER PRODUCTS CAN BE WASHED IN IT. SO NO PRODUCTS WILL ENTER INTO THE CITY'S DRAINAGE SYSTEM. NEXT TIME THERE WILL BE CODE ENFORCEMENT INVOLVED AND EPA WILL BE CONTACTED FOR A VIOLATIONS. THIS IS NOT THE FIRST TIME AT THIS SITE. --------------------------------------------------------------------------------------- 12/4/2023 - PREVIOUS INSPECTION NOTES NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| ROW - DRAINAGE | 12/04/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| ROW - DRAINAGE | 12/01/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| ROW - DRAINAGE | 11/30/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| ROW - DRAINAGE | 11/29/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTIONS UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| MONOLITHIC SLAB | 11/27/2023 | APPROVED | JWALKER |
| Note: 11/22/2023 - PREVIOUS INSPECTION NOTES 11/22/23 1. Failed 5' head pressure test 2. Water presure guage does not read 50 lbs. 11/20/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. 11-20-23 1.Heavy rains have caused soil to washout, covering the rebar in the footings. | |||
| MONOLITHIC SLAB | 11/22/2023 | Disapproved -FEE REQUIRED | MKRASKI |
| Note: 11/22/23 1. Failed 5' head pressure test 2. Water presure guage does not read 50 lbs. 11/20/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. 11-20-23 1.Heavy rains have caused soil to washout, covering the rebar in the footings. | |||
| ROW - DRAINAGE | 11/22/2023 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23 | |||
| MONOLITHIC SLAB | 11/20/2023 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. 11-20-23 1.Heavy rains have caused soil to washout, covering the rebar in the footings. | |||
| MONOLITHIC SLAB | 11/17/2023 | Disapproved - NO FEE | JWALKER |
| Note: 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. | |||
| MONOLITHIC SLAB | 11/15/2023 | Disapproved - NO FEE | JWALKER |
| Note: Slab needs to be tamped down due to soil overthown during plumbing pipe install. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/13/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 09/01/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/08/2023 | 12/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/08/2023 | 12/08/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 07/18/2023 | 07/24/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/11/2023 | 07/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| CUSVC | HOLD | 07/11/2023 | 07/11/2023 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Please correct utility application to reflect the correct parcel number | |||
| ELEC | COMPLETE | 07/11/2023 | 07/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/11/2023 | 07/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/11/2023 | 07/12/2023 |
| LOCATE | COMPLETE | 07/11/2023 | 07/13/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/11/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/11/2023 | 07/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/11/2023 | 07/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/11/2023 | 08/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/10/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 05/10/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/25/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/25/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/25/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/25/2023 |
| SEWER CREDIT | (¤2,465.75) | 07/25/2023 |
| SEWER INSPECTION | ¤25.00 | 07/25/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/25/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/25/2023 |
| SITE PLAN 30 | ¤30.00 | 07/25/2023 |
| CONNECTION FEES | ¤1,166.26 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/25/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/25/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/25/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/25/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/25/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/25/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/25/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/25/2023 |
| SURCHARGE FS 533.721 | ¤5.71 | 07/25/2023 |
| SURCHARGE - FS 468.631 | ¤8.57 | 07/25/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/25/2023 |
| WATER- TURN ON | ¤25.00 | 07/25/2023 |
| ADJUSTMENT 50% | (¤570.98) | 07/25/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/25/2023 |
| INSPECTION - RESIDENTIAL | ¤866.25 | 07/25/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤245.70 | 07/25/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,289.13 |