Permit #2023070384

Permit Details

Status: COED

Parcel Id: 07-11-31-7033-00350-0130
CONDITIONED SPACE: 2208 sqft
GARAGE: 438 sqft
OPENED PORCH (WITH ROOF) : 197 sqft
Total Square Footage: 2843 sqft
Block: 00350
Subdivision: 2184 - SECTION 33-ROYAL PALMS
Job Phone: 386-445-9009
Location Address: 4 RED BIRCH LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/25/2023
NOC: RECORDED
Applicant name: BRIAN ANDREW GAZZOLI
Owner: SEAGATE HOMES LLC

Address

185 CYPRESS POINT PKWY STE 7

PALM COAST, FL 32164

Lot: 0130
Contracted Stated Job Value: ¤315,000.00
Job Description: Single Family Residence
Type: CN

Contractor

SEAGATE HOMES, LLC
Status Location Address Mailing Address State License Number Phone
ACTIVE

185 CYPRESS POINT PARKWAY

Palm Coast, FL 32137

SUITE 7

Palm Coast, FL 32137

CGC1518372 (Exp: 08/31/2026) 386-246-6132

Sub Contractors

RICHARD H SIMMONS JR
Status Location Address State License Number Phone Fax
ACTIVE

PO BOX 1963

BUNNELL, FL 32110

ES12001217 (Exp: 08/31/2026) 386-437-0607 386-437-1847
TIMUR ISPARYAN
Status Location Address State License Number Phone Fax
ACTIVE

3665 SPRINK PARK ROAD

JACKSONVILLE , FL 32207

CMC1249968 (Exp: 08/31/2026) 904-245-1818 904-337-1910
CHAD DAVID GRESSANI
Status Location Address State License Number Phone Fax
ACTIVE

2640 BROOKSHIRE CIRCLE

MELBOURNE, FL 32904

CCC1327235 (Exp: 08/31/2026) 321-288-6415 321-729-8997
GLEN WILLIAM KEHLE
Status Location Address State License Number Phone Fax
ACTIVE

P. O. Box 353511

BUNNELL, FL 32110

CFC057241 (Exp: 08/31/2026) (386) 447-4249 (386) 437-8488

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/10/2024 FINAL APPROVED AGAETANO
Note: 5/9/2024 - PREVIOUS INSPECTION NOTES 05-09-2024 Job Johnny on site.
BLD - BUILDING FINAL 05/09/2024 Disapproved - NO FEE AGAETANO
Note: 05-09-2024 Job Johnny on site.
U-CROSS CONNECTION 05/09/2024 APPROVED - AS NOTED LFITZGERALD
Note: *** NOTES ADDED BY LFITZGERALD 5/9/2024 10:59:33 AM *** has potable irr with PVB-no cross connection
U -UTILITY RESIDENTIAL FINAL 05/09/2024 FINAL APPROVED LFITZGERALD
ROW - STORMWATER FINAL 05/03/2024 APPROVED GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:19:36 AM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR rjg. NOTE TO INSPECTOR: Nieghbor at 6 very worried about the drainage from this new home. Please double check that there is a clearly defined swale and no stormwater will drain onto her lot.
ROW - FINAL APRON (AFTER POUR) 05/03/2024 APPROVED GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:19:05 AM *** AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR
ROW- FINAL SURVEY/GRADING CERTIFICATION 05/03/2024 APPROVED GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:17:54 AM *** The back slope of the property is steep because of a crest that blocks water from flowing in the opposite direction. As a result, the sides of the property's house have elevated areas. However, if we construct a common swale, the water will flow back. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 4/30/2024 - PREVIOUS INSPECTION NOTES 04/30/24 The site plan indicates a common swale on both sides of the property. the survey shows an inside swale. The site plan indicates an elevation of 29.40 proposed at back berm and final survey shows 30.50. this is over the .40 allowed deviation. the right side of struction has 2 numbers that are off from the rest of the struture. 28.80 & 28.70. You will need to regrade both sides and back to conform to the site plan that was submitted and approved. Inspector Notes from Inspection 9270 ** 04/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW FIELD SURVEY /GRADING CERTIFICATION 05/03/2024 APPROVED GBERTOLA
Note: *** NOTES ADDED BY GBERTOLA 5/3/2024 10:18:39 AM *** The back slope of the property is steep because of a crest that blocks water from flowing in the opposite direction. As a result, the sides of the property's house have elevated areas. However, if we construct a common swale, the water will flow back. AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR NOTE TO INSPECTOR : THIS CONSTRUCTION SITE NEEDS TO MATCH THE SITE PLAN FOR THERE DRAINAGE PLAN AS COMMON SWALES WHERE THERE ELEVATIONS ARE LOWER THAN ADJOINING LOTS SO THERE SWALE WILL MOVE ALL WATER FROM THE BACK TO FRONT. THE HIGH POINT NEEDS TO BE A MINIMUM OF .50 LOWER THE FINISH GRADE OUTSIDE THE HOUSE SO NO WATER WILL IMPACT THE ADJOINING LOTS TO THE RIGHT OR LEFT. ---------------------------------------------------------------------------------------------------- ENSURE THAT WATER DOES NOT AFFECT THE NEIGHBORS ON THE LEFT SIDE OF THE HOUSE..per Rgross and gbertola
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/30/2024 Disapproved - NO FEE TPOLACEK
Note: 04/30/24 The site plan indicates a common swale on both sides of the property. the survey shows an inside swale. The site plan indicates an elevation of 29.40 proposed at back berm and final survey shows 30.50. this is over the .40 allowed deviation. the right side of structure has 2 numbers that are off from the rest of the structure. 28.80 & 28.70. You will need to regrade both sides and back to conform to the site plan that was submitted and approved. Inspector Notes from Inspection 9270 ** 04/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW - DRAINAGE 04/12/2024 APPROVED - AS NOTED EMADISON
Note: ** 04/12/24 THERE IS NO STANDING WATER RESIDENT AT 6 RED BIRCH LN SHOWED PHOTOS OF DRAINAGE CONVEYANCE BETWEEN # 6 AND # 4 HAD FLOWING WATER FROM REAR TO FRONT THERE IS NO STANDING WATER THE GROUND IS NOT MUDDY OR SOFT ** NO ISSUES NOTED AT THE TIME OF THIS INSPECTION WHEN FINAL SURVEY IS SUBMITTED INSPECTOR NEEDS TO CHECK THE ELEVATION OF PROPOSED SITE PLAN AND FINAL SURVEY CITIZEN AT 6 RED BIRCH SAYS THE BACKYARD IS TOO HIGH. PLEASE INSPECT. MH
ROW- PRE-APRON (PRE-POUR) 04/02/2024 APPROVED - AS NOTED EMADISON
Note: ** 04/02/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
ROW - DRAINAGE 03/27/2024 APPROVED - AS NOTED PFLANAGAN
Note: THIS IS STILL IN THE PROCESS OF DOING THE FINAL GRADE AT THIS TIME. WILL NOT KNOW IF THE BERM IS TO HIGH WITH OUT A FINAL SURVEY THAT SHOWS THE ELEVATION OF THE BERM. I AM PUTTING NOTES IN THE FINAL SURVEY AND THE FIELD INSPECTION THAT THIS CONSTRUCTION SITE NEEDS TO MATCH THE SITE PLAN FOR THERE DRAINAGE PLAN AS COMMON SWALE WHERE THERE ELEVATIONS ARE LOWER THAN ADJOINING LOTS. AND THEY NEED TO START THERE HIGH POINT .50 LOWER THE FINISH GRADE OUTSIDE THE HOUSE SO NO WATER WILL IMPACT THE ADJOINING LOTS TO THE RIGHT OR LEFT. --------------------------------------------------------------------------------------------------- CITIZEN AT 4 SAYS THEY HAVE ADDED MORE FILL DIRT AND THE BACKYARD IS TOO HIGH PLS INSPECT MH
ELECTRIC - EARLY POWER 03/20/2024 APPROVED RMARTIN
GRAVITY SEWER TEST 02/08/2024 APPROVED MGIBSON
U - SEWER TIE IN 02/08/2024 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 02/02/2024 APPROVED BVITALE
LATH/BRICK/ WATER BARRIER 01/26/2024 APPROVED JWALKER
INSULATION 01/24/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2420 Dryer exhaust duct has not been completed. Check for correction at insulation.
ALL ROUGH 01/18/2024 APPROVED - AS NOTED JWALKER
Note: Dryer exhaust duct has not been completed. Check for correction at insulation.
ROOF VALLEY & METAL 01/10/2024 APPROVED JWALKER
WALL SHEATHING 01/02/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2460 1. Truss T14 missing one of two meta anchors at the rear wall. 2. Truss EJ7 left wall at the left side of bath window. Meta strap, missed nailing. Check for corrections at all rough.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/28/2023 APPROVED - AS NOTED JWALKER
Note: 1. Truss T14 missing one of two meta anchors at the rear wall. 2. Truss EJ7 left wall at the left side of bath window. Meta strap, missed nailing. Check for corrections at all rough.
WALL SHEATHING 12/28/2023 Disapproved - NO FEE JWALKER
Note: Sheating above garage opening at the gable missing nailing.
TIE BEAM / LINTEL 12/12/2023 APPROVED JWALKER
ROW - DRAINAGE 12/12/2023 APPROVED TPOLACEK
Note: 12/12/23 CORRECTIONS MADE 12/6/2023 - PREVIOUS INSPECTION NOTES 12/6/23=they are working on the site at the time of the inspection, builder request a couple more they to install the culvert pipe. inspector be back on site 12/12/23 12/5/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) THE SILT FENCE IS INSTALLED INCORRECTLY NEED TO TRENCH AND BURY TO THE PICK LINE AT THE BOTTOM SO SILT FENCE DOESN'T FAIL 3) ALSO YOU NEED TO INSTALL SILT FENCE ACROSSED THE RIGHT OF WAY LINE AND PUT AN ENTRENCE TO YOUR CONSTRUCTION SITE 4) YOU NEED TO CLEAN ALL DIRT OFF OF ROADWAY THIS IS A HAZARD TO MOTORIST 5) NOW WITH ALL THE TRAFFIC GOING IN AND OUT YOU WILL NEED TO PUT A TEMP. CULVERT SO THE ROADSIDE SWALE WILL STAY OPEN 6) NOW THE BLOCK INSTALLERS HAVE WASHED ALL MOTAR IN THE ROADSIDE SWALE. THIS IS AN ILLICIT DISCHARGE. YOU WILL NEED TO HAVE A WASH OUT STATION WITH PLASTIC LINED ON SITE SO ALL PAINTS AND ALL OTHER PRODUCTS CAN BE WASHED IN IT. SO NO PRODUCTS WILL ENTER INTO THE CITY'S DRAINAGE SYSTEM. NEXT TIME THERE WILL BE CODE ENFORCEMENT INVOLVED AND EPA WILL BE CONTACTED FOR A VIOLATIONS. THIS IS NOT THE FIRST TIME AT THIS SITE. --------------------------------------------------------------------------------------- 12/4/2023 - PREVIOUS INSPECTION NOTES NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
FOUND SURVEY APPROVED (OFFICE) 12/11/2023 APPROVED BBEMBRY
ROW - DRAINAGE 12/06/2023 Disapproved - NO FEE GBERTOLA
Note: 12/6/23=they are working on the site at the time of the inspection, builder request a couple more they to install the culvert pipe. inspector be back on site 12/12/23 12/5/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) THE SILT FENCE IS INSTALLED INCORRECTLY NEED TO TRENCH AND BURY TO THE PICK LINE AT THE BOTTOM SO SILT FENCE DOESN'T FAIL 3) ALSO YOU NEED TO INSTALL SILT FENCE ACROSSED THE RIGHT OF WAY LINE AND PUT AN ENTRENCE TO YOUR CONSTRUCTION SITE 4) YOU NEED TO CLEAN ALL DIRT OFF OF ROADWAY THIS IS A HAZARD TO MOTORIST 5) NOW WITH ALL THE TRAFFIC GOING IN AND OUT YOU WILL NEED TO PUT A TEMP. CULVERT SO THE ROADSIDE SWALE WILL STAY OPEN 6) NOW THE BLOCK INSTALLERS HAVE WASHED ALL MOTAR IN THE ROADSIDE SWALE. THIS IS AN ILLICIT DISCHARGE. YOU WILL NEED TO HAVE A WASH OUT STATION WITH PLASTIC LINED ON SITE SO ALL PAINTS AND ALL OTHER PRODUCTS CAN BE WASHED IN IT. SO NO PRODUCTS WILL ENTER INTO THE CITY'S DRAINAGE SYSTEM. NEXT TIME THERE WILL BE CODE ENFORCEMENT INVOLVED AND EPA WILL BE CONTACTED FOR A VIOLATIONS. THIS IS NOT THE FIRST TIME AT THIS SITE. --------------------------------------------------------------------------------------- 12/4/2023 - PREVIOUS INSPECTION NOTES NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
ROW - DRAINAGE 12/05/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) THE SILT FENCE IS INSTALLED INCORRECTLY NEED TO TRENCH AND BURY TO THE PICK LINE AT THE BOTTOM SO SILT FENCE DOESN'T FAIL 3) ALSO YOU NEED TO INSTALL SILT FENCE ACROSSED THE RIGHT OF WAY LINE AND PUT AN ENTRENCE TO YOUR CONSTRUCTION SITE 4) YOU NEED TO CLEAN ALL DIRT OFF OF ROADWAY THIS IS A HAZARD TO MOTORIST 5) NOW WITH ALL THE TRAFFIC GOING IN AND OUT YOU WILL NEED TO PUT A TEMP. CULVERT SO THE ROADSIDE SWALE WILL STAY OPEN 6) NOW THE BLOCK INSTALLERS HAVE WASHED ALL MOTAR IN THE ROADSIDE SWALE. THIS IS AN ILLICIT DISCHARGE. YOU WILL NEED TO HAVE A WASH OUT STATION WITH PLASTIC LINED ON SITE SO ALL PAINTS AND ALL OTHER PRODUCTS CAN BE WASHED IN IT. SO NO PRODUCTS WILL ENTER INTO THE CITY'S DRAINAGE SYSTEM. NEXT TIME THERE WILL BE CODE ENFORCEMENT INVOLVED AND EPA WILL BE CONTACTED FOR A VIOLATIONS. THIS IS NOT THE FIRST TIME AT THIS SITE. --------------------------------------------------------------------------------------- 12/4/2023 - PREVIOUS INSPECTION NOTES NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
ROW - DRAINAGE 12/04/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NO CHANGES SINCE THE LAST INSPECTION ALL BELOW NEED STILL BE ADDRESSED 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------- 12/1/2023 - PREVIOUS INSPECTION NOTES 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
ROW - DRAINAGE 12/01/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) STILL NEED TO REMOVE THE PORTER JOHN OUT OF THE RIGHT OF WAY AND PUT IT ON YOUR LOT 2) NEED TO STILL INSTALL SILT FENCE AROUND THE ENTIRE PROPERTY AND ALONG THE RIGHT OF WAY LINE WITH AND ENTRANCE TO YOUR LOT ---------------------------------------------------------------------------------- 11/30/2023 - PREVIOUS INSPECTION NOTES NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
ROW - DRAINAGE 11/30/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: NO CHANGES AT THIS TIME 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES --------------------------------------------------------------------------------------- 11/29/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTION HOLD UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
ROW - DRAINAGE 11/29/2023 Disapproved -FEE REQUIRED PFLANAGAN
Note: 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site 4) NEED TO CLEAN ALL CONCRETE OUT OF OUR SWALE SYSTEM THIS IS AN ILLICIT DISCHARGE SINCE THIS HAS OCCURED THIS SITE WILL BE ON INSPECTIONS UNTILL ALL CORRECTION ARE MADE LISTED THERE WILL BE AN INSPECTION EVERY DAY ENTILL CORRECTIONS MADE IF ALL ARE NOT DONE YOU WILL HAVE FEES ------------------------------------------------------------------------------------------------------------------------- 11/22/2023 - PREVIOUS INSPECTION NOTES 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
MONOLITHIC SLAB 11/27/2023 APPROVED JWALKER
Note: 11/22/2023 - PREVIOUS INSPECTION NOTES 11/22/23 1. Failed 5' head pressure test 2. Water presure guage does not read 50 lbs. 11/20/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. 11-20-23 1.Heavy rains have caused soil to washout, covering the rebar in the footings.
MONOLITHIC SLAB 11/22/2023 Disapproved -FEE REQUIRED MKRASKI
Note: 11/22/23 1. Failed 5' head pressure test 2. Water presure guage does not read 50 lbs. 11/20/2023 - PREVIOUS INSPECTION NOTES 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. 11-20-23 1.Heavy rains have caused soil to washout, covering the rebar in the footings.
ROW - DRAINAGE 11/22/2023 Disapproved - NO FEE PFLANAGAN
Note: 1) Need to remove porta potty out of ROW into construction site 2) Need to keep swale open at all times during construction or put in temp culvert to allow water to flow 3)Need to install silt fence around entire perimeter and ROW line and leave enterance to construction site You have 7 business days to comply with all standards or there will be an inspection hold on permit next inspection on 11/29/23
MONOLITHIC SLAB 11/20/2023 Disapproved -FEE REQUIRED BTAYLOR
Note: 11/17/2023 - PREVIOUS INSPECTION NOTES 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install. 11-20-23 1.Heavy rains have caused soil to washout, covering the rebar in the footings.
MONOLITHIC SLAB 11/17/2023 Disapproved - NO FEE JWALKER
Note: 11/17/23 Heavy rains have caused soil to washout, covering the rebar in the footings. 11/15/2023 - PREVIOUS INSPECTION NOTES Slab needs to be tamped down due to soil overthown during plumbing pipe install.
MONOLITHIC SLAB 11/15/2023 Disapproved - NO FEE JWALKER
Note: Slab needs to be tamped down due to soil overthown during plumbing pipe install.
PLUMBING 1ST ROUGH UNDERGROUND 11/13/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 09/01/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 12/08/2023 12/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/08/2023 12/08/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
CUSVC COMPLETE 07/18/2023 07/24/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
BLD COMPLETE 07/11/2023 07/17/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC HOLD 07/11/2023 07/11/2023
Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Please correct utility application to reflect the correct parcel number
ELEC COMPLETE 07/11/2023 07/13/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/11/2023 07/11/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/11/2023 07/12/2023
LOCATE COMPLETE 07/11/2023 07/13/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/11/2023 07/12/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/11/2023 07/18/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON COMPLETE 07/11/2023 07/12/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
SWALE COMPLETE 07/11/2023 08/17/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 05/10/2024
REINSPECTION RESIDENTIAL ¤40.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG - INSPECTION 20 ¤20.00 05/10/2024
SW ENG INSPECTION 80 ¤80.00 07/25/2023
SW ENG PRE APRON ¤30.00 07/25/2023
SW ENG - REVIEW 20 ¤20.00 07/25/2023
SW ENG RES REVIEW 200 ¤200.00 07/25/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/25/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/25/2023
SEWER CREDIT (¤2,465.75) 07/25/2023
SEWER INSPECTION ¤25.00 07/25/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/25/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/25/2023
SITE PLAN 30 ¤30.00 07/25/2023
CONNECTION FEES ¤1,166.26 07/25/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/25/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/25/2023
FC IMPACT FEE EMS ¤62.00 07/25/2023
IMPACT FEE FIRE ¤420.52 07/25/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/25/2023
FC IMPACT FEE LIBRARY ¤268.00 07/25/2023
IMPACT FEE PARKS ¤1,769.15 07/25/2023
IMPACT FEE SCHOOL ¤5,450.00 07/25/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 07/25/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/25/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/25/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/25/2023
SURCHARGE FS 533.721 ¤5.71 07/25/2023
SURCHARGE - FS 468.631 ¤8.57 07/25/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/25/2023
WATER- TURN ON ¤25.00 07/25/2023
ADJUSTMENT 50% (¤570.98) 07/25/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/25/2023
INSPECTION - RESIDENTIAL ¤866.25 07/25/2023
PLAN REVIEW - RESIDENTIAL ¤245.70 07/25/2023
Fees Total Due: ¤0.00 Total Paid: ¤19,289.13