I want to search for...
Permit #2023070385
Permit Details
Status: COED
| Parcel Id: 07-11-31-7028-00210-0060 |
| CONDITIONED SPACE: 1243 sqft |
| GARAGE: 425 sqft |
| OPENED PORCH (WITH ROOF) : 31 sqft |
| Total Square Footage: 1699 sqft |
| Block: 00210 |
| Subdivision: 2199 - SECTION 28-WYNNFIELD |
| Job Phone: 202-494-2019 |
| Location Address: 18 POTOMAC DR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/01/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤125,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 02/06/2024 | FINAL APPROVED | RSIMS |
| ROW - STORMWATER FINAL | 02/02/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/2/24 BERM ADJOINING LEFT SIDE PROPERTY IS ACCEPTABLE AT THE TIME OF THIS INSPECTION. CORRECTION COMPLETED. PASSING THIS AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 2/1/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/31/24 SPOKE WITH CM BILL AND LET HIM KNOW THAT THE BERM THEY PUT ON THE LEFT SIDE PROPERTY LINEWILL NEED TO BE BUILT UP HIGHER TO KEEP FROM NEGATIVELY AFFECTING THE NEIGHBOR ON THE LEFT. AS A COURTESY I AM PASSING THIS FIELD SURVEY AS NOTED SO THEY CAN MOVE FORWARD WITH INSPECTIONS, BUT THIS ISSUE WILL HAVE TO BE CORRECTED BEFORE ANY ROW FINAL WILL BE PASSED. MEETING WITH BILL AND GRADE GUY TOMORROW TO RESOLVE THIS CORRECTION. 1/29/2024 - PREVIOUS INSPECTION NOTES UPON WALKING PROPERTY DETERMINED YOU ARE NEGATIVELY AFFECTING YOUR NEIGHBOR ON THE LEFT SIDE WITH YOUR RUN OFF. YOU WILL NEED TO BUILD A BERM/INSIDE SWALE TO KEEP THE WATER ON YOUR PROPERTY AND MOVING FROM REAR TO FRONT SWALE. Stormwater back to front cannot drain onto the adjacent lots Sec 300.03 C1b Sec 300.04 b3 Sec 300.03 C1b The rear yard is required to drain to the front roadside swale, unless the Lot Grading Plan demonstrates an approved rear yard drainage system into an appropriate water body or outfall. Flooding or draining onto adjacent properties will not be allowed. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 1/29/24 LEFT SIDE MAY BE AFFECTING NEIGHBOR, WILL INVESTIGATE ON FIELD SURVEY. APPOVING AS NOTED. Inspector Notes from Inspection 9270 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| U -UTILITY RESIDENTIAL FINAL | 02/01/2024 | FINAL APPROVED | LFITZGERALD |
| Note: Inspector Notes from Inspection 9035 no irr-no cross connection | |||
| ROW - STORMWATER FINAL | 02/01/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: Inspector Notes from Inspection 9465 1/31/24 SPOKE WITH CM BILL AND LET HIM KNOW THAT THE BERM THEY PUT ON THE LEFT SIDE PROPERTY LINEWILL NEED TO BE BUILT UP HIGHER TO KEEP FROM NEGATIVELY AFFECTING THE NEIGHBOR ON THE LEFT. AS A COURTESY I AM PASSING THIS FIELD SURVEY AS NOTED SO THEY CAN MOVE FORWARD WITH INSPECTIONS, BUT THIS ISSUE WILL HAVE TO BE CORRECTED BEFORE ANY ROW FINAL WILL BE PASSED. MEETING WITH BILL AND GRADE GUY TOMORROW TO RESOLVE THIS CORRECTION. 1/29/2024 - PREVIOUS INSPECTION NOTES UPON WALKING PROPERTY DETERMINED YOU ARE NEGATIVELY AFFECTING YOUR NEIGHBOR ON THE LEFT SIDE WITH YOUR RUN OFF. YOU WILL NEED TO BUILD A BERM/INSIDE SWALE TO KEEP THE WATER ON YOUR PROPERTY AND MOVING FROM REAR TO FRONT SWALE. Stormwater back to front cannot drain onto the adjacent lots Sec 300.03 C1b Sec 300.04 b3 Sec 300.03 C1b The rear yard is required to drain to the front roadside swale, unless the Lot Grading Plan demonstrates an approved rear yard drainage system into an appropriate water body or outfall. Flooding or draining onto adjacent properties will not be allowed. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 1/29/24 LEFT SIDE MAY BE AFFECTING NEIGHBOR, WILL INVESTIGATE ON FIELD SURVEY. APPOVING AS NOTED. Inspector Notes from Inspection 9270 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| ROW - FINAL APRON (AFTER POUR) | 02/01/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/1/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 1/31/24 SPOKE WITH CM BILL AND LET HIM KNOW THAT THE BERM THEY PUT ON THE LEFT SIDE PROPERTY LINEWILL NEED TO BE BUILT UP HIGHER TO KEEP FROM NEGATIVELY AFFECTING THE NEIGHBOR ON THE LEFT. AS A COURTESY I AM PASSING THIS FIELD SURVEY AS NOTED SO THEY CAN MOVE FORWARD WITH INSPECTIONS, BUT THIS ISSUE WILL HAVE TO BE CORRECTED BEFORE ANY ROW FINAL WILL BE PASSED. MEETING WITH BILL AND GRADE GUY TOMORROW TO RESOLVE THIS CORRECTION. 1/29/2024 - PREVIOUS INSPECTION NOTES UPON WALKING PROPERTY DETERMINED YOU ARE NEGATIVELY AFFECTING YOUR NEIGHBOR ON THE LEFT SIDE WITH YOUR RUN OFF. YOU WILL NEED TO BUILD A BERM/INSIDE SWALE TO KEEP THE WATER ON YOUR PROPERTY AND MOVING FROM REAR TO FRONT SWALE. Stormwater back to front cannot drain onto the adjacent lots Sec 300.03 C1b Sec 300.04 b3 Sec 300.03 C1b The rear yard is required to drain to the front roadside swale, unless the Lot Grading Plan demonstrates an approved rear yard drainage system into an appropriate water body or outfall. Flooding or draining onto adjacent properties will not be allowed. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 1/29/24 LEFT SIDE MAY BE AFFECTING NEIGHBOR, WILL INVESTIGATE ON FIELD SURVEY. APPOVING AS NOTED. Inspector Notes from Inspection 9270 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/31/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/31/24 SPOKE WITH CM BILL AND LET HIM KNOW THAT THE BERM THEY PUT ON THE LEFT SIDE PROPERTY LINEWILL NEED TO BE BUILT UP HIGHER TO KEEP FROM NEGATIVELY AFFECTING THE NEIGHBOR ON THE LEFT. AS A COURTESY I AM PASSING THIS FIELD SURVEY AS NOTED SO THEY CAN MOVE FORWARD WITH INSPECTIONS, BUT THIS ISSUE WILL HAVE TO BE CORRECTED BEFORE ANY ROW FINAL WILL BE PASSED. MEETING WITH BILL AND GRADE GUY TOMORROW TO RESOLVE THIS CORRECTION. 1/29/2024 - PREVIOUS INSPECTION NOTES UPON WALKING PROPERTY DETERMINED YOU ARE NEGATIVELY AFFECTING YOUR NEIGHBOR ON THE LEFT SIDE WITH YOUR RUN OFF. YOU WILL NEED TO BUILD A BERM/INSIDE SWALE TO KEEP THE WATER ON YOUR PROPERTY AND MOVING FROM REAR TO FRONT SWALE. Stormwater back to front cannot drain onto the adjacent lots Sec 300.03 C1b Sec 300.04 b3 Sec 300.03 C1b The rear yard is required to drain to the front roadside swale, unless the Lot Grading Plan demonstrates an approved rear yard drainage system into an appropriate water body or outfall. Flooding or draining onto adjacent properties will not be allowed. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 1/29/24 LEFT SIDE MAY BE AFFECTING NEIGHBOR, WILL INVESTIGATE ON FIELD SURVEY. APPOVING AS NOTED. Inspector Notes from Inspection 9270 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 01/29/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/29/24 LEFT SIDE MAY BE AFFECTING NEIGHBOR, WILL INVESTIGATE ON FIELD SURVEY. APPOVING AS NOTED. Inspector Notes from Inspection 9270 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 01/29/2024 | Disapproved - NO FEE | FSLADISH |
| Note: UPON WALKING PROPERTY DETERMINED YOU ARE NEGATIVELY AFFECTING YOUR NEIGHBOR ON THE LEFT SIDE WITH YOUR RUN OFF. YOU WILL NEED TO BUILD A BERM/INSIDE SWALE TO KEEP THE WATER ON YOUR PROPERTY AND MOVING FROM REAR TO FRONT SWALE. Stormwater back to front cannot drain onto the adjacent lots Sec 300.03 C1b Sec 300.04 b3 Sec 300.03 C1b The rear yard is required to drain to the front roadside swale, unless the Lot Grading Plan demonstrates an approved rear yard drainage system into an appropriate water body or outfall. Flooding or draining onto adjacent properties will not be allowed. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 1/29/24 LEFT SIDE MAY BE AFFECTING NEIGHBOR, WILL INVESTIGATE ON FIELD SURVEY. APPOVING AS NOTED. Inspector Notes from Inspection 9270 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| U-CROSS CONNECTION | 01/22/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no cross connection | |||
| ELECTRIC - EARLY POWER | 01/16/2024 | APPROVED | RMARTIN |
| Note: 1/9/2024 - PREVIOUS INSPECTION NOTES 1/9/24: NO DUMPSTER ON SITE! YOU WILL NEED TO CLEAN UP ALL OF THE LOOSE TRASH & DEBRIS BLOWING INTO THE SWALE AND NEIGHBORING PROPERTIES. 1). Service feeds cannot be landed at Meter Panel for underground power prior to this 2190 EP Inspection. Previously noted. 1/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Emailed FPL @ 1416. Release Power 1-8-24 1. House is hot. | |||
| ELECTRIC - EARLY POWER | 01/09/2024 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 1/9/24: NO DUMPSTER ON SITE! YOU WILL NEED TO CLEAN UP ALL OF THE LOOSE TRASH & DEBRIS BLOWING INTO THE SWALE AND NEIGHBORING PROPERTIES. 1). Service feeds cannot be landed at Meter Panel for underground power prior to this 2190 EP Inspection. Previously noted. 1/8/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2200 Emailed FPL @ 1416. Release Power 1-8-24 1. House is hot. | |||
| ELECTRIC - EARLY POWER | 01/08/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2200 Emailed FPL @ 1416. Release Power 1-8-24 1. House is hot. | |||
| ROW- PRE-APRON (PRE-POUR) | 12/19/2023 | APPROVED - AS NOTED | TPOLACEK |
| Note: 12/19/23 READY TO POUR. CONTRACTOR ASSURED AT TIME OF INSPECTION ALL WATER WILL BE PUMPED BEFORE POURING. CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. 12/14/2023 - PREVIOUS INSPECTION NOTES 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| ROW- PRE-APRON (PRE-POUR) | 12/14/2023 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) THERE ARE AREAS IN THE POURING AREA THAT DON'T GIVE THE MINIMUM AMOUNT OF CONCRETE Sec.900.04A Driveway thickness on the right-of-way shall be either six inches (6") on firmly compacted subgrade of clean granular material. Sec 400.02 Sidewalks and driveways constructed within the City of Palm Coast shall be constructed with 3000 psi concrete and contain fiber or wire mesh. Sidewalk and driveways above the right of way shall be a minimum of 4" thick concrete. 2) NEED TO COMPACT ALL SOIL O THERE ARE NO HIGH SPOTS 3) NEED TO PUT DIRT ON OUT SIDE OF FORMS BOARDS SO CONCRETE WILL STAY IN POURING AREA | |||
| U - SEWER TIE IN | 12/08/2023 | APPROVED | MGIBSON |
| GRAVITY SEWER TEST | 12/08/2023 | APPROVED | MGIBSON |
| INSULATION | 11/28/2023 | APPROVED | KSANDOE |
| PEP TANK INSTALLATION REQUEST | 11/28/2023 | APPROVED | CBOWERMASTER |
| ALL ROUGH | 11/22/2023 | APPROVED | KSANDOE |
| Note: The conventional roof framing at front entry area. Install hold down straps at the ends of each jack rafter. See page S1.1 of the prints. Blocking will need to be installed between the trusses below to hold anchors, due to the rafters landing center of the trusses supported only by the osb. Check for correction at all rough inspection. | |||
| LATH/BRICK/ WATER BARRIER | 11/21/2023 | APPROVED | KSANDOE |
| ELECTRIC-TUG | 11/20/2023 | APPROVED - AS NOTED | KSANDOE |
| Note: Emailed FPL @ 1416. Release Power | |||
| ROOF VALLEY & METAL | 11/13/2023 | APPROVED | RSIMS |
| Note: Inspector Notes from Inspection 2460 1. Right side hip roof. Three of the vertically installed osb roof sheets have missed row of nailing. Check for correction at the roof valley metal inspection. 2. The conventional roof framing at front entry area. Install hold down straps at the ends of each jack rafter. See page S1.1 of the prints. Blocking will need to be installed between the trusses below to hold anchors, due to the rafters landing center of the trusses supported only by the osb. Check for correction at all rough inspection. | |||
| WALL SHEATHING | 11/07/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 11/07/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Right side hip roof. Three of the vertically installed osb roof sheets have missed row of nailing. Check for correction at the roof valley metal inspection. 2. The conventional roof framing at front entry area. Install hold down straps at the ends of each jack rafter. See page S1.1 of the prints. Blocking will need to be installed between the trusses below to hold anchors, due to the rafters landing center of the trusses supported only by the osb. Check for correction at all rough inspection. | |||
| TIE BEAM / LINTEL | 10/27/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 10/24/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 10/18/2023 | APPROVED | KSANDOE |
| Note: 10/17/2023 - PREVIOUS INSPECTION NOTES Minimum slab depth not met at in place string line. Foundation retaining walls for rear porch need to be in place. Nothing to hold in concrete 10/16/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 10/11/2023 - PREVIOUS INSPECTION NOTES 1. Compaction test not posted. 2. Termite cert or letter of intent to treat is not posted. 3. Full slab area needs to be tamped. 4. Rear porch slab area steel does not have 3" clearance from the ground. Stopped inspection. 10-16-23 1. Footers need to be dug out. | |||
| MONOLITHIC SLAB | 10/17/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Minimum slab depth not met at in place string line. Foundation retaining walls for rear porch need to be in place. Nothing to hold in concrete 10/16/2023 - PREVIOUS INSPECTION NOTES New inspection due to canceled inspection 10/11/2023 - PREVIOUS INSPECTION NOTES 1. Compaction test not posted. 2. Termite cert or letter of intent to treat is not posted. 3. Full slab area needs to be tamped. 4. Rear porch slab area steel does not have 3" clearance from the ground. Stopped inspection. 10-16-23 1. Footers need to be dug out. | |||
| MONOLITHIC SLAB | 10/16/2023 | Disapproved - NO FEE | BTAYLOR |
| Note: New inspection due to canceled inspection 10/11/2023 - PREVIOUS INSPECTION NOTES 1. Compaction test not posted. 2. Termite cert or letter of intent to treat is not posted. 3. Full slab area needs to be tamped. 4. Rear porch slab area steel does not have 3" clearance from the ground. Stopped inspection. 10-16-23 1. Footers need to be dug out. | |||
| MONOLITHIC SLAB | 10/12/2023 | CANCELLED BY APPLICANT | WEB |
| Note: 10/11/2023 - PREVIOUS INSPECTION NOTES 1. Compaction test not posted. 2. Termite cert or letter of intent to treat is not posted. 3. Full slab area needs to be tamped. 4. Rear porch slab area steel does not have 3" clearance from the ground. Stopped inspection. | |||
| MONOLITHIC SLAB | 10/11/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1. Compaction test not posted. 2. Termite cert or letter of intent to treat is not posted. 3. Full slab area needs to be tamped. 4. Rear porch slab area steel does not have 3" clearance from the ground. Stopped inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/04/2023 | APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 09/06/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 11/16/2023 | 11/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 11/15/2023 | 11/16/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide duct layout | |||
| MECH | COMPLETE | 11/09/2023 | 11/13/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/24/2023 | 10/24/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 10/12/2023 | 10/13/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey, Please submit foundation survey showing location, dimensions and elevation of finished foundation/slab. | |||
| ZON | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/20/2023 | 07/21/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/18/2023 | 07/18/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Legend at the top of the landscape isn't complete with your color coded circles | |||
| BLD | COMPLETE | 07/18/2023 | 07/19/2023 |
| Note: Released By: JPI | |||
| BLD | HOLD | 07/11/2023 | 07/16/2023 |
| Note: Held By: JPI 1. Product 25103.2 R1 has been applied for on the DBPR website but has not been approved. Please select a different product. | |||
| CUSVC | COMPLETE | 07/11/2023 | 07/11/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/11/2023 | 07/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/11/2023 | 07/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/11/2023 | 07/12/2023 |
| LOCATE | COMPLETE | 07/11/2023 | 07/13/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/11/2023 | 07/12/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/11/2023 | 07/18/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM PLEASE MAKE A COMMON SWALE ON BOTH RIGHT AND LEFT PROPERTY LINES | |||
| ZON | HOLD | 07/11/2023 | 07/12/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a landscape plan. One submitted is blank. | |||
| BADMIN | COMPLETE | 07/11/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/11/2023 | 08/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 02/05/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 02/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/05/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/05/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/05/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/01/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/01/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/01/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/01/2023 |
| SEWER CREDIT | (¤2,465.75) | 08/01/2023 |
| SEWER INSPECTION | ¤25.00 | 08/01/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/01/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/01/2023 |
| SITE PLAN 30 | ¤30.00 | 08/01/2023 |
| WATER- TURN ON | ¤25.00 | 08/01/2023 |
| ADJUSTMENT 50% | (¤292.11) | 08/01/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/01/2023 |
| INSPECTION - RESIDENTIAL | ¤431.75 | 08/01/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤122.46 | 08/01/2023 |
| CONNECTION FEES | ¤1,166.26 | 08/01/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/01/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/01/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/01/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/01/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/01/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/01/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/01/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/01/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/01/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/01/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/01/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/01/2023 |
| SURCHARGE FS 533.721 | ¤2.92 | 08/01/2023 |
| SURCHARGE - FS 468.631 | ¤4.38 | 08/01/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/01/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/01/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/01/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤18,898.28 |