I want to search for...
Permit #2023070439
Permit Details
Status: COED
| Parcel Id: 07-11-31-7058-00080-0170 |
| CONDITIONED SPACE: 2274 sqft |
| GARAGE: 494 sqft |
| OPENED PORCH (WITH ROOF) : 212 sqft |
| Total Square Footage: 2980 sqft |
| Block: 00080 |
| Subdivision: 2215 - SECTION 58-SEMINOLE PARK |
| Job Phone: 229-375-9123 |
| Location Address: 2 SENTRY CT |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 07/25/2023 |
| NOC: RECORDED |
| Applicant name: WILLIAM ROBERT BARRICK |
| Owner: JM PROPERTIES X LLC |
|
Address PO BOX 9 CISSNA PARK, IL 60924 |
| Lot: 0170 |
| Contracted Stated Job Value: ¤341,100.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
RBI HOMES
| Status | Location Address | State License Number | Phone |
| CANCEL |
21 CEDARWOOD CT PALM COAST, FL 32137 |
RB29003845 (Exp: 08/31/2025) | 386-585-4097 |
Sub Contractors
WILLIAM ROBERT BARRICK
| Status | Location Address | Mailing Address | State License Number | Phone |
| CANCEL |
50 LEANNI WAY PALM COAST, FL 32137 |
STE E2 PALM COAST, FL 32137 |
RC29027799 (Exp: 08/31/2025) | 229-375-9123 |
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
DAVID SCOTT MORRIS
| Status | Location Address | State License Number | Phone |
| INACTIVE |
63 LEIDEL DR PALM COAST, FL 32137 |
ER13015750 (Exp: 08/31/2026) | 386-569-7262 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
ROBERTO F GONZALEZ
| Status | Location Address | State License Number | Phone |
| ACTIVE |
212 PALMETTO AVE CRESCENT CITY, FL 32112 |
RF11067887 (Exp: 08/31/2027) | 286-559-2885 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 05/20/2024 | FINAL APPROVED | BTAYLOR |
| Note: 5/17/2024 - PREVIOUS INSPECTION NOTES 5-17-24 1. Need breaker lock outs for cook top and wall oven. | |||
| BLD - BUILDING FINAL | 05/17/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-17-24 1. Need breaker lock outs for cook top and wall oven. | |||
| ROW - FINAL APRON (AFTER POUR) | 02/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/20/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE. Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW - STORMWATER FINAL | 02/20/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: ALL CORRECTIONS REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. SWALE GRADE MATCHED AT BOTH ADJOINING PROPERTY LINE. BARE AREAS SODDED.. MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE. Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| U -UTILITY RESIDENTIAL FINAL | 02/20/2024 | FINAL APPROVED | JHARDING |
| U-CROSS CONNECTION | 02/20/2024 | APPROVED - AS NOTED | JHARDING |
| Note: No cross connections. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 02/15/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 02/15/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE. Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/19/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ELECTRIC - EARLY POWER | 01/19/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1/11/2024 - PREVIOUS INSPECTION NOTES 1-11-24 1. Exterior corner lights need to be safed off. 1-19-24 1. Emailed FPL at 1:31. | |||
| ROW- PRE-APRON (PRE-POUR) | 01/18/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. | |||
| ELECTRIC - EARLY POWER | 01/11/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 1-11-24 1. Exterior corner lights need to be safed off. | |||
| GRAVITY SEWER TEST | 12/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 12/01/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| LATH/BRICK/ WATER BARRIER | 11/30/2023 | APPROVED | BTAYLOR |
| INSULATION | 11/14/2023 | APPROVED | BTAYLOR |
| ALL ROUGH | 11/08/2023 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 10/24/2023 | APPROVED | BTAYLOR |
| WALL SHEATHING | 10/18/2023 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/18/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 10/13/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 09/20/2023 | APPROVED | BTAYLOR |
| MONOLITHIC SLAB | 09/05/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 08/24/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 08/11/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 01/31/2024 | 01/31/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/28/2023 | 11/28/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please provide a manual permit application that needs to have a notary stamp. | |||
| ZON | COMPLETE | 11/16/2023 | 11/16/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/12/2023 | 10/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/12/2023 | 10/12/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/16/2023 | 08/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/16/2023 | 08/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 08/15/2023 | 08/15/2023 |
| Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.) | |||
| ZON | COMPLETE | 07/24/2023 | 07/25/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/24/2023 | 07/24/2023 |
| Note: Released By: JPI | |||
| BLD | HOLD | 07/12/2023 | 07/16/2023 |
| Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 07/12/2023 | 07/17/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/12/2023 | 07/14/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/12/2023 | 07/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/12/2023 | 07/13/2023 |
| LOCATE | COMPLETE | 07/12/2023 | 07/13/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/12/2023 | 07/14/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/12/2023 | 07/18/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/12/2023 | 07/14/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM landscape plan please add one more tree as this property is 12500 sq ft requires 5 trees | |||
| BADMIN | COMPLETE | 07/12/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/12/2023 | 08/17/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 05/21/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 05/21/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 05/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/21/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 05/21/2024 |
| CONNECTION FEES | ¤1,166.26 | 07/25/2023 |
| WATER-METER | ¤505.39 | 07/25/2023 |
| WATER- TURN ON | ¤25.00 | 07/25/2023 |
| WATER- TURN ON | ¤25.00 | 07/25/2023 |
| ADJUSTMENT 50% | (¤618.63) | 07/25/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/25/2023 |
| INSPECTION - RESIDENTIAL | ¤940.50 | 07/25/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤266.76 | 07/25/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/25/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 07/25/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 07/25/2023 |
| SEWER CREDIT | (¤2,888.67) | 07/25/2023 |
| SEWER INSPECTION | ¤25.00 | 07/25/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 07/25/2023 |
| WATER CREDIT | (¤43.83) | 07/25/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 07/25/2023 |
| SITE PLAN 30 | ¤30.00 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 07/25/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 07/25/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 07/25/2023 |
| IMPACT FEE FIRE | ¤420.52 | 07/25/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 07/25/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 07/25/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 07/25/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 07/25/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 07/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/25/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 07/25/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 07/25/2023 |
| SURCHARGE FS 533.721 | ¤6.19 | 07/25/2023 |
| SURCHARGE - FS 468.631 | ¤9.28 | 07/25/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 07/25/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 07/25/2023 |
| SW ENG PRE APRON | ¤30.00 | 07/25/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,281.62 |