Permit #2023070439

Permit Details

Status: COED

Parcel Id: 07-11-31-7058-00080-0170
CONDITIONED SPACE: 2274 sqft
GARAGE: 494 sqft
OPENED PORCH (WITH ROOF) : 212 sqft
Total Square Footage: 2980 sqft
Block: 00080
Subdivision: 2215 - SECTION 58-SEMINOLE PARK
Job Phone: 229-375-9123
Location Address: 2 SENTRY CT
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 07/25/2023
NOC: RECORDED
Applicant name: WILLIAM ROBERT BARRICK
Owner: JM PROPERTIES X LLC

Address

PO BOX 9

CISSNA PARK, IL 60924

Lot: 0170
Contracted Stated Job Value: ¤341,100.00
Job Description: Single Family Residence
Type: CN

Contractor

RBI HOMES
Status Location Address State License Number Phone
CANCEL

21 CEDARWOOD CT

PALM COAST, FL 32137

RB29003845 (Exp: 08/31/2025) 386-585-4097

Sub Contractors

WILLIAM ROBERT BARRICK
Status Location Address Mailing Address State License Number Phone
CANCEL

50 LEANNI WAY

PALM COAST, FL 32137

STE E2

PALM COAST, FL 32137

RC29027799 (Exp: 08/31/2025) 229-375-9123
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

PO BOX 912

PALM COAST, FL 32164

CAC1820539 (Exp: 08/31/2026) 386-264-0550
DAVID SCOTT MORRIS
Status Location Address State License Number Phone
INACTIVE

63 LEIDEL DR

PALM COAST, FL 32137

ER13015750 (Exp: 08/31/2026) 386-569-7262
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
ROBERTO F GONZALEZ
Status Location Address State License Number Phone
ACTIVE

212 PALMETTO AVE

CRESCENT CITY, FL 32112

RF11067887 (Exp: 08/31/2027) 286-559-2885

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 05/20/2024 FINAL APPROVED BTAYLOR
Note: 5/17/2024 - PREVIOUS INSPECTION NOTES 5-17-24 1. Need breaker lock outs for cook top and wall oven.
BLD - BUILDING FINAL 05/17/2024 Disapproved - NO FEE BTAYLOR
Note: 5-17-24 1. Need breaker lock outs for cook top and wall oven.
ROW - FINAL APRON (AFTER POUR) 02/20/2024 APPROVED - AS NOTED FSLADISH
Note: 2/20/24 PIPE IS GOOD. CUTS MADE. CULVERT CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE. Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW - STORMWATER FINAL 02/20/2024 APPROVED - AS NOTED FSLADISH
Note: ALL CORRECTIONS REQUIRED COMPLETED AT THE TIME OF THIS INSPECTION. SWALE GRADE MATCHED AT BOTH ADJOINING PROPERTY LINE. BARE AREAS SODDED.. MEETS COPC MINIMUM STANDARDS AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE. Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
U -UTILITY RESIDENTIAL FINAL 02/20/2024 FINAL APPROVED JHARDING
U-CROSS CONNECTION 02/20/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/15/2024 APPROVED - AS NOTED FSLADISH
Note: 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/15/2024 APPROVED - AS NOTED FSLADISH
Note: 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow. 2/15/24 UPON WALKING THE PROPERTY DETERMINED THAT SOME CORRECTIOS ARE RQUIRED AT THE TIME OF THIS INSPECTION. YOU NEED TO MATCH GRADE ON BOTH ENDS OF THE SWALE AT THE ADJOINING PROPERTY LINES AND HAVE POSITIVE FLOW WHICH IS CONSIDERED .10 OF FALL EVERY 20'. YOU WILL BE REQUIRED TO FILL ALL BARE AREAS WITH SOD ON BOTH PROPERTY LINES. YOU HAVE DIRT BLOW OUT AND EROSION IN THE REAR PROPERTY LINE THAT NEEDS TO BE RAKED/REMOVED TO ALLOW DRAINAGE TO FLOW. AS A COURTESY I AM GOING TO PASS THIS FIELD SURVEY BUT YOU WILL NEED TO MAKE THESE CORRECTIONS AND ANY OTHERS REQUIRED UPON SUBSEQUENT INSPECTIONS. PHOTOS FO REFERENCE. Inspector Notes from Inspection 9463 2/15/24 swale numbers show flat 23.85 for more than 60' and then flat around the corner at 23.75 for an additional 60'. I will approve this survey as noted, but swale correction may be required after field survey is completed. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ROW- PRE-APRON (PRE-POUR) 01/19/2024 APPROVED - AS NOTED FSLADISH
Note: 1/19/24 PIPE IS GOOD NOW IN TOLERANCE WITH POSITIVE FLOW. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 1/18/2024 - PREVIOUS INSPECTION NOTES 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ELECTRIC - EARLY POWER 01/19/2024 APPROVED - AS NOTED BTAYLOR
Note: 1/11/2024 - PREVIOUS INSPECTION NOTES 1-11-24 1. Exterior corner lights need to be safed off. 1-19-24 1. Emailed FPL at 1:31.
ROW- PRE-APRON (PRE-POUR) 01/18/2024 Disapproved -FEE REQUIRED FSLADISH
Note: 1/18/24 CULVERT PIPE IS OUT OF TOLERANCE WITH SWALE PLAN DIAGRAM. PLEASE RECHECK YOUR CULVERT PIPE ELEVATION TO SWALE PLAM DIAGRAM. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place Sec.300.01c3 Sec 300.01c3 The driveway culvert(s) must be set within the range established by the Swale Plan. The culvert cannot be sloped against the drainage flow nor shall it be sloped more than 0.10 feet in the direction of the drainage flow.
ELECTRIC - EARLY POWER 01/11/2024 Disapproved - NO FEE BTAYLOR
Note: 1-11-24 1. Exterior corner lights need to be safed off.
GRAVITY SEWER TEST 12/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 12/01/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 11/30/2023 APPROVED BTAYLOR
INSULATION 11/14/2023 APPROVED BTAYLOR
ALL ROUGH 11/08/2023 APPROVED BTAYLOR
ROOF VALLEY & METAL 10/24/2023 APPROVED BTAYLOR
WALL SHEATHING 10/18/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/18/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 10/13/2023 APPROVED TBAKER
TIE BEAM / LINTEL 09/20/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 09/05/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 08/24/2023 APPROVED MGIBSON
WATER METER INSTALLATION REQUEST 08/11/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 01/31/2024 01/31/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BADMIN INFORMATION 11/28/2023 11/28/2023
Note: Marked INFORMATION By: MICHELLE RAMOS - (386)986-3780 - MRAMOS@PALMCOASTGOV.COM Please provide a manual permit application that needs to have a notary stamp.
ZON COMPLETE 11/16/2023 11/16/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/12/2023 10/13/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/12/2023 10/12/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 08/16/2023 08/21/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ELEC COMPLETE 08/16/2023 08/21/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
BADMIN INFORMATION 08/15/2023 08/15/2023
Note: Marked INFORMATION By: LIBBY MUSGROVE - - LMUSGROVE@PALMCOASTGOV.COM Wrong File Name Uploaded file name was not correct - Example: Site plan=site plan (do not add anything to the file names like numbers.)
ZON COMPLETE 07/24/2023 07/25/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 07/24/2023 07/24/2023
Note: Released By: JPI
BLD HOLD 07/12/2023 07/16/2023
Note: Held By: JPI 1. Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet.
CUSVC COMPLETE 07/12/2023 07/17/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/12/2023 07/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/12/2023 07/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/12/2023 07/13/2023
LOCATE COMPLETE 07/12/2023 07/13/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/12/2023 07/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/12/2023 07/18/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 07/12/2023 07/14/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM landscape plan please add one more tree as this property is 12500 sq ft requires 5 trees
BADMIN COMPLETE 07/12/2023 07/17/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 07/12/2023 08/17/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
CONTRACTOR CHANGE ¤20.00 05/21/2024
CONTRACTOR CHANGE ¤20.00 05/21/2024
SW ENG REINSPECTION 30 ¤30.00 05/21/2024
PLAN REVIEW - REVISION ¤32.50 05/21/2024
PLAN REVIEW - REVISION ¤32.50 05/21/2024
CONNECTION FEES ¤1,166.26 07/25/2023
WATER-METER ¤505.39 07/25/2023
WATER- TURN ON ¤25.00 07/25/2023
WATER- TURN ON ¤25.00 07/25/2023
ADJUSTMENT 50% (¤618.63) 07/25/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 07/25/2023
INSPECTION - RESIDENTIAL ¤940.50 07/25/2023
PLAN REVIEW - RESIDENTIAL ¤266.76 07/25/2023
SW ENG - REVIEW 20 ¤20.00 07/25/2023
SW ENG RES REVIEW 200 ¤200.00 07/25/2023
TRANS IMPACT FEE ADMIN ¤54.36 07/25/2023
TRANS IMPACT FEE ADMIN (¤54.36) 07/25/2023
SEWER CREDIT (¤2,888.67) 07/25/2023
SEWER INSPECTION ¤25.00 07/25/2023
SEWER CAPITAL FACILITY ¤5,344.82 07/25/2023
WATER CREDIT (¤43.83) 07/25/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 07/25/2023
SITE PLAN 30 ¤30.00 07/25/2023
FIRE IMPACT FEE ADMIN ¤12.62 07/25/2023
FIRE IMPACT FEE ADMIN (¤12.62) 07/25/2023
FC IMPACT FEE EMS ¤62.00 07/25/2023
IMPACT FEE FIRE ¤420.52 07/25/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 07/25/2023
FC IMPACT FEE LIBRARY ¤268.00 07/25/2023
IMPACT FEE PARKS ¤1,769.15 07/25/2023
IMPACT FEE SCHOOL ¤5,450.00 07/25/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 07/25/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/25/2023
WATER -IRRIGATION INSPECTION ¤25.00 07/25/2023
PARKS IMPACT FEE ADMIN ¤53.07 07/25/2023
PARKS IMPACT FEE ADMIN (¤53.07) 07/25/2023
SURCHARGE FS 533.721 ¤6.19 07/25/2023
SURCHARGE - FS 468.631 ¤9.28 07/25/2023
SW ENG - FOUNDATION SURVEY ¤20.00 07/25/2023
SW ENG INSPECTION 80 ¤80.00 07/25/2023
SW ENG PRE APRON ¤30.00 07/25/2023
Fees Total Due: ¤0.00 Total Paid: ¤19,281.62