I want to search for...

Permit #2023070485

Permit Details

Status: COED

Parcel Id: 33-11-31-3061-00090-0240
CONDITIONED SPACE: 2376 sqft
GARAGE: 776 sqft
OPENED PORCH (WITH ROOF) : 76 sqft
PATIO/DECK (NO ROOF) : 474 sqft
SCREEN PORCH (SOLID ROOF) : 162 sqft
Total Square Footage: 3864 sqft
Block: 00090
Subdivision: 2108 - HIDDEN LAKES PHASE II - TOSCANA
Job Phone: 407-808-8155
Location Address: 124 NEW LEATHERWOOD DR
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/02/2023
NOC: RECORDED
Applicant name: YUVAL BOTANSKY
Owner: APPLIED BUILDING DEVELOPMENT OF ORLANDO - PC INC

Address

131 CHADWICK DRIVE

DAVENPORT, FL 33837

Lot: 0240
Contracted Stated Job Value: ¤300,000.00
Job Description: Single Family Residence
Type: CN

Contractor

APPLIED BUILDING DEVELOPMENT COMPANY - OAKHILLS IN
Status Location Address State License Number Phone Fax
ACTIVE

131 CHADWICK DRIVE

DAVENPORT, FL 33837

CRC1330762 (Exp: 08/31/2026) 863-420-2100 386-517-6865

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JACK DOUGLAS LANIER
Status Location Address State License Number Phone Fax
ACTIVE

485 COMMERCE WAY

LONGWOOD , FL 32750

CCC058022 (Exp: 08/31/2026) (321)441-2300 (321)441-2313
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 04/17/2024 FINAL APPROVED BTAYLOR
U-CROSS CONNECTION 04/16/2024 APPROVED - AS NOTED LFITZGERALD
Note: reclaimirr-no cross connection
ROW - FINAL APRON (AFTER POUR) 04/16/2024 APPROVED TPOLACEK
Note: 04/16/24 PAVERS ARE SET CONCRETE IS GOOD AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - STORMWATER FINAL 04/16/2024 APPROVED TPOLACEK
Note: 04/16/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
U -UTILITY RESIDENTIAL FINAL 04/16/2024 FINAL APPROVED LFITZGERALD
ROW- FINAL SURVEY/GRADING CERTIFICATION 04/12/2024 APPROVED TPOLACEK
Note: 04/12/24 UPON WALKING PROPERTY DRAINAGE WILL WORK AS INDICATED ON FINAL SURVEY. AT THE OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. Inspector Notes from Inspection 9270 2/5/24 SPREAD AND COMPACTION ACCEPTABLE AT THE TIME OF THIS INSPECTION. YOU MAY NOW LAY PAVERS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 1/31/24 PAVER RESTAINTS ARE READY TO POUR AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION SECONDARY PREPOUR HAS BE PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW FIELD SURVEY /GRADING CERTIFICATION 04/12/2024 APPROVED TPOLACEK
Note: 04/12/24 AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. NIETHER THE INSPECTOR NOR THE CITY IS RESPONSIBLE IF, FOR WHATEVER REASON, SITE CONDITIONS CHANGE OVER TIME AFTER THE INSPECTION. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
TIE BEAM / LINTEL 03/14/2024 APPROVED BTAYLOR
ELECTRIC - EARLY POWER 03/05/2024 APPROVED - AS NOTED BTAYLOR
Note: Inspector Notes from Inspection 2200 11/6/23: FPL notified to release power at @ 09:25 3-5-24 1. Emailed FPL at 10:06.
ROW- PRE-APRON (PRE-POUR) 02/05/2024 APPROVED - AS NOTED FSLADISH
Note: 2/5/24 SPREAD AND COMPACTION ACCEPTABLE AT THE TIME OF THIS INSPECTION. YOU MAY NOW LAY PAVERS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9271 1/31/24 PAVER RESTAINTS ARE READY TO POUR AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION SECONDARY PREPOUR HAS BE PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PAVER RESTRAINTS 01/31/2024 APPROVED - AS NOTED FSLADISH
Note: 1/31/24 PAVER RESTAINTS ARE READY TO POUR AT THE TIME OF THIS INSPECTION. DO NOT LAY ANY PAVERS UNTIL SPREAD AND COMPACTION SECONDARY PREPOUR HAS BE PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
ROW- PRE-APRON (PRE-POUR) 01/31/2024 PARTIALLY APPROVED FSLADISH
Note: 1/31/24 READY TO POUR PAVER RESTRAINTS, DRIVEWAY APRON AND SIDEWALK AT THE TIME OF THIS PREPOUR INSPECTION. DO NOT LAY ANY PAVERS AT THIS TIME. NOT UNTIL YOUR SPREAD AND COMPACTION SECONDARY PREPOUR INSPECTION HAS BEEN PASSED. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING.
U - SEWER TIE IN 12/06/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE COQUINA ROCK FRM SLAB BEFORE BACKFILLING ON WASTE AND WATER LINES. THIS WAS A VIRETUAL INSPECTION
GRAVITY SEWER TEST 12/06/2023 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE COQUINA ROCK FRM SLAB BEFORE BACKFILLING ON WASTE AND WATER LINES. THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 11/17/2023 APPROVED RSIMS
INSULATION 11/14/2023 APPROVED BTAYLOR
ALL ROUGH 11/08/2023 APPROVED BTAYLOR
ELECTRIC-TUG 11/06/2023 APPROVED - AS NOTED RSIMS
Note: 11/6/23: FPL notified to release power at @ 09:25
WALL SHEATHING 10/31/2023 APPROVED RSIMS
ROOF VALLEY & METAL 10/13/2023 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 10/11/2023 APPROVED BTAYLOR
ROOF SHEATHING 10/03/2023 APPROVED KSANDOE
FOUND SURVEY APPROVED (OFFICE) 09/21/2023 APPROVED TBAKER
TIE BEAM / LINTEL 09/19/2023 APPROVED BTAYLOR
MONOLITHIC SLAB 09/06/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 09/01/2023 APPROVED - AS NOTED MGIBSON
Note: REMOVE COQUINA ROCK FRM SLAB BEFORE BACKFILLING ON WASTE AND WATER LINES
WATER METER INSTALLATION REQUEST 08/14/2023 APPROVED CBOWERMASTER
FOOTER 08/09/2023 APPROVED BTAYLOR

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 09/21/2023 09/21/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/21/2023 09/21/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD CANCEL 09/19/2023 09/21/2023
ZON COMPLETE 08/01/2023 08/01/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
URB COMPLETE 07/14/2023 07/17/2023
Note: Released By: JOHN BEAUDET - (386)986-2456 - JBEAUDET@PALMCOASTGOV.COM
BLD COMPLETE 07/13/2023 07/24/2023
Note: Released By: JPI
CUSVC COMPLETE 07/13/2023 07/17/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/13/2023 07/14/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/13/2023 07/13/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/13/2023 07/13/2023
LOCATE COMPLETE 07/13/2023 07/14/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/13/2023 07/14/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/13/2023 07/18/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 07/13/2023 07/14/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Landscape plan: Sod missing and legend is not legible Color sheet- manufacturer of paint missing and LRV needs to be provided
BADMIN COMPLETE 07/13/2023 07/25/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER-METER ¤505.39 08/02/2023
WATER-METER ¤419.86 08/02/2023
ADJUSTMENT 50% (¤588.63) 08/02/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/02/2023
INSPECTION - RESIDENTIAL ¤893.75 08/02/2023
PLAN REVIEW - RESIDENTIAL ¤253.50 08/02/2023
CONNECTION FEES ¤25.00 08/02/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/02/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/02/2023
FC IMPACT FEE EMS ¤62.00 08/02/2023
IMPACT FEE FIRE ¤420.52 08/02/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/02/2023
FC IMPACT FEE LIBRARY ¤268.00 08/02/2023
IMPACT FEE PARKS ¤1,769.15 08/02/2023
IMPACT FEE SCHOOL ¤5,450.00 08/02/2023
IMPACT FEE TRANSPORTATION ¤3,311.00 08/02/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/02/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/02/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/02/2023
SURCHARGE FS 533.721 ¤5.89 08/02/2023
SURCHARGE - FS 468.631 ¤8.83 08/02/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/02/2023
SW ENG INSPECTION 80 ¤80.00 08/02/2023
SW ENG PRE APRON ¤30.00 08/02/2023
SW ENG - REVIEW 20 ¤20.00 08/02/2023
SW ENG RES REVIEW 200 ¤200.00 08/02/2023
TRANS IMPACT FEE ADMIN ¤99.33 08/02/2023
TRANS IMPACT FEE ADMIN (¤99.33) 08/02/2023
SEWER INSPECTION ¤25.00 08/02/2023
SEWER CAPITAL FACILITY ¤1,682.11 08/02/2023
WATER CAPITAL FACILITY FEE ¤1,398.48 08/02/2023
SITE PLAN 30 ¤30.00 08/02/2023
Fees Total Due: ¤0.00 Total Paid: ¤16,562.85