I want to search for...
Permit #2023070541
Permit Details
Status: COED
| Parcel Id: 07-11-31-7010-00110-0190 |
| CONDITIONED SPACE: 2105 sqft |
| GARAGE: 748 sqft |
| OPENED PORCH (WITH ROOF) : 326 sqft |
| Total Square Footage: 3179 sqft |
| Block: 00110 |
| Subdivision: 2137 - SECTION 10-FLORIDA PARK |
| Job Phone: 904-338-1270 |
| Location Address: 27 FIRCREST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 11/02/2023 |
| NOC: RECORDED |
| Applicant name: DAVID VINCENT KIMBLE |
| Owner: GONCALVES FERNANDO & EWA H&W |
|
Address 127 CARRIAGE ROAD CHICOPEE, MA 01013 |
| Lot: 0190 |
| Contracted Stated Job Value: ¤350,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
EVERLAST HOMES, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
13245 ATLANTIC BLVD JACKSONVILLE, FL 32246 |
CBC1260552 (Exp: 08/31/2026) | 904-545-6476 |
Sub Contractors
GARY LLOYD SHEFFIELD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
PO BOX 912 PALM COAST, FL 32164 |
CAC1820539 (Exp: 08/31/2026) | 386-264-0550 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
RUSSELL J CARTER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
PO BOX 302 DELAND, FL 32721 |
CFC1425938 (Exp: 08/31/2026) | 386-736-4220 | 386-736-4219 |
DEBORAH MAXINE JACKSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
1165 SOUTH 5TH MACCLENNY, FL 32063 |
CCC1330709 (Exp: 08/31/2026) | 904-322-9409 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 09/20/2024 | Approval - Private Provider | PPROVIDER |
| BLD - BUILDING FINAL | 09/20/2024 | FINAL APPROVED | AWATERS |
| Note: APPROVED BY PRIVATE PROVIDER | |||
| WILDLIFE CHECK - ENVIRONMENTAL | 09/20/2024 | APPROVED | DRODRIGUEZ |
| U-CROSS CONNECTION | 09/20/2024 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 09/20/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW - STORMWATER FINAL | 09/20/2024 | APPROVED | EMADISON |
| Note: | |||
| U -UTILITY RESIDENTIAL FINAL | 09/20/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 09/19/2024 | APPROVED | EMADISON |
| Note: | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 09/19/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 09/19/24 BUILDER NEEDS TO REMOVE CONCRETE FROM LEFT SIDE IN SWALE IN FRONT OF VACANT ** NEED TO FINISH REPAIR OF SWALE ON LEFT SIDE IN FRONT OF VACANT ** CLEAN CULVERT PIPE | |||
| ROW- PRE-APRON (PRE-POUR) | 08/28/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 08/28/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ROW- PRE-APRON (PRE-POUR) | 08/27/2024 | CANCELLED BY APPLICANT | WEB |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/09/2024 | Disapproved - NO FEE | EMADISON |
| Note: ** 08/09/24 CULVERT PIPE IS PITCH IN THE WRONG DIRECTION STORMWATER IS TO FLOW FROM RIGHT TO LEFT ** YOU PROPOSED A COMMON SWALE ON LEFT SIDE PROPERTY LINE WITH VACANT LOT NOTE THE BELOW LETTER ** CONTRACTORS NEWSFLASH Grading and Final Surveys April 9, 2024 The Stormwater Division would like to remind contractors the importance of adhering to the approved site plan throughout the entire construction process unless revisions have been submitted and approved in accordance with COPC permitting procedures. Recently we have received several Final Surveys with significant and unapproved departures from the original site plan. We understand that sometimes site conditions and circumstances arise during construction which require alterations to the original plan. In such cases, the contractor is required to submit a revised site plan for review and approval PRIOR to the execution of work Alterations to grading and drainage shall not be made without prior approval from the Stormwater Division. Updated requirements for grading and finished floor elevations in the February 2024 updated Technical Manual. https://www.palmcoast.gov/community-development Please contact the Stormwater Division at 386-986-4750 with any questions/concerns. | |||
| ROW- PRE-APRON (PRE-POUR) | 06/18/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 06/18/24 READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL | |||
| ELECTRIC - EARLY POWER | 06/03/2024 | Approval - Private Provider | PPROVIDER |
| U - SEWER TIE IN | 05/02/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| INSULATION | 04/04/2024 | Approval - Private Provider | PPROVIDER |
| Note: 4/3/2024 8:56:26 AM- PREVIOUS INSPECTION NOTES | |||
| INSULATION | 04/02/2024 | Disapproved- Private Provider | PPROVIDER |
| INSULATION | 04/01/2024 | CANCELLED BY APPLICANT | WEB |
| ALL ROUGH | 03/26/2024 | Approval - Private Provider | PPROVIDER |
| Note: 2/20/2024 7:24:59 AM- PREVIOUS INSPECTION NOTES | |||
| LATH/BRICK/ WATER BARRIER | 02/28/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 02/16/2024 | Disapproved- Private Provider | PPROVIDER |
| WALL SHEATHING | 02/14/2024 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 02/14/2024 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 02/14/2024 | Approval - Private Provider | PPROVIDER |
| TIE BEAM / LINTEL | 01/11/2024 | APPROVED | BBEMBRY |
| FOUND SURVEY APPROVED (OFFICE) | 12/21/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 12/06/2023 | Approval - Private Provider | PPROVIDER |
| PLUMBING 1ST ROUGH UNDERGROUND | 12/01/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 12/01/2023 | Approval - Private Provider | PPROVIDER |
| WATER METER INSTALLATION REQUEST | 11/03/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/21/2023 | 12/21/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 09/11/2023 | 09/11/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM No comments- After Action Report submitted. | |||
| PLENV | HOLD | 08/28/2023 | 08/29/2023 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 07/18/2023 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| BLD | COMPLETE | 07/31/2023 | 07/31/2023 |
| Note: Released By: JPI | |||
| BLD | HOLD | 07/19/2023 | 07/19/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| PLENV | HOLD | 07/17/2023 | 07/18/2023 |
| Note: Held By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conduced a site visit on 07/18/2023 and found potentially occupied Gopher Tortoise burrow. Please either provide a Gopher Tortoise survey by a QEP that shows the burrow is not within 25ft of construction activities or an approved After Action Report from FWC after relocation activities have been completed. | |||
| BLD | HOLD | 07/13/2023 | 07/17/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/13/2023 | 07/13/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/13/2023 | 07/17/2023 |
| LOCATE | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/13/2023 | 07/18/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/13/2023 | 07/17/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/13/2023 | 08/23/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| WATER- TURN ON | ¤25.00 | 11/02/2023 |
| ADJUSTMENT 50% | (¤151.50) | 11/02/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 11/02/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 11/02/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤273.00 | 11/02/2023 |
| CONNECTION FEES | ¤1,166.26 | 11/02/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 11/02/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 11/02/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 11/02/2023 |
| IMPACT FEE FIRE | ¤420.52 | 11/02/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 11/02/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 11/02/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 11/02/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 11/02/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 11/02/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 11/02/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 11/02/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 11/02/2023 |
| SURCHARGE FS 533.721 | ¤3.77 | 11/02/2023 |
| SURCHARGE - FS 468.631 | ¤5.65 | 11/02/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 11/02/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 11/02/2023 |
| SW ENG PRE APRON | ¤30.00 | 11/02/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 11/02/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 11/02/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 11/02/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 11/02/2023 |
| SEWER INSPECTION | ¤25.00 | 11/02/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 11/02/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 11/02/2023 |
| SITE PLAN 30 | ¤30.00 | 11/02/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,275.55 |