Permit #2023070606
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7034-00870-0060 |
| Block: 00870 |
| Subdivision: 2165 - SECTION 34-EASTHAMPTON |
| Job Phone: 386-931-6577 |
| Location Address: 32 ERIC DR |
| Type: BA - BUILDING ADDITION |
| Issue Date: 07/14/2023 |
| NOC: RECORDED |
| Applicant name: LUIS JORGE MEDEIROS |
| Owner: MOODY MICHAEL W & PATRICIA W H & W |
|
Address 32 ERIC DR PALM COAST, FL 32164 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤50,500.00 |
| Job Description: GARAGE ADDITION 2022050216 |
| Type: CN |
| Original Permit #: 2022050216 |
Contractor
A PLUS HOME IMPROVEMENTS LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
306 S RAILROAD ST BUNNELL, FL 32110 |
CRC1327024 (Exp: 08/31/2026) | 386-263-2167 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
Inspection History
| Type | Request Date | Result | Inspector |
| U -UTILITY RESIDENTIAL FINAL | 02/07/2025 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL INSPECTION | 02/06/2025 | APPROVED | GBERTOLA |
| Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. | |||
| BLD - BUILDING FINAL | 01/13/2025 | FINAL APPROVED | RSIMS |
| Note: 9/4/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 9/4/2024 3:53:07 PM *** 1. Please seal all ceiling penetrations. R402.4 2. All receptacles in the garage require GFCI protection. (GFCI breakers for 220). NEC 210.8 A | |||
| BLD - BUILDING FINAL | 09/04/2024 | Disapproved - NO FEE | JSTEWART |
| Note: *** NOTES ADDED BY JSTEWART 9/4/2024 3:53:07 PM *** 1. Please seal all ceiling penetrations. R402.4 2. All receptacles in the garage require GFCI protection. (GFCI breakers for 220). NEC 210.8 A | |||
| ROW- PRE-APRON (PRE-POUR) | 04/03/2024 | APPROVED | TPOLACEK |
| Note: 04/03/24 AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. ---------------------------------------------- 4/2/2024 - PREVIOUS INSPECTION NOTES 04/02/24 PIPE IS JUST WITHIN TOLERANCE HOWEVER THE PIPE IS ROTATED AND NOT SQUARE IN THE MITERED ENDS. PIPE SHOULD HAVE EQUAL MEASURMENTS TO FORM BOARDS WITH A MINIMUM OF 2" OVER THE MITERED END. IF YOU HAVE ANY QUESTIONS PLEASE CALL INSPECTOR 396-346-8986 TOM ------------------------------------------------------------------------------------------------------------------ 3/28/2024 - PREVIOUS INSPECTION NOTES 03/28/24 PIPE IS OUT OF TOLERANCE, THERE ARE WASHOUTS DUE TO RAIN THAT WILL NEED TO BE REESTABLISHED AS WELL. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 04/02/2024 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 04/02/24 PIPE IS JUST WITHIN TOLERANCE HOWEVER THE PIPE IS ROTATED AND NOT SQUARE IN THE MITERED ENDS. PIPE SHOULD HAVE EQUAL MEASURMENTS TO FORM BOARDS WITH A MINIMUM OF 2" OVER THE MITERED END. IF YOU HAVE ANY QUESTIONS PLEASE CALL INSPECTOR 396-346-8986 TOM ------------------------------------------------------------------------------------------------------------------ 3/28/2024 - PREVIOUS INSPECTION NOTES 03/28/24 PIPE IS OUT OF TOLERANCE, THERE ARE WASHOUTS DUE TO RAIN THAT WILL NEED TO BE REESTABLISHED AS WELL. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| ROW- PRE-APRON (PRE-POUR) | 03/28/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: 03/28/24 PIPE IS OUT OF TOLERANCE, THERE ARE WASHOUTS DUE TO RAIN THAT WILL NEED TO BE REESTABLISHED AS WELL. Culvert Out of Tolerence Swale Plan #1 Swale Plan #1. The driveway culvert inverts are to be installed within 0.1' (+/-) of the elevations indicated on the swale plan (unless otherwise approved by the City StormwaterEngineer). The finished swale elevation is with sod in place | |||
| INSULATION | 11/13/2023 | APPROVED | JWALKER |
| ALL ROUGH | 11/02/2023 | APPROVED | JWALKER |
| Note: 11/1/2023 - PREVIOUS INSPECTION NOTES 11/1/23 1. E-cals and plans only show one mini split installed, 2 new units have been installed. Need revision to plans and e-cals 2. All metalic boxes need to be open to ensure proper bonding 10/27/2023 8:05:59 AM- PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: Incomplete plans in the permit box. No energy calcs, etc. ** Need revision submitted to and approved by the City for the additional outlets, etc. along with the new plan showing relocation of pep tank control box. Lineset, etc. not run for mini-split system. | |||
| ALL ROUGH | 11/01/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 11/1/23 1. E-cals and plans only show one mini split installed, 2 new units have been installed. Need revision to plans and e-cals 2. All metalic boxes need to be open to ensure proper bonding 10/27/2023 8:05:59 AM- PREVIOUS INSPECTION NOTES 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: Incomplete plans in the permit box. No energy calcs, etc. ** Need revision submitted to and approved by the City for the additional outlets, etc. along with the new plan showing relocation of pep tank control box. Lineset, etc. not run for mini-split system. | |||
| ALL ROUGH | 10/27/2023 | CANCELLED BY APPLICANT | MRAMOS |
| Note: 8/10/2023 - PREVIOUS INSPECTION NOTES 8/10/23: Incomplete plans in the permit box. No energy calcs, etc. ** Need revision submitted to and approved by the City for the additional outlets, etc. along with the new plan showing relocation of pep tank control box. Lineset, etc. not run for mini-split system. | |||
| ALL ROUGH | 08/10/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 8/10/23: Incomplete plans in the permit box. No energy calcs, etc. ** Need revision submitted to and approved by the City for the additional outlets, etc. along with the new plan showing relocation of pep tank control box. Lineset, etc. not run for mini-split system. | |||
| ROOF VALLEY & METAL | 07/24/2023 | APPROVED | MKRASKI |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 07/21/2023 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2340 12/14/22: NEED A CLEAN SET OF PRINTS STAMPED BY THE CITY IN THE PERMIT BOX BEFORE NEXT INSPECTION! Prints in box are not stamped by the City and are in disarray. R 107.3,1. - Approved documents need to be on-site for inspections. | |||
| TIE BEAM / LINTEL | 12/14/2022 | APPROVED - AS NOTED | RSIMS |
| Note: 12/14/22: NEED A CLEAN SET OF PRINTS STAMPED BY THE CITY IN THE PERMIT BOX BEFORE NEXT INSPECTION! Prints in box are not stamped by the City and are in disarray. R 107.3,1. - Approved documents need to be on-site for inspections. | |||
| MONOLITHIC SLAB | 10/20/2022 | APPROVED | RMARTIN |
| Note: 10/19/2022 - PREVIOUS INSPECTION NOTES 9/22/2022 - PREVIOUS INSPECTION NOTES 1. Pipes passing through footing need to be sleeved or a relieving arch needs to be installed. 2. There is an existing Irrigation control valve box at the front left area of the slab with an access door. This box along with any controls will need to be relocted. 3. Footing call for 20" depth. 10/19/22 The Pipes have not been sleeved or arched. Remove all debris from slab and footings. | |||
| MONOLITHIC SLAB | 10/19/2022 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 9/22/2022 - PREVIOUS INSPECTION NOTES 1. Pipes passing through footing need to be sleeved or a relieving arch needs to be installed. 2. There is an existing Irrigation control valve box at the front left area of the slab with an access door. This box along with any controls will need to be relocted. 3. Footing call for 20" depth. 10/19/22 The Pipes have not been sleeved or arched. Remove all debris from slab and footings. | |||
| MONOLITHIC SLAB | 09/22/2022 | Disapproved - NO FEE | JWALKER |
| Note: 1. Pipes passing through footing need to be sleeved or a relieving arch needs to be installed. 2. There is an existing Irrigation control valve box at the front left area of the slab with an access door. This box along with any controls will need to be relocted. 3. Footing call for 20" depth. |
Review History
| Department | Status | Date In | Date Out |
| ZON | CANCEL | 03/27/2024 | 03/27/2024 |
| BADMIN | INFORMATION | 02/13/2024 | 02/13/2024 |
| Note: Marked INFORMATION By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Incorrect Survey provided Survey is not for 32 Eric Drive | |||
| ZON | HOLD | 01/17/2024 | 01/17/2024 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Site plan: Please submit any revisions to the driveway on the site plan. | |||
| ENGIN1 | COMPLETE | 01/09/2024 | 01/11/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 01/09/2024 | 01/17/2024 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/23/2023 | 10/26/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/23/2023 | 10/27/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 06/16/2023 | 06/16/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM RENAME TO NOC.PDF | |||
| BLD | COMPLETE | 06/12/2023 | 06/15/2023 |
| Note: Released By: PATRICK BUCKLEY - (386)986-3786 - PBUCKLEY@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 05/30/2023 | 05/30/2023 |
| Note: Marked INFORMATION By: MICHELLE RAMOS - - MRAMOS@PALMCOASTGOV.COM Wrong address for NOC | |||
| MECH | COMPLETE | 05/11/2022 | 05/11/2022 |
| Note: Released By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/10/2022 | 05/11/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Energy Calcs need to be signed by the builder | |||
| BLD | COMPLETE | 05/10/2022 | 05/11/2022 |
| Note: Released By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM | |||
| BLD | HOLD | 05/05/2022 | 05/06/2022 |
| Note: Held By: HAROLD ALLEN - (386)986-2357 - HALLEN@PALMCOASTGOV.COM All comments below per the 2020 Florida Building Code PLAN REVIEW COMMENTS: 1. Provide Product Approval for overhead door. Per F.S. 471.025 and F.A.C. 61 G15-23.005. | |||
| ELEC | COMPLETE | 05/05/2022 | 05/06/2022 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| MECH | HOLD | 05/05/2022 | 05/05/2022 |
| Note: Held By: CHRIS PISCITELLI - (386)986-3782 - CPISCITELLI@PALMCOASTGOV.COM Provide Energy calcs | |||
| PLUM | CANCEL | 05/05/2022 | 05/06/2022 |
| SW1 | COMPLETE | 05/05/2022 | 05/12/2022 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 05/05/2022 | 05/10/2022 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Garage space cannot exceed 50% of the living square footage. Please provide the existing square footage of the living sq. ft. Please note what material will be used for the roof. Please be advised that it must match existing roof. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADMINISTRATIVE - EXTENSION | ¤40.00 | 02/06/2025 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 02/06/2025 |
| SW ENG REINSPECTION 30 | ¤30.00 | 02/06/2025 |
| SW ENG - REVIEW 20 | ¤20.00 | 07/14/2023 |
| ADJUSTMENT 50% | (¤85.13) | 07/14/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 07/14/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 07/14/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 07/14/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 07/14/2023 |
| INSPECTION - RESIDENTIAL | ¤140.25 | 07/14/2023 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 07/14/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤279.12 |