Permit #2023070793
Permit Details
Status: COED
| Parcel Id: 07-11-31-7026-00020-0280 |
| CONDITIONED SPACE: 1392 sqft |
| GARAGE: 450 sqft |
| OPENED PORCH (WITH ROOF) : 130 sqft |
| SCREEN PORCH (SOLID ROOF) : 72 sqft |
| CONDITIONED SPACE: 1392 sqft |
| GARAGE: 450 sqft |
| OPENED PORCH (WITH ROOF) : 72 sqft |
| OPENED PORCH (WITH ROOF) : 130 sqft |
| Total Square Footage: 4088 sqft |
| Block: 00020 |
| Subdivision: 2153 - SECTION 26-PINE GROVE |
| Job Phone: 386-627-0430 |
| Location Address: 40 PINE HILL LN |
| Type: DU - DUPLEX |
| Issue Date: 08/15/2023 |
| NOC: RECORDED |
| Applicant name: ANNA WIKTORIA LISOWSKI |
| Owner: LESNIEWSKI PIOTR & ADRIANA H&W |
|
Address 63 JACKLYN CT INWOOD, NY 11096 |
| Lot: 0280 |
| Contracted Stated Job Value: ¤400,000.00 |
| Job Description: Duplex |
| Type: CN |
Contractor
GOLDEN FOX HOME REMODELING, INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
72 HERNANDEZ AVE PALM COAST, FL 32137 |
CBC1259266 (Exp: 08/31/2026) | 386-627-0430 |
Sub Contractors
DANIEL J LUSINSKI
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
389 PALM COAST PARKWAY SW PALM COAST, FL 32137 |
#4 PALM COAST, FL 32137 |
CCC1330133 (Exp: 08/31/2026) | 386-338-7926 |
WILLIAM TODD SIKES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
83 PORT ROYAL DR ST AUGUSTINE, FL 32084 |
EC0002726 (Exp: 08/31/2026) | 904-762-8762 |
JUAN CARLOS GONZALEZ
| Status | Location Address | State License Number |
| ACTIVE |
1328 COUNTY ROAD 308 CRESCENT CITY, FL 32112 |
RF11067806 (Exp: 08/31/2027) |
SCOTT H STILLWELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4500 US 1 UNIT 206 BUNNELL, FL 32110 |
CAC1819433 (Exp: 08/31/2026) | 386-864-4404 |
Inspection History
| Type | Request Date | Result | Inspector |
| U-CROSS CONNECTION | 03/14/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no crooss connectin | |||
| ROW - FINAL APRON (AFTER POUR) | 03/13/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE --------------------------------------------------------------- ** 03/11/24 BEFORE ROW FINAL ** BUILDER IS REQUIRED TO REMOVE LARGE CHUNK OF CONCRETE THAT WAS DUMPED IN VACANT ACROSS THE STREET (NOTE WHITE ARROW POINTING IN DIRECTION) ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ACROSS STREET ** REPAIR AND SOD ROW IN VACANT ACROSS THE STREET TO MATCH THE EXISTING GRADE DO NOT SET SOD TOP CREATE A DAM ***NEEDS TO BE CUT IN*** | |||
| ROW - FINAL INSPECTION | 03/13/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE ---------------------------------------------------------------- ** 03/11/24 BEFORE ROW FINAL ** BUILDER IS REQUIRED TO REMOVE LARGE CHUNK OF CONCRETE THAT WAS DUMPED IN VACANT ACROSS THE STREET (NOTE WHITE ARROW POINTING IN DIRECTION) ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ACROSS STREET ** REPAIR AND SOD ROW IN VACANT ACROSS THE STREET TO MATCH THE EXISTING GRADE DO NOT SET SOD TOP CREATE A DAM ***NEEDS TO BE CUT IN*** | |||
| U -UTILITY RESIDENTIAL FINAL | 03/13/2024 | FINAL APPROVED | LFITZGERALD |
| BLD - BUILDING FINAL | 03/12/2024 | FINAL APPROVED | KSANDOE |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/11/2024 | APPROVED | EMADISON |
| Note: 3/7/2024 - PREVIOUS INSPECTION NOTES 1) ALL THE ELEVATIONS AGAINST THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 2) WHEN WALKING THE PROPERTY TO VERIFY THE FINAL SURVEY ACCURACY. I NOTICE THAT THE 10' OFF SET ELEVATIONS ON BOTH SIDE ADJACENT PROPERTYS CAN NOT BE THE CORRECT ELEVATIONS. NEED TO GET SURVEYOR TO COME OUT TO COLLECT THE RIGHT ELEVATION SO THERE IS NO INCONSISTENCYS IN THE FIELD AND THE FINAL SURVEY. ALSO WITH THE ELEVATION BEING WRONG THE DRAINAGE DOESN'T MEET CITY STANDARDS. HERE IS THE CODE FOR THIS STANDARD Sec. 300.04 E7 The top of slope of “w” swales along the property lines shall be a minimum of 0.30 feet higher than the toe of slope. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/11/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 03/11/24 BEFORE ROW FINAL ** BUILDER IS REQUIRED TO REMOVE LARGE CHUNK OF CONCRETE THAT WAS DUMPED IN VACANT ACROSS THE STREET (NOTE WHITE ARROW POINTING IN DIRECTION) ** REMOVE ALL TRASH AND CONSTRUCTION DEBRIS FROM VACANT ACROSS STREET ** REPAIR AND SOD ROW IN VACANT ACROSS THE STREET TO MATCH THE EXISTING GRADE DO NOT SET SOD TOP CREATE A DAM ***NEEDS TO BE CUT IN*** | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/07/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: 1) ALL THE ELEVATIONS AGAINST THE STRUCTURE NEED TO BE A MINIMUM OF 4" BELOW FFE. Section 300.01 (A)(1)(C)(6) .Sod elevations adjacent to the structure are 4” below the FFE for block and 6” for wood frame structures. 2) WHEN WALKING THE PROPERTY TO VERIFY THE FINAL SURVEY ACCURACY. I NOTICE THAT THE 10' OFF SET ELEVATIONS ON BOTH SIDE ADJACENT PROPERTYS CAN NOT BE THE CORRECT ELEVATIONS. NEED TO GET SURVEYOR TO COME OUT TO COLLECT THE RIGHT ELEVATION SO THERE IS NO INCONSISTENCYS IN THE FIELD AND THE FINAL SURVEY. ALSO WITH THE ELEVATION BEING WRONG THE DRAINAGE DOESN'T MEET CITY STANDARDS. HERE IS THE CODE FOR THIS STANDARD Sec. 300.04 E7 The top of slope of “w” swales along the property lines shall be a minimum of 0.30 feet higher than the toe of slope. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/01/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE ON THE LEFT CULVERT IT IS NOW 8' FROM EDGE OF PAVEMENT. READY TO POUR BOTH CULVERTS. IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ---------------------------------------------------------------------------------------------- 1/31/2024 - PREVIOUS INSPECTION NOTES OK TO POUR THE RIGHT DRIVEWAY ONLY IF YOU ARE FACE THE HOUSE FROM THE STREET. LEFT DRIVEWAY LEFT SIDE OF CULVERT IT TO CLOSE TO THE EDGE OF PAVEMENT BY 6" NEED TO MOVE CULVERT 6" TOWARDS THE HOUSE. TALK TO SAM WITH GOLDEN FOX AND WANTS ME TO RESCHEDULE THE PRE POUR FOR TOMORROW 2/1/24 | |||
| ROW- PRE-APRON (PRE-POUR) | 01/31/2024 | PARTIALLY APPROVED | PFLANAGAN |
| Note: OK TO POUR THE RIGHT DRIVEWAY ONLY IF YOU ARE FACE THE HOUSE FROM THE STREET. LEFT DRIVEWAY LEFT SIDE OF CULVERT IT TO CLOSE TO THE EDGE OF PAVEMENT BY 6" NEED TO MOVE CULVERT 6" TOWARDS THE HOUSE. TALK TO SAM WITH GOLDEN FOX AND WANTS ME TO RESCHEDULE THE PRE POUR FOR TOMORROW 2/1/24 | |||
| ELECTRIC - EARLY POWER | 01/11/2024 | APPROVED | RSIMS |
| Note: 1/11/24: FPL emailed to release power. | |||
| GRAVITY SEWER TEST | 01/03/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS APPROVED ON 9/14/23 | |||
| U - SEWER TIE IN | 01/03/2024 | APPROVED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 THIS WAS APPROVED ON 9/14/23 | |||
| PEP TANK INSTALLATION REQUEST | 12/18/2023 | APPROVED | BVITALE |
| INSULATION | 12/12/2023 | APPROVED | KSANDOE |
| ALL ROUGH | 12/06/2023 | APPROVED | KSANDOE |
| Note: Swale needs to be maintained clear and free flowing 12/4/2023 - PREVIOUS INSPECTION NOTES 1. Metalic pancake boxes are filled with stucco, must be cleaned out to ensure ground screw and proper bond 2. Ser cable is required to be secured within 12'' of panel 3. Dryer vent has wrong nail plates, Nail plates for mech. duct require the extend 2'' below top plate 4. Dryer vent seam is required to be sealed Stopped inspection not ready | |||
| ALL ROUGH | 12/04/2023 | Disapproved - NO FEE | MKRASKI |
| Note: 1. Metalic pancake boxes are filled with stucco, must be cleaned out to ensure ground screw and proper bond 2. Ser cable is required to be secured within 12'' of panel 3. Dryer vent has wrong nail plates, Nail plates for mech. duct require the extend 2'' below top plate 4. Dryer vent seam is required to be sealed Stopped inspection not ready | |||
| LATH/BRICK/ WATER BARRIER | 11/15/2023 | APPROVED | KSANDOE |
| Note: 11/14/2023 - PREVIOUS INSPECTION NOTES 11/14/23: Only the first of the two deficiencies was resolved. Please have wire lath installed over the exposed water line below the hose bib at the back of the house as previously noted. 11/13/2023 - PREVIOUS INSPECTION NOTES 11/13/23: Unit B: (Right side): Left side of garage below light box where cinder block is drilled & chipped out and Back of the unit at hose bibb requires wire lath. | |||
| LATH/BRICK/ WATER BARRIER | 11/14/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/14/23: Only the first of the two deficiencies was resolved. Please have wire lath installed over the exposed water line below the hose bib at the back of the house as previously noted. 11/13/2023 - PREVIOUS INSPECTION NOTES 11/13/23: Unit B: (Right side): Left side of garage below light box where cinder block is drilled & chipped out and Back of the unit at hose bibb requires wire lath. | |||
| LATH/BRICK/ WATER BARRIER | 11/13/2023 | Disapproved - NO FEE | RSIMS |
| Note: 11/13/23: Unit B: (Right side): Left side of garage below light box where cinder block is drilled & chipped out and Back of the unit at hose bibb requires wire lath. | |||
| FIREWALL FINAL | 11/09/2023 | APPROVED | KSANDOE |
| FIREWALL DRYWALL NAILING | 11/07/2023 | APPROVED | KSANDOE |
| ROOF VALLEY & METAL | 11/02/2023 | APPROVED | KSANDOE |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 10/31/2023 | APPROVED | KSANDOE |
| WALL SHEATHING | 10/27/2023 | APPROVED | KSANDOE |
| FOUND SURVEY APPROVED (OFFICE) | 10/12/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 10/09/2023 | APPROVED | KSANDOE |
| MONOLITHIC SLAB | 09/20/2023 | APPROVED | KSANDOE |
| Note: 9/19/2023 - PREVIOUS INSPECTION NOTES Form boards and excavation for foundation cast in earth is not sufficient to contain and form concrete. Please address | |||
| MONOLITHIC SLAB | 09/19/2023 | Disapproved - NO FEE | KSANDOE |
| Note: Form boards and excavation for foundation cast in earth is not sufficient to contain and form concrete. Please address | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/15/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS APPROVED ON 9/14/23 | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 09/14/2023 | CANCELLED BY APPLICANT | WEB |
| WATER METER INSTALLATION REQUEST | 09/05/2023 | APPROVED | CBOWERMASTER |
| Note: 8/24/2023 12:43:16 PM- PREVIOUS INSPECTION NOTES logs | |||
| WATER METER INSTALLATION REQUEST | 08/23/2023 | Disapproved -FEE REQUIRED | CBOWERMASTER |
| Note: logs |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 10/10/2023 | 10/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 10/10/2023 | 10/10/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/01/2023 | 08/09/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/01/2023 | 08/02/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/31/2023 | 07/31/2023 |
| Note: Released By: JPI | |||
| ZON | HOLD | 07/31/2023 | 08/01/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Flood map panel number incorrect on survey/site plan | |||
| ELEC | COMPLETE | 07/31/2023 | 08/01/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/31/2023 | 08/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | HOLD | 07/19/2023 | 07/19/2023 |
| Note: Held By: JPI 1) Per City Truss Submittal Requirements dated April 15, 2023, provide the truss plan packet signed and sealed by a licensed design professional including a completed shop drawing approval stamp on the truss cover sheet. | |||
| CUSVC | COMPLETE | 07/19/2023 | 07/24/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/19/2023 | 07/21/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Submit a duplex riser diagram that includes all wire sizes and breaker sizes | |||
| ENGIN1 | COMPLETE | 07/19/2023 | 07/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/19/2023 | 07/21/2023 |
| LOCATE | COMPLETE | 07/19/2023 | 07/25/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/19/2023 | 07/21/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/19/2023 | 07/25/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/19/2023 | 07/20/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Address incorrect on plans. Should say pine hill Flood map panel number incorrect on survey/site plan Lot square footage incorrect on survey/site plan | |||
| BADMIN | COMPLETE | 07/19/2023 | 07/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/19/2023 | 08/09/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/12/2024 |
| REINSPECTION FEE | ¤40.00 | 03/12/2024 |
| SURCHARGE FS 533.721 | ¤7.21 | 08/15/2023 |
| SURCHARGE - FS 468.631 | ¤10.82 | 08/15/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/15/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/15/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/15/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/15/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/15/2023 |
| TRANS IMPACT FEE ADMIN | ¤84.36 | 08/15/2023 |
| TRANS IMPACT FEE ADMIN | (¤84.36) | 08/15/2023 |
| SEWER CREDIT | (¤2,294.00) | 08/15/2023 |
| SEWER INSPECTION | ¤25.00 | 08/15/2023 |
| SEWER CAPITAL FACILITY | ¤10,689.64 | 08/15/2023 |
| WATER CAPITAL FACILITY FEE | ¤7,847.76 | 08/15/2023 |
| SITE PLAN 30 | ¤30.00 | 08/15/2023 |
| CONNECTION FEES | ¤2,332.52 | 08/15/2023 |
| FIRE IMPACT FEE ADMIN | ¤25.23 | 08/15/2023 |
| FIRE IMPACT FEE ADMIN | (¤25.23) | 08/15/2023 |
| FC IMPACT FEE EMS | ¤124.00 | 08/15/2023 |
| IMPACT FEE FIRE | ¤841.04 | 08/15/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤436.00 | 08/15/2023 |
| FC IMPACT FEE LIBRARY | ¤536.00 | 08/15/2023 |
| IMPACT FEE PARKS | ¤3,538.30 | 08/15/2023 |
| IMPACT FEE SCHOOL | ¤10,900.00 | 08/15/2023 |
| IMPACT FEE TRANSPORTATION | ¤2,812.00 | 08/15/2023 |
| WATER -IRRIGATION INSPECTION | ¤50.00 | 08/15/2023 |
| PARKS IMPACT FEE ADMIN | ¤106.15 | 08/15/2023 |
| PARKS IMPACT FEE ADMIN | (¤106.15) | 08/15/2023 |
| WATER- TURN ON | ¤50.00 | 08/15/2023 |
| ADJUSTMENT 50% | (¤721.00) | 08/15/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/15/2023 |
| INSPECTION - RESIDENTIAL | ¤1,100.00 | 08/15/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤312.00 | 08/15/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤39,087.29 |