Permit #2023070968
Permit Details
Status: COED
| Parcel Id: 07-11-31-7059-00860-0020 |
| CONDITIONED SPACE: 1696 sqft |
| GARAGE: 690 sqft |
| OPENED PORCH (WITH ROOF) : 242 sqft |
| OPENED PORCH (WITH ROOF) : 28 sqft |
| Total Square Footage: 2656 sqft |
| Block: 00860 |
| Subdivision: - |
| Job Phone: 407-580-2657 |
| Location Address: 29 SEAGOING TR |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/26/2023 |
| NOC: RECORDED |
| Applicant name: GENE WARREN SLONE |
| Owner: TAYLOR MATTHEW K & CAROL LESLIE KORNITSKY H&W |
|
Address 8103 NW 74 AVE TAMARAC, FL 33321 |
| Lot: 0020 |
| Contracted Stated Job Value: ¤480,000.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
FLORIDA GREEN CONSTRUCTION INC.
| Status | Location Address | State License Number | Phone |
| INACTIVE |
870 E RETTA STREET DELEON SPRINGS, FL 32130 |
CBC1260957 (Exp: 08/31/2026) | 407-580-2657 |
Sub Contractors
KERRY DWAIN AYLESWORTH II
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
2820 LEWIS SPEEDWAY ST AUGUSTINE, FL 32084 |
STE B ST AUGUSTINE, FL 32084 |
CAC1820713 (Exp: 08/31/2026) | 904-342-5709 |
JOHN EDWARD GAMBONE
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
15 HARGROVE LN PALM COAST, FL 32137 |
1G PALM COAST, FL 32137 |
EC13006037 (Exp: 08/31/2026) | 386-586-9144 |
JONATHAN M PEARSON
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
209 N FORSYTH ST BUNNELL, FL 32110 |
CFC1425941 (Exp: 08/31/2026) | 386-597-0944 | 386-437-4996 |
OLEG BELINSKIY
| Status | Location Address | State License Number | Phone |
| ACTIVE |
19 PINE CIRCLE DRIVE19 PALM COAST, FL 32167 |
CCC1325974 (Exp: 08/31/2026) | 386-263-7906 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 07/23/2024 | FINAL APPROVED | BTAYLOR |
| Note: 7/22/2024 - PREVIOUS INSPECTION NOTES 7/18/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 3-15-24 1. Silt fence needs to be repaired before next inspection to avoid a failed inspection with a fee. 7-18-24 1. Energy cals do not match. 2. Air handler breaker needs to be a 30 amp. 3. Air handler breaker needs a lock out on it. | |||
| BLD - BUILDING FINAL | 07/22/2024 | CANCELLED BY APPLICANT | BTAYLOR |
| Note: 7/18/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2320 3-15-24 1. Silt fence needs to be repaired before next inspection to avoid a failed inspection with a fee. 7-18-24 1. Energy cals do not match. 2. Air handler breaker needs to be a 30 amp. 3. Air handler breaker needs a lock out on it. | |||
| BLD - BUILDING FINAL | 07/18/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: Inspector Notes from Inspection 2320 3-15-24 1. Silt fence needs to be repaired before next inspection to avoid a failed inspection with a fee. 7-18-24 1. Energy cals do not match. 2. Air handler breaker needs to be a 30 amp. 3. Air handler breaker needs a lock out on it. | |||
| U-CROSS CONNECTION | 07/16/2024 | APPROVED | BWRIGHT |
| U -UTILITY RESIDENTIAL FINAL | 07/15/2024 | FINAL APPROVED | BWRIGHT |
| Note: 7/8/2024 - PREVIOUS INSPECTION NOTES There is no power to the pep tank. | |||
| ROW - STORMWATER FINAL | 07/11/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 7/11/24 REQUIRED CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 7/8/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO CLEAN ALL DIRT OUT OF THE CULVERT. 2) NEED TO REMOVE TRASH AND CONSTRUCTION DEBRIS FROM VACANT LOTS TO THE LEFT AND THE BACK. | |||
| U -UTILITY RESIDENTIAL FINAL | 07/08/2024 | Disapproved - NO FEE | BWRIGHT |
| Note: There is no power to the pep tank. | |||
| ROW - STORMWATER FINAL | 07/08/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO CLEAN ALL DIRT OUT OF THE CULVERT. 2) NEED TO REMOVE TRASH AND CONSTRUCTION DEBRIS FROM VACANT LOTS TO THE LEFT AND THE BACK. | |||
| ROW - FINAL APRON (AFTER POUR) | 07/08/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders and the homowners responsibility to ensure that nothing changes after this Inspection is approved. It will not be on the city if any changes after this inspection. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 07/03/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTIONS MADE WITH THE SLOPE ON THE RIGHT PROPERTY LINE ------------------------------------------------------------ 6/28/2024 - PREVIOUS INSPECTION NOTES THE SLOPE ON THE RIGHT PROPERTY LINE NEED TO BE LESS. CODE STATES YOU NEED 4:1 SLOPE ON IMPROVED LOTS | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 06/28/2024 | APPROVED | PFLANAGAN |
| Note: THE GRADER HAD TO DO A W SWALE DO TO THE HOUSE TO THE RIGHT DIDN'T MAKE A COMMON SWALE ALONG THE VACANT WHEN IT WAS BUILT. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 06/28/2024 | Disapproved - NO FEE | PFLANAGAN |
| Note: THE SLOPE ON THE RIGHT PROPERTY LINE NEED TO BE LESS. CODE STATES YOU NEED 4:1 SLOPE ON IMPROVED LOTS | |||
| U - SEWER TIE IN | 06/07/2024 | APPROVED | MGIBSON |
| ELECTRIC - EARLY POWER | 05/22/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5/17/2024 - PREVIOUS INSPECTION NOTES 5/16/2024 - PREVIOUS INSPECTION NOTES 5-16-23 1. House locked. 5-17-24 1. Outletrs in master bath are not safed off. 5-22-24 1. Emailed FPL at 12:54. | |||
| ELECTRIC - EARLY POWER | 05/17/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5/16/2024 - PREVIOUS INSPECTION NOTES 5-16-23 1. House locked. 5-17-24 1. Outletrs in master bath are not safed off. | |||
| ELECTRIC - EARLY POWER | 05/16/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 5-16-23 1. House locked. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: *** NOTES ADDED BY FSLADISH 5/8/2024 11:30:46 AM *** 5/8/24 PIPE ELEVATION GOOD. CORRECTIONS MADE AT THE TIME OF THIS INSPECTION. READY TO POUR. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 5/7/2024 - PREVIOUS INSPECTION NOTES 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 10:22:53 AM *** 5/6/24 YOU NEED TO HAVE 18" BETWEEN THE FORM BOARD AT THE TOP OF THE MITERED END AND THE CULVERT PIPE AND 9" AT THE BOTTOM OF THE CULVERT PIPE TO THE FORM BOARD. SEE PHOTOS FOR REFERENCE. PIPE WAS GOOD AT THE TIME OF THIS INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/07/2024 | CANCELLED BY APPLICANT | FSLADISH |
| Note: 5/6/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY FSLADISH 5/6/2024 10:22:53 AM *** 5/6/24 YOU NEED TO HAVE 18" BETWEEN THE FORM BOARD AT THE TOP OF THE MITERED END AND THE CULVERT PIPE AND 9" AT THE BOTTOM OF THE CULVERT PIPE TO THE FORM BOARD. SEE PHOTOS FOR REFERENCE. PIPE WAS GOOD AT THE TIME OF THIS INSPECTION. | |||
| ROW- PRE-APRON (PRE-POUR) | 05/06/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: *** NOTES ADDED BY FSLADISH 5/6/2024 10:22:53 AM *** 5/6/24 YOU NEED TO HAVE 18" BETWEEN THE FORM BOARD AT THE TOP OF THE MITERED END AND THE CULVERT PIPE AND 9" AT THE BOTTOM OF THE CULVERT PIPE TO THE FORM BOARD. SEE PHOTOS FOR REFERENCE. PIPE WAS GOOD AT THE TIME OF THIS INSPECTION. | |||
| PEP TANK INSTALLATION REQUEST | 03/27/2024 | APPROVED | CBOWERMASTER |
| LATH/BRICK/ WATER BARRIER | 03/15/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 3-15-24 1. Silt fence needs to be repaired before next inspection to avoid a failed inspection with a fee. | |||
| INSULATION | 02/27/2024 | APPROVED | BTAYLOR |
| ALL ROUGH | 02/20/2024 | APPROVED | BTAYLOR |
| ROOF VALLEY & METAL | 01/22/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 1-16-24 1. Overframing ridge board needs to be strapped down. 2. Overframing rafters need to be strapped to ridge board. | |||
| WALL SHEATHING | 01/16/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 01/16/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 1-16-24 1. Overframing ridge board needs to be strapped down. 2. Overframing rafters need to be strapped to ridge board. | |||
| TIE BEAM / LINTEL | 12/19/2023 | APPROVED | BTAYLOR |
| FOUND SURVEY APPROVED (OFFICE) | 11/16/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/13/2023 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 11/09/2023 | APPROVED | BTAYLOR |
| GRAVITY SEWER TEST | 11/09/2023 | APPROVED | BTAYLOR |
| WATER METER INSTALLATION REQUEST | 10/27/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 07/19/2024 | 07/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/16/2023 | 11/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/16/2023 | 11/16/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/22/2023 | 08/23/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/18/2023 | 08/21/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 08/03/2023 | 08/04/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Bed 3 2nd REQUEST | |||
| ZON | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/03/2023 | 08/04/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| BLD | HOLD | 07/21/2023 | 07/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Complete truss plan packet cover sheet or first page to include the design professional of record (building design engineer or architect) approval stamp indicating acceptance and approval of truss design (Not wet seal) | |||
| CUSVC | COMPLETE | 07/21/2023 | 07/24/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | HOLD | 07/21/2023 | 07/24/2023 |
| Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Need correct outlet spacing NEC 2017 210.52 Bed 3, master bedroom, and exterior back wall with the 4 gang switch. | |||
| ENGIN1 | COMPLETE | 07/21/2023 | 07/21/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/21/2023 | 07/25/2023 |
| LOCATE | COMPLETE | 07/21/2023 | 07/25/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 07/21/2023 | 07/25/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/21/2023 | 07/28/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/21/2023 | 07/25/2023 |
| Note: Held By: SCOTT THOMAS - - STHOMAS@PALMCOASTGOV.COM LANDSCAPE PLAN MISSING (2) FOUNDATION PLANTINGS ON EACH SIDE OF HOME | |||
| SWALE | COMPLETE | 07/21/2023 | 09/11/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 07/22/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 07/17/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 07/17/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 02/09/2024 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 09/26/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 09/26/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 09/26/2023 |
| IMPACT FEE FIRE | ¤420.52 | 09/26/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/26/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/26/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 09/26/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/26/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 09/26/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/26/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 09/26/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 09/26/2023 |
| SURCHARGE FS 533.721 | ¤8.62 | 09/26/2023 |
| SURCHARGE - FS 468.631 | ¤12.93 | 09/26/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/26/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/26/2023 |
| SW ENG PRE APRON | ¤30.00 | 09/26/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/26/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/26/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 09/26/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 09/26/2023 |
| SEWER CREDIT | (¤1,466.00) | 09/26/2023 |
| SEWER INSPECTION | ¤25.00 | 09/26/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 09/26/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 09/26/2023 |
| SITE PLAN 30 | ¤30.00 | 09/26/2023 |
| CONNECTION FEES | ¤1,166.26 | 09/26/2023 |
| WATER- TURN ON | ¤25.00 | 09/26/2023 |
| ADJUSTMENT 50% | (¤862.20) | 09/26/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/26/2023 |
| INSPECTION - RESIDENTIAL | ¤1,320.00 | 09/26/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤374.40 | 09/26/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,409.88 |