Permit #2023071013

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00730-0160
CONDITIONED SPACE: 1903 sqft
GARAGE: 435 sqft
OPENED PORCH (WITH ROOF) : 182 sqft
OPENED PORCH (WITH ROOF) : 70 sqft
Total Square Footage: 2590 sqft
Block: 00730
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 202-494-2019
Location Address: 4 RYMEN LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 09/08/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND 2, LLC

Address

3670 MAGUIRE BLVD STE 220

ORLANDO, FL 32803

Lot: 0160
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 03/27/2024 FINAL APPROVED AGAETANO
Note: 3/26/2024 - PREVIOUS INSPECTION NOTES 03-26-2024 AHU heat label not indicated. Please have AC running for inspection.
ROW - STORMWATER FINAL 03/27/2024 APPROVED PFLANAGAN
Note: CORRECTION MADE FROM LAST INSPECTION ----------------------------------------------------------------------------------------- 3/25/24= REMOVE THE POTTY FROM THE SWALE OR THE ROAD AND PLACE IN THE DRIVEWAY 3/13/2024 - PREVIOUS INSPECTION NOTES ** 03/13/24 BUILDER WILL NEED TO RE-GRADE ACROSS REAR PROPERTY LINE AS INSPECTORS G. BERTOLA AND E. MADISON BOTH INSPECTED THIS PROPERTY . AFTER BOTH REVIEWING YOUR SUBMITTED FINAL SURVEY AND WALKING THIS SITE IT IS DETERMINED YOUR SUBMITTED FINAL SURVEY DOES NOT CAPTURE WHAT IS ACTUALLY IN THE FIELD. YOU WILL NEED TO CREATE A 4:1 SLOPE ACROSS REAR AS CURRENTLY YOU HAVE MORE THAN 8 FT DRAINING INTO THE ADJACENT PROPERTIES TO THE REAR. ** YOU ALSO BE REQUIRED TO SUBMIT A NEW FINAL SURVEY FOR REVIEW ** NEED TO ALSO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ON RIGHT Inspector Notes from Inspection 9465 ** 03/11/24 BEFORE THE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS ARE REQUIRED ** DRAINAGE CONVEYANCE AT 10 FT OFF BACK OF STRUCTURE NEEDS TO BE FIXED HAVING MORE FALL AWAY FROM THE STRUCTURE. ** BACK LEFT CORNER OUTLINED WITH WHITE PAINT NEEDS TO BE RAISED AS CURRENTLY YOUR STORMWATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY IN THE LEFT REAR ____________________________________________________________________________________________________________________
BLD - BUILDING FINAL 03/26/2024 Disapproved - NO FEE AGAETANO
Note: 03-26-2024 AHU heat label not indicated. Please have AC running for inspection.
ROW - FINAL APRON (AFTER POUR) 03/25/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 3/13/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 9465 ** 03/11/24 BEFORE THE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS ARE REQUIRED ** DRAINAGE CONVEYANCE AT 10 FT OFF BACK OF STRUCTURE NEEDS TO BE FIXED HAVING MORE FALL AWAY FROM THE STRUCTURE. ** BACK LEFT CORNER OUTLINED WITH WHITE PAINT NEEDS TO BE RAISED AS CURRENTLY YOUR STORMWATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY IN THE LEFT REAR ____________________________________________________________________________________________________________________
ROW FIELD SURVEY /GRADING CERTIFICATION 03/25/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 3/22/2024 - PREVIOUS INSPECTION NOTES 03/22/24 FINAL SURVEY MUST PASS BEFORE FIELD SURVEY CAN BE SCHEDULED ----------------------------------------------------------------------------------------- 3/19/2024 - PREVIOUS INSPECTION NOTES ** 03/19/24 BUILDER WILL NEED TO RE-SUBMIT A NEW FINAL SURVEY THAT CAPTURE ALL CHANGES MADE TO GRADE OF TGIS PROPERTY, BEFORE THE FIELD SURVEY CAN BE RESULTED
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/25/2024 APPROVED GBERTOLA
Note: 3/25/24=AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR 3/22/2024 - PREVIOUS INSPECTION NOTES 03/22/24 IN THE LAST 3 SURVEYS THE NUMBERS OFF THE BACK OF THE STRUCTURE HAVE NOT MET CITY REQUIREMENTS. THERE MUST BE AT LEAST 6" FALL IN THE FIRST 10' OFF THE BACK OF THE STRUCTURE. PLEASE MAKE CORRECTIONS IN FIELD AS WELL AS ON TYHE SURVEY. Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 3/13/2024 2:56:08 PM- PREVIOUS INSPECTION NOTES ** 03/13/24 SEE NOTES FROM TODAYS ROW FINAL
ROW FIELD SURVEY /GRADING CERTIFICATION 03/22/2024 Disapproved - NO FEE TPOLACEK
Note: 03/22/24 FINAL SURVEY MUST PASS BEFORE FIELD SURVEY CAN BE SCHEDULED ----------------------------------------------------------------------------------------- 3/19/2024 - PREVIOUS INSPECTION NOTES ** 03/19/24 BUILDER WILL NEED TO RE-SUBMIT A NEW FINAL SURVEY THAT CAPTURE ALL CHANGES MADE TO GRADE OF TGIS PROPERTY, BEFORE THE FIELD SURVEY CAN BE RESULTED
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/22/2024 Disapproved - NO FEE TPOLACEK
Note: 03/22/24 IN THE LAST 3 SURVEYS THE NUMBERS OFF THE BACK OF THE STRUCTURE HAVE NOT MET CITY REQUIREMENTS. THERE MUST BE AT LEAST 6" FALL IN THE FIRST 10' OFF THE BACK OF THE STRUCTURE. PLEASE MAKE CORRECTIONS IN FIELD AS WELL AS ON TYHE SURVEY. Sec 300, Drawing 300.D, Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’ 3/13/2024 2:56:08 PM- PREVIOUS INSPECTION NOTES ** 03/13/24 SEE NOTES FROM TODAYS ROW FINAL
ROW FIELD SURVEY /GRADING CERTIFICATION 03/19/2024 Disapproved - NO FEE EMADISON
Note: ** 03/19/24 BUILDER WILL NEED TO RE-SUBMIT A NEW FINAL SURVEY THAT CAPTURE ALL CHANGES MADE TO GRADE OF TGIS PROPERTY, BEFORE THE FIELD SURVEY CAN BE RESULTED
ROW- PROJECT STATUS 03/15/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED.
ROW - FINAL APRON (AFTER POUR) 03/13/2024 Disapproved - NO FEE EMADISON
Note: Inspector Notes from Inspection 9465 ** 03/11/24 BEFORE THE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS ARE REQUIRED ** DRAINAGE CONVEYANCE AT 10 FT OFF BACK OF STRUCTURE NEEDS TO BE FIXED HAVING MORE FALL AWAY FROM THE STRUCTURE. ** BACK LEFT CORNER OUTLINED WITH WHITE PAINT NEEDS TO BE RAISED AS CURRENTLY YOUR STORMWATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY IN THE LEFT REAR ____________________________________________________________________________________________________________________
BLD - BUILDING FINAL 03/13/2024 CANCELLED BY APPLICANT WEB
U-CROSS CONNECTION 03/13/2024 APPROVED - AS NOTED LFITZGERALD
Note: no irr-no cross connection
ROW - STORMWATER FINAL 03/13/2024 Disapproved - NO FEE EMADISON
Note: ** 03/13/24 BUILDER WILL NEED TO RE-GRADE ACROSS REAR PROPERTY LINE AS INSPECTORS G. BERTOLA AND E. MADISON BOTH INSPECTED THIS PROPERTY . AFTER BOTH REVIEWING YOUR SUBMITTED FINAL SURVEY AND WALKING THIS SITE IT IS DETERMINED YOUR SUBMITTED FINAL SURVEY DOES NOT CAPTURE WHAT IS ACTUALLY IN THE FIELD. YOU WILL NEED TO CREATE A 4:1 SLOPE ACROSS REAR AS CURRENTLY YOU HAVE MORE THAN 8 FT DRAINING INTO THE ADJACENT PROPERTIES TO THE REAR. ** YOU ALSO BE REQUIRED TO SUBMIT A NEW FINAL SURVEY FOR REVIEW ** NEED TO ALSO REMOVE THE PORT-A-JOHN FROM THE ROAD SIDE SWALE ON RIGHT Inspector Notes from Inspection 9465 ** 03/11/24 BEFORE THE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS ARE REQUIRED ** DRAINAGE CONVEYANCE AT 10 FT OFF BACK OF STRUCTURE NEEDS TO BE FIXED HAVING MORE FALL AWAY FROM THE STRUCTURE. ** BACK LEFT CORNER OUTLINED WITH WHITE PAINT NEEDS TO BE RAISED AS CURRENTLY YOUR STORMWATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY IN THE LEFT REAR ____________________________________________________________________________________________________________________
U -UTILITY RESIDENTIAL FINAL 03/13/2024 FINAL APPROVED LFITZGERALD
ROW FIELD SURVEY /GRADING CERTIFICATION 03/12/2024 Disapproved - NO FEE EMADISON
Note: 03/13/24 SEE NOTES FROM TODAYS ROW FINAL ** 03/11/24 BEFORE THE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS ARE REQUIRED ** DRAINAGE CONVEYANCE AT 10 FT OFF BACK OF STRUCTURE NEEDS TO BE FIXED HAVING MORE FALL AWAY FROM THE STRUCTURE. ** BACK LEFT CORNER OUTLINED WITH WHITE PAINT NEEDS TO BE RAISED AS CURRENTLY YOUR STORMWATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY IN THE LEFT REAR ____________________________________________________________________________________________________________________
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/11/2024 Disapproved - NO FEE EMADISON
Note: Inspector Notes from Inspection 9465 ** 03/11/24 BEFORE THE ROW FINAL IS APPROVED THE FOLLOWING CORRECTIONS ARE REQUIRED ** DRAINAGE CONVEYANCE AT 10 FT OFF BACK OF STRUCTURE NEEDS TO BE FIXED HAVING MORE FALL AWAY FROM THE STRUCTURE. ** BACK LEFT CORNER OUTLINED WITH WHITE PAINT NEEDS TO BE RAISED AS CURRENTLY YOUR STORMWATER WILL NEGATIVELY IMPACT THE ADJACENT PROPERTY IN THE LEFT REAR ____________________________________________________________________________________________________________________
ROW- PROJECT STATUS 03/08/2024 APPROVED PFLANAGAN
Note: MEET WITH GRADE GUY AND BILL WITH INB FOR THE GRADE OFF THE BACK OF HOUSE GRADING NEEDS TO BE DONE
ROW- FINAL SURVEY/GRADING CERTIFICATION 03/01/2024 Disapproved - NO FEE PFLANAGAN
Note: YOU DO NOT HAVE THE MINIMUM OF FALL OFF THE BACK OF THE HOUSE. Florida Building Code, Residential, Chapter 4, R401.3F Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.
ROW- PRE-APRON (PRE-POUR) 02/13/2024 APPROVED - AS NOTED FSLADISH
Note: 2/13/24 PIPE IS GOOD. LET BILL CM KNOW TO MAKE SURE ANY WATER IS OUT OF THE POUR AREA AND MITERED END FOOTERS ARE DUG OUT TO COPC 6" X 6" SPECS IF ANY DIRT HAS WASHED IN. APPROVING THIS PREPOUR AS NOTED .. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
U - SEWER TIE IN 02/08/2024 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE 6'' FERNCO FROM FOOTER AT EXIT OF MAIN SEWER DRAIN, AND PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION
GRAVITY SEWER TEST 02/08/2024 APPROVED MGIBSON
Note: Inspector Notes from Inspection 2060 REMOVE 6'' FERNCO FROM FOOTER AT EXIT OF MAIN SEWER DRAIN, AND PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION
ELECTRIC - EARLY POWER 01/19/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2200 Toilet facilities will need to be cleaned prior to any further inspections.
PEP TANK INSTALLATION REQUEST 01/10/2024 APPROVED BVITALE
Note: 1/5/2024 3:00:13 PM- PREVIOUS INSPECTION NOTES DUMPSTER IS IN THE WAY-NEEDS TO BE REMOVED
PEP TANK INSTALLATION REQUEST 01/05/2024 Disapproved -FEE REQUIRED TCHURCHILL
Note: DUMPSTER IS IN THE WAY-NEEDS TO BE REMOVED
LATH/BRICK/ WATER BARRIER 12/22/2023 APPROVED JWALKER
INSULATION 12/19/2023 APPROVED JWALKER
ELECTRIC-TUG 12/15/2023 APPROVED - AS NOTED JWALKER
Note: Toilet facilities will need to be cleaned prior to any further inspections.
ALL ROUGH 12/14/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/12/2023 APPROVED JWALKER
Note: 12/6/2023 - PREVIOUS INSPECTION NOTES 12/6/23: Not Fully resolved. 1). (2) HJ03 trusses still missing anchors 2). Truss T 26 only has 1 of 2 truss plates installed & the installed plate does not extend fully across block. Still missing vapor barrier on 2" x 12"s 3). Remains unresolved. 4). Middle truss web repair does not meet MiTek requirements. 5). Remains unresolved. 12/4/2023 - PREVIOUS INSPECTION NOTES Front entry: 1. Truss T-25, (2) HJO3, and The CJ trusses all missing hold down anchors. 2. All trusses and the 2 x 12 beams are to be place on a truss plate or have a moisture barrier where the lumber comes in contact with the CMU. Installed moisture barriers check all areas at the front entry. 3. The T-28 and (3) T-29 truss left side H10A truss anchors are concealed cannot see attachment to the beam. 4. The center truss T-29 at the front entry has a broken web member and will need to be repaired as per the mitek broken web repair engineering. 5. The 2x12 beam where it land on the CMU wall left side of the front entry door opening missing hold down anchors.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/06/2023 Disapproved -FEE REQUIRED RSIMS
Note: 12/6/23: Not Fully resolved. 1). (2) HJ03 trusses still missing anchors 2). Truss T 26 only has 1 of 2 truss plates installed & the installed plate does not extend fully across block. Still missing vapor barrier on 2" x 12"s 3). Remains unresolved. 4). Middle truss web repair does not meet MiTek requirements. 5). Remains unresolved. 12/4/2023 - PREVIOUS INSPECTION NOTES Front entry: 1. Truss T-25, (2) HJO3, and The CJ trusses all missing hold down anchors. 2. All trusses and the 2 x 12 beams are to be place on a truss plate or have a moisture barrier where the lumber comes in contact with the CMU. Installed moisture barriers check all areas at the front entry. 3. The T-28 and (3) T-29 truss left side H10A truss anchors are concealed cannot see attachment to the beam. 4. The center truss T-29 at the front entry has a broken web member and will need to be repaired as per the mitek broken web repair engineering. 5. The 2x12 beam where it land on the CMU wall left side of the front entry door opening missing hold down anchors.
ROOF VALLEY & METAL 12/04/2023 APPROVED JWALKER
WALL SHEATHING 12/04/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 12/04/2023 Disapproved - NO FEE JWALKER
Note: Front entry: 1. Truss T-25, (2) HJO3, and The CJ trusses all missing hold down anchors. 2. All trusses and the 2 x 12 beams are to be place on a truss plate or have a moisture barrier where the lumber comes in contact with the CMU. Installed moisture barriers check all areas at the front entry. 3. The T-28 and (3) T-29 truss left side H10A truss anchors are concealed cannot see attachment to the beam. 4. The center truss T-29 at the front entry has a broken web member and will need to be repaired as per the mitek broken web repair engineering. 5. The 2x12 beam where it land on the CMU wall left side of the front entry door opening missing hold down anchors.
FOUND SURVEY APPROVED (OFFICE) 12/01/2023 APPROVED TBAKER
TIE BEAM / LINTEL 11/13/2023 APPROVED JWALKER
MONOLITHIC SLAB 11/02/2023 APPROVED JWALKER
Note: 11/1/2023 - PREVIOUS INSPECTION NOTES 1. Page S-2.0 of the plans are missing. Please have a full set of plans onsite for all inspections. 2. UFER ground is not installed. 3. Minimum depth of the slab is to be 4" thick. See plans. Test string lines left in place. Remove and tamp excess soil and reistall string lines.
MONOLITHIC SLAB 11/01/2023 Disapproved - NO FEE JWALKER
Note: 1. Page S-2.0 of the plans are missing. Please have a full set of plans onsite for all inspections. 2. UFER ground is not installed. 3. Minimum depth of the slab is to be 4" thick. See plans. Test string lines left in place. Remove and tamp excess soil and reistall string lines.
PLUMBING 1ST ROUGH UNDERGROUND 10/26/2023 APPROVED - AS NOTED MGIBSON
Note: REMOVE 6'' FERNCO FROM FOOTER AT EXIT OF MAIN SEWER DRAIN, AND PROVIDE PORTABLE RESTROOM BEFORE SLAB INSPECTION
PLUMBING 1ST ROUGH UNDERGROUND 10/20/2023 CANCELLED BY APPLICANT WEB
WATER METER INSTALLATION REQUEST 10/04/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 03/14/2024 03/14/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 01/24/2024 01/25/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 12/01/2023 12/01/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 12/01/2023 12/01/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ENGIN1 HOLD 10/25/2023 10/25/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unaaceptable as foundation survey. Please submit Foundation Survey showing location, dimensions and elevation of finished concrete foundation/slab.
ZON COMPLETE 10/25/2023 10/25/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/03/2023 08/03/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
BLD COMPLETE 08/03/2023 08/07/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 07/24/2023 07/27/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
CUSVC COMPLETE 07/24/2023 07/24/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/24/2023 07/25/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/24/2023 07/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/24/2023 07/25/2023
LOCATE COMPLETE 07/24/2023 07/25/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/24/2023 07/25/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/24/2023 07/31/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 07/24/2023 07/26/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Elevation page: Add banding to garage as it faces the right of way
SWALE COMPLETE 07/24/2023 09/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BADMIN COMPLETE 07/24/2023 08/07/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 03/25/2024
UTILITY PEP REINSPECTION ¤40.00 03/15/2024
SW ENG REINSPECTION 20 ¤20.00 03/15/2024
REINSPECTION RESIDENTIAL ¤40.00 03/15/2024
CONNECTION FEES ¤1,166.26 09/08/2023
FIRE IMPACT FEE ADMIN ¤12.62 09/08/2023
FIRE IMPACT FEE ADMIN (¤12.62) 09/08/2023
FC IMPACT FEE EMS ¤62.00 09/08/2023
IMPACT FEE FIRE ¤420.52 09/08/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 09/08/2023
FC IMPACT FEE LIBRARY ¤268.00 09/08/2023
IMPACT FEE PARKS ¤1,769.15 09/08/2023
IMPACT FEE SCHOOL ¤5,450.00 09/08/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 09/08/2023
WATER -IRRIGATION INSPECTION ¤25.00 09/08/2023
PARKS IMPACT FEE ADMIN ¤53.07 09/08/2023
PARKS IMPACT FEE ADMIN (¤53.07) 09/08/2023
SURCHARGE FS 533.721 ¤4.37 09/08/2023
SURCHARGE - FS 468.631 ¤6.55 09/08/2023
SW ENG - FOUNDATION SURVEY ¤20.00 09/08/2023
SW ENG INSPECTION 80 ¤80.00 09/08/2023
SW ENG PRE APRON ¤30.00 09/08/2023
SEWER CREDIT (¤1,342.00) 09/08/2023
SEWER INSPECTION ¤25.00 09/08/2023
SEWER CAPITAL FACILITY ¤5,344.82 09/08/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 09/08/2023
SITE PLAN 30 ¤30.00 09/08/2023
SW ENG - REVIEW 20 ¤20.00 09/08/2023
SW ENG RES REVIEW 200 ¤200.00 09/08/2023
TRANS IMPACT FEE ADMIN ¤54.36 09/08/2023
TRANS IMPACT FEE ADMIN (¤54.36) 09/08/2023
WATER- TURN ON ¤25.00 09/08/2023
ADJUSTMENT 50% (¤436.84) 09/08/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 09/08/2023
INSPECTION - RESIDENTIAL ¤657.25 09/08/2023
PLAN REVIEW - RESIDENTIAL ¤186.42 09/08/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,115.38