Permit #2023071028

Permit Details

Status: COED

Parcel Id: 07-11-31-7029-00520-0160
CONDITIONED SPACE: 1650 sqft
GARAGE: 396 sqft
OPENED PORCH (WITH ROOF) : 100 sqft
OPENED PORCH (WITH ROOF) : 19 sqft
Total Square Footage: 2165 sqft
Block: 00520
Subdivision: 2209 - SECTION 29-ROYAL PALMS
Job Phone: 202-494-2019
Location Address: 1 RYKER LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/25/2023
NOC: RECORDED
Applicant name: GARY ANDREW FISCHER
Owner: INB FUND2 LLC

Address

3670 MAGUIRE BLVD SUITE 220

ORLANDO, FL 32803

Lot: 0160
Contracted Stated Job Value: ¤175,000.00
Job Description: SINGLE FAMILY RESIDENCE
Type: CN

Contractor

INB HOMES
Status Location Address Mailing Address State License Number Phone
ACTIVE

3670 MAGUIRE BLVD

ORLANDO, FL 32803

SUITE 210

ORLANDO, FL 32803

CGC048746 (Exp: 08/31/2026) 407-476-8195

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
HEATH EDWARD SANFORD
Status Location Address State License Number Phone
ACTIVE

126 EAST END RD

SAN MATEO, FL 32187

CFC1429896 (Exp: 08/31/2026) 386-871-8823
TERRY BRICE DICKERSON
Status Location Address State License Number Phone
ACTIVE

4300 ST JOHN'S PARKWAY

ALPHARETTA, GA 30009

CCC1326209 (Exp: 08/31/2026) 407-548-6733
JOSEPH C WRIGHT
Status Location Address Mailing Address State License Number Phone Fax
ACTIVE

15 HARGROVE LANE

PALM COAST, FL 32137

UNIT 3 D

PALM COAST, FL 32137

EC13003278 (Exp: 08/31/2026) 386-447-9644 386-447-9633

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/14/2024 FINAL APPROVED JWALKER
Note: 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 Item 2 has not been corrected. 2/9/2024 - PREVIOUS INSPECTION NOTES 1. Energy calculation are not matching the HVAC units installed. 2. Heat accessory label has not been marked off. Unable to verify circuit breaker size.
BLD - BUILDING FINAL 02/13/2024 Disapproved - NO FEE JWALKER
Note: 2/13/24 Item 2 has not been corrected. 2/9/2024 - PREVIOUS INSPECTION NOTES 1. Energy calculation are not matching the HVAC units installed. 2. Heat accessory label has not been marked off. Unable to verify circuit breaker size.
ROW - STORMWATER FINAL 02/09/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
BLD - BUILDING FINAL 02/09/2024 Disapproved - NO FEE JWALKER
Note: 1. Energy calculation are not matching the HVAC units installed. 2. Heat accessory label has not been marked off. Unable to verify circuit breaker size.
U-CROSS CONNECTION 02/08/2024 APPROVED - AS NOTED JHARDING
Note: No irrigation, no cross connections.
U -UTILITY RESIDENTIAL FINAL 02/08/2024 FINAL APPROVED JHARDING
ROW - FINAL APRON (AFTER POUR) 02/07/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/07/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ROW FIELD SURVEY /GRADING CERTIFICATION 02/07/2024 APPROVED PFLANAGAN
Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
ELECTRIC - EARLY POWER 01/11/2024 APPROVED RMARTIN
ROW- PRE-APRON (PRE-POUR) 12/20/2023 APPROVED PFLANAGAN
Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved.
U - SEWER TIE IN 12/19/2023 APPROVED MGIBSON
GRAVITY SEWER TEST 12/19/2023 APPROVED MGIBSON
PEP TANK INSTALLATION REQUEST 11/30/2023 APPROVED CBOWERMASTER
LATH/BRICK/ WATER BARRIER 11/28/2023 APPROVED JWALKER
INSULATION 11/20/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 Rear left bedroom hallway smoke detector outlet has not been wired. Check for correction at Insulation inspection.
ALL ROUGH 11/17/2023 APPROVED - AS NOTED JWALKER
Note: Rear left bedroom hallway smoke detector outlet has not been wired. Check for correction at Insulation inspection.
ELECTRIC-TUG 11/15/2023 APPROVED JWALKER
Note: 11/14/2023 - PREVIOUS INSPECTION NOTES Conduit to protect service wire is to be schedule 80.
ELECTRIC-TUG 11/14/2023 Disapproved - NO FEE JWALKER
Note: Conduit to protect service wire is to be schedule 80.
ROOF VALLEY & METAL 11/08/2023 APPROVED JWALKER
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/02/2023 APPROVED - AS NOTED JWALKER
Note: 1.Rear column to beam connection calls for 4 HTS20 hold down anchors with a minimum of 24 fasteners per anchor. See detail G. Heta 20's have been used and not installed as per simpson instructions. Heata must be within a 1/4". Heta's used have been bent. Install HTS20 as detailed. 2. Truss T06,T07 and T14 the engineering has not been installed. Continous later bracing requires a minimum of 3 trusses. See the SBCA for truss requirements. Check for above listed corrections at ALL ROUGH inspection.
WALL SHEATHING 11/01/2023 APPROVED JWALKER
ROOF SHEATHING 11/01/2023 APPROVED JWALKER
FOUND SURVEY APPROVED (OFFICE) 10/27/2023 APPROVED TBAKER
TIE BEAM / LINTEL 10/23/2023 APPROVED JWALKER
Note: 10/20/2023 - PREVIOUS INSPECTION NOTES The rear covered porch column calls for tow dowels and down rods see detail 10 on page 2.0 of the prints.
TIE BEAM / LINTEL 10/20/2023 Disapproved - NO FEE JWALKER
Note: The rear covered porch column calls for tow dowels and down rods see detail 10 on page 2.0 of the prints.
MONOLITHIC SLAB 10/11/2023 APPROVED JWALKER
Note: 10/10/2023 - PREVIOUS INSPECTION NOTES 10/10/23: Inspection stopped. ** No termite certificate in box or on-site.
MONOLITHIC SLAB 10/10/2023 Disapproved - NO FEE RSIMS
Note: 10/10/23: Inspection stopped. ** No termite certificate in box or on-site.
PLUMBING 1ST ROUGH UNDERGROUND 10/09/2023 APPROVED JWALKER
WATER METER INSTALLATION REQUEST 09/13/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
MECH COMPLETE 02/09/2024 02/09/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/27/2023 10/27/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 10/27/2023 10/27/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 08/01/2023 08/01/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 07/24/2023 07/26/2023
Note: Released By: JPI
CUSVC COMPLETE 07/24/2023 07/24/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 07/24/2023 07/25/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 07/24/2023 07/24/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 07/24/2023 07/25/2023
LOCATE COMPLETE 07/24/2023 07/26/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 07/24/2023 07/25/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 07/24/2023 07/31/2023
Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM
ZON HOLD 07/24/2023 07/26/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Additional tree required for this lot size All windows and doors facing a right of way must have banding placed around them
BADMIN COMPLETE 07/24/2023 07/27/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
SWALE COMPLETE 07/24/2023 09/12/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
WATER- TURN ON ¤25.00 08/25/2023
ADJUSTMENT 50% (¤375.06) 08/25/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/25/2023
INSPECTION - RESIDENTIAL ¤561.00 08/25/2023
PLAN REVIEW - RESIDENTIAL ¤159.12 08/25/2023
CONNECTION FEES ¤1,166.26 08/25/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/25/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/25/2023
FC IMPACT FEE EMS ¤62.00 08/25/2023
IMPACT FEE FIRE ¤420.52 08/25/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/25/2023
FC IMPACT FEE LIBRARY ¤268.00 08/25/2023
IMPACT FEE PARKS ¤1,769.15 08/25/2023
IMPACT FEE SCHOOL ¤5,450.00 08/25/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 08/25/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/25/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/25/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/25/2023
SURCHARGE FS 533.721 ¤3.75 08/25/2023
SURCHARGE - FS 468.631 ¤5.63 08/25/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/25/2023
SW ENG INSPECTION 80 ¤80.00 08/25/2023
SW ENG PRE APRON ¤30.00 08/25/2023
SW ENG - REVIEW 20 ¤20.00 08/25/2023
SW ENG RES REVIEW 200 ¤200.00 08/25/2023
TRANS IMPACT FEE ADMIN (¤54.36) 08/25/2023
TRANS IMPACT FEE ADMIN ¤54.36 08/25/2023
SEWER CREDIT (¤1,466.00) 08/25/2023
SEWER INSPECTION ¤25.00 08/25/2023
SEWER CAPITAL FACILITY ¤5,344.82 08/25/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 08/25/2023
SITE PLAN 30 ¤30.00 08/25/2023
Fees Total Due: ¤0.00 Total Paid: ¤19,808.07