I want to search for...
Permit #2023071082
Permit Details
Status: FINAL
| Parcel Id: 07-11-31-7002-00080-0090 |
| Block: 00080 |
| Subdivision: 2218 - SECTION 2-FLORIDA PARK |
| Job Phone: 813-418-0830 |
| Location Address: 11 FERNHAM LN |
| Type: BA - BUILDING ADDITION |
| Issue Date: 08/08/2023 |
| NOC: RECORDED |
| Applicant name: ELLA JOANN HEBBLEWHITE |
| Owner: WILLARD CLINT & JENNY LYNN BRUCE JTWROS |
|
Address 11 FERNHAM LANE PALM COAST, FL 32137 |
| Lot: 0090 |
| Contracted Stated Job Value: ¤10,000.00 |
| Job Description: PATIO ROOF |
| Type: CN |
Contractor
A-TEAM EXTERIORS, INC
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3750 GUNN HWY TAMPA, FL 33618 |
STE 103 TAMPA, FL 33618 |
CBC1254370 (Exp: 08/31/2026) | 813-418-0830 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/05/2024 | APPROVED | AWATERS |
| Note: 3/15/2024 - PREVIOUS INSPECTION NOTES 1/23/2024 - PREVIOUS INSPECTION NOTES 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23: Need a revision submitted to & approved by the City for the engineered plan details to match the field install conditions as they do not match any of the original plan details submitted. 9/22/2023 - PREVIOUS INSPECTION NOTES 09-22-2023 DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 01-23-2024 1. As per Josh the revision for the extension is not needed. The permit is open until March. 2. Back of flashing at roof is split open. Check all areas. Tape on flashing is not sealed properly. Holes in flashing. Superintendent and homeowner on site. 03-15-2024 1. A couple areas on roof at flashing not sealed properly and completely. . 2. Approved documents not on site. | |||
| BLD - BUILDING FINAL | 03/15/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/23/2024 - PREVIOUS INSPECTION NOTES 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23: Need a revision submitted to & approved by the City for the engineered plan details to match the field install conditions as they do not match any of the original plan details submitted. 9/22/2023 - PREVIOUS INSPECTION NOTES 09-22-2023 DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 01-23-2024 1. As per Josh the revision for the extension is not needed. The permit is open until March. 2. Back of flashing at roof is split open. Check all areas. Tape on flashing is not sealed properly. Holes in flashing. Superintendent and homeowner on site. 03-15-2024 1. A couple areas on roof at flashing not sealed properly and completely. . 2. Approved documents not on site. 3. Gutter has been filled with caulking. Possible restricting flow of water to downspouts. 4. Flashing does not appesr to be screwed to wall. 5. Unable to determine if gutter is existing or a new structural gutter. If gutter is new please provide detail of new gutter. Inspection stopped. | |||
| BLD - BUILDING FINAL | 01/23/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 11/3/2023 - PREVIOUS INSPECTION NOTES 11/3/23: Need a revision submitted to & approved by the City for the engineered plan details to match the field install conditions as they do not match any of the original plan details submitted. 9/22/2023 - PREVIOUS INSPECTION NOTES 09-22-2023 DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL 01-23-2024 1. As per Josh the revision for the extension is not needed. The permit is open until March. 2. Back of flashing at roof is split open. Check all areas. Tape on flashing is not sealed properly. Holes in flashing. Superintendent and homeowner on site. | |||
| BLD - BUILDING FINAL | 11/03/2023 | Disapproved -FEE REQUIRED | RSIMS |
| Note: 11/3/23: Need a revision submitted to & approved by the City for the engineered plan details to match the field install conditions as they do not match any of the original plan details submitted. 9/22/2023 - PREVIOUS INSPECTION NOTES 09-22-2023 DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| BLD - BUILDING FINAL | 09/22/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 09-22-2023 DOCUMENTS MUST BE APPROVED AND KEPT ON SITE 107.3,1. AND SHALL BE OPEN TO INSPECTION BY THE BUILDING OFFICIAL | |||
| ROW - FINAL INSPECTION | 09/22/2023 | FINAL APPROVED | EMADISON |
| U -UTILITY RESIDENTIAL FINAL | 09/22/2023 | FINAL APPROVED | DHANEY |
Review History
| Department | Status | Date In | Date Out |
| BADMIN | INFORMATION | 01/17/2024 | 01/17/2024 |
| Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM This permit is active through the end of March, if you should need an extension, please submit one closer to the expiration date. | |||
| BLD | COMPLETE | 11/13/2023 | 11/13/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/27/2023 | 07/27/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/25/2023 | 07/31/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 07/25/2023 | 07/31/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | HOLD | 07/25/2023 | 07/26/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Please provide a survey/site plan showing the patio you are replacing the roof on with dimensions and setbacks. |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤77.50) | 08/08/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/08/2023 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 08/08/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤65.00 | 08/08/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/08/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/08/2023 |
| SW ENG - INSPECTION 20 | ¤20.00 | 08/08/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/08/2023 |
| SITE PLAN 30 | ¤30.00 | 08/08/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤151.50 |