I want to search for...
Permit #2023071095
Permit Details
Status: COED
| Parcel Id: 07-11-31-7035-01470-0060 |
| CONDITIONED SPACE: 1753 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 89 sqft |
| Total Square Footage: 2459 sqft |
| Block: 01470 |
| Subdivision: 2172 - SECTION 35-BELLE TERRE |
| Job Phone: 202-494-2019 |
| Location Address: 14 BIG DIPPER LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/02/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROW - FINAL APRON (AFTER POUR) | 04/17/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/17/24 OVERPOUR REMOVED AS REQUIRED. CUTS MADE. PIPE GOOD. CULVERT CLEAR HOT PATCH COMPLETED AT THE TIME OF THIS INSPECTION. APPROVING AS NOTED. _______________________________________________________________________________________________________________________ 4/16/2024 - PREVIOUS INSPECTION NOTES ** 04/16/24 AS INDICATED IN THE PREVIOUS INSPECTION ON 04/12/24 CORRECTION STILL NEEDS TO BE DONE ** 4/12/24 YOU NEED TO CUT OUT/REMOVE EXCESS MITERED END OVERPOUR ON LEFT SIDE OUTLINED IN WHITE. _______________________________________________________________________________________________________________________ 4/12/2024 - PREVIOUS INSPECTION NOTES 4/12/24 YOU NEED TO CUT OUT/REMOVE EXCESS MITERED END OVERPOUR ON LEFT SIDE OUTLINED IN WHITE. NEED TO REMOVE DIRT FROM CULVERT. YOU NEED TO MAKE DRIVEWAY EXPANSION CUTS AS REQUIRED BY COPC STANDARDS AND SPECIFICATIONS. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9465 UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 04/17/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/17/24 BERM CORRECTION MADE AND ADDITIONAL OUTLINED AREA ALSO AS REQUIRED IN PREVIOUS INSPECTION. APPROVING AS NOTED THAT AT THE TIME OF THIS INSPECTION COPC MINIMUM REQUIREMENTS MET. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 4/16/2024 - PREVIOUS INSPECTION NOTES ** 04/16/24 LEFT REAR WHERE PREVIOUS FIELD SURVEY INDICATED YOU NEEDED TO REPAIR AREA OUTLINED W/ WHITE PAINT THE CORRECTION NEEDS TO HAVE COMPACTED MATERIAL AT A MINIMUM OF 3/10ths TO AID PREVENTING YOUR STORMWATER FROM NEGATIVELY IMPACTING THE ADJACENT LOT ON THE LEFT. ALSO NEED TO FIX SECOND AREA ALONG FENCE LINE ALSO MARKED WITH WHITE PAINT ** IN ACCORDANCE WITH DRAWING 300.D FROM THE TECHNICAL MANUAL THE FINISHED GRADE AT THE EDGE OF ROAD NEEDS TO BE 2 INCHES BELOW EDGE OF ROAD BEFORE THE SOD IS LAID. CURRENTLY SOD IS TOO HIGH ON BOTH SIDES OF THE DRIVEWAY WHICH WILL PREVENT WATER FROM SHEDDING OFF ROADWAY CREATING A SAFETY HAZARD | |||
| ROW - STORMWATER FINAL | 04/16/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/16/24 LEFT REAR WHERE PREVIOUS FIELD SURVEY INDICATED YOU NEEDED TO REPAIR AREA OUTLINED W/ WHITE PAINT THE CORRECTION NEEDS TO HAVE COMPACTED MATERIAL AT A MINIMUM OF 3/10ths TO AID PREVENTING YOUR STORMWATER FROM NEGATIVELY IMPACTING THE ADJACENT LOT ON THE LEFT. ALSO NEED TO FIX SECOND AREA ALONG FENCE LINE ALSO MARKED WITH WHITE PAINT ** IN ACCORDANCE WITH DRAWING 300.D FROM THE TECHNICAL MANUAL THE FINISHED GRADE AT THE EDGE OF ROAD NEEDS TO BE 2 INCHES BELOW EDGE OF ROAD BEFORE THE SOD IS LAID. CURRENTLY SOD IS TOO HIGH ON BOTH SIDES OF THE DRIVEWAY WHICH WILL PREVENT WATER FROM SHEDDING OFF ROADWAY CREATING A SAFETY HAZARD | |||
| ROW - FINAL APRON (AFTER POUR) | 04/16/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 04/16/24 AS INDICATED IN THE PREVIOUS INSPECTION ON 04/12/24 CORRECTION STILL NEEDS TO BE DONE ** 4/12/24 YOU NEED TO CUT OUT/REMOVE EXCESS MITERED END OVERPOUR ON LEFT SIDE OUTLINED IN WHITE. _______________________________________________________________________________________________________________________ 4/12/2024 - PREVIOUS INSPECTION NOTES 4/12/24 YOU NEED TO CUT OUT/REMOVE EXCESS MITERED END OVERPOUR ON LEFT SIDE OUTLINED IN WHITE. NEED TO REMOVE DIRT FROM CULVERT. YOU NEED TO MAKE DRIVEWAY EXPANSION CUTS AS REQUIRED BY COPC STANDARDS AND SPECIFICATIONS. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9465 UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| BLD - BUILDING FINAL | 04/16/2024 | FINAL APPROVED | MKRASKI |
| BLD - BUILDING FINAL | 04/15/2024 | Disapproved -FEE REQUIRED | LMILLER |
| Note: 4-15-24 prior notes not resolved 4/12/2024 - PREVIOUS INSPECTION NOTES 4/12/24- Please install Outlet in weather proof outlet by ODU. (exposed wiring). NEC 110.27 Live parts guarded against accidental contact | |||
| ROW - FINAL APRON (AFTER POUR) | 04/12/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 4/12/24 YOU NEED TO CUT OUT/REMOVE EXCESS MITERED END OVERPOUR ON RIGHT SIDE OUTLINED IN WHITE. NEED TO REMOVE DIRT FROM CULVERT. YOU NEED TO MAKE DRIVEWAY EXPANSION CUTS AS REQUIRED BY COPC STANDARDS AND SPECIFICATIONS. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. Inspector Notes from Inspection 9465 UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| BLD - BUILDING FINAL | 04/12/2024 | Disapproved - NO FEE | JSTEWART |
| Note: 4/12/24- Please install Outlet in weather proof outlet by ODU. (exposed wiring). NEC 110.27 Live parts guarded against accidental contact | |||
| U -UTILITY RESIDENTIAL FINAL | 04/12/2024 | FINAL APPROVED | LFITZGERALD |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 04/10/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/10/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: UPON WALKING PROPERTY DETERMINED THERE IS A LOW POINT IN THE RIGHT SIDE SWALE OUTLINED IN WHITE PAINT. LEFT REAR CORNER OF PROPERTY OUTLINED IN WHITE YOU NEED TO MAKE A DEFINED SWALE HERE SO THAT WATER WILL MOVE FROM REAR TO FRONT SWALE AND NOT NEGATIVELY AFFECT ADJOINING PROPERTY OWNER. THERE MAY BE OTHER CORRECTIONS REQUIRED BETWEEN NOW AND FINAL ROW IF FIELD CONDITIONS WARRANT IT. APPROVING THIS AS NOTED AS THESE CORRECTIONS CAN BE DONE WITHOUT MAJOR WORK. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 4/10/24 LOW SPOT (23.10) IN SWALE. COUPLE ANOMOLYS I LOOK AT WILL DETERMINE UPON FIELD SURVEYS ANY CORRECTIONS. APPROVING THIS INSPECTION AS NOTED ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9270 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 04/02/2024 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 03/08/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/8/24 PIPE IS GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION.. BUILDERS RESPONSIBILITY TO DOUBLE CHECK PIPE BEFORE POURING. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ELECTRIC - EARLY POWER | 03/06/2024 | APPROVED | RMARTIN |
| Note: Inspector Notes from Inspection 2200 1/10/24- Authorize release of email to FPL @ 11:57a | |||
| GRAVITY SEWER TEST | 02/28/2024 | APPROVED | MGIBSON |
| U - SEWER TIE IN | 02/28/2024 | APPROVED | MGIBSON |
| PEP TANK INSTALLATION REQUEST | 02/06/2024 | APPROVED | BVITALE |
| INSULATION | 02/01/2024 | APPROVED | FWILLIS |
| Note: 1/26/2024 - PREVIOUS INSPECTION NOTES 1/26/24- Previous Note not rectified......Please obtain a revision of energy calcs (Ufactor, SHGC) for windows and doors installed Dont Match. Will check at Insulation inspection. Inspector Notes from Inspection 2420 1/23/24- Please install NP at Island UG Romex chase. Please obtain a revision of energy calcs (Ufactor, SHGC), and Product approval for windows and doors installed Dont Match. Will check at Insulation inspection. | |||
| INSULATION | 01/26/2024 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 1/26/24- Previous Note not rectified......Please obtain a revision of energy calcs (Ufactor, SHGC) for windows and doors installed Dont Match. Will check at Insulation inspection. Inspector Notes from Inspection 2420 1/23/24- Please install NP at Island UG Romex chase. Please obtain a revision of energy calcs (Ufactor, SHGC), and Product approval for windows and doors installed Dont Match. Will check at Insulation inspection. | |||
| ALL ROUGH | 01/23/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/23/24- Please install NP at Island UG Romex chase. Please obtain a revision of energy calcs (Ufactor, SHGC), and Product approval for windows and doors installed Dont Match. Will check at Insulation inspection. | |||
| LATH/BRICK/ WATER BARRIER | 01/17/2024 | APPROVED | JSTEWART |
| ELECTRIC-TUG | 01/10/2024 | APPROVED - AS NOTED | JSTEWART |
| Note: 1/10/24- Authorize release of email to FPL @ 11:57a | |||
| ROOF VALLEY & METAL | 01/10/2024 | APPROVED | JSTEWART |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/29/2023 | APPROVED | JSTEWART |
| ROW - DRAINAGE | 12/29/2023 | APPROVED | TPOLACEK |
| Note: 12/29/23 CORRECTION WERE MADE AT THE TIME FROM THE TIME OF THE INSPECTION OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. ____________________________________________________________________________________________________________________ 12/28/2023 - PREVIOUS INSPECTION NOTES 12/28/23 NO CORRECTIONS HAVE BEEN MADE. WILL BE BACK TOMORROW FOR NEXT INSPECTION. ____________________________________________________________________________________________________________________ 12/27/2023 - PREVIOUS INSPECTION NOTES Trusses have been delivered but ruts in swale have not been repaired. Next Inspection 12/28/23. Per builder ruts would be repaired after trusses were delivered. 12/22/2023 - PREVIOUS INSPECTION NOTES ** 12/22/23 NO CORRECTIONS HAVE BEEN MADE ART THE TIME OF THIS INSPECTION BUILDER SAID HE WILL CORRECT ON 12/27/23 ** ROAD SIDE SWALE NEEDS TO BE OPENS AND MAINTAINED IF TEMPORARY CULVERT IS INSTALLED INSTALL TO EXTING GRADE TO ALLOW WATER TO FLOW ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE (ROW) ** REMOVE PORT-A-JOHN FROM EDGE OF ROAD / ROW PUT ONTO SITE ** BUILDER ALSO INDICATED HE WILL BE REPAIRING THE SWALE ON THE TURN ACROSS FROM 20 BIG DIPPER LN AS HIS DELIVERY TRUCKS AND CONSTRUCTION VEHICLES HAD DAMAGED THE ROW ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/27/23 ____________________________________________________________________________________________________________________ 12/6/2023 - PREVIOUS INSPECTION NOTES rjg. Major damage to the swales by concrete and other trucks from this new build. Reported by house 19 who was a witness to the damage. Major damage to swales to be repaired by INB homes from this construction project. Per Frankie with INB, this will be fixed after Monday 12/11. Last big truck to deliver. Drainage insepction scheduled for 12/22/23 to make sure the rutts were repaired. | |||
| ROW - DRAINAGE | 12/28/2023 | Disapproved -FEE REQUIRED | TPOLACEK |
| Note: 12/28/23 NO CORRECTIONS HAVE BEEN MADE. WILL BE BACK TOMORROW FOR NEXT INSPECTION. ____________________________________________________________________________________________________________________ 12/27/2023 - PREVIOUS INSPECTION NOTES Trusses have been delivered but ruts in swale have not been repaired. Next Inspection 12/28/23. Per builder ruts would be repaired after trusses were delivered. 12/22/2023 - PREVIOUS INSPECTION NOTES ** 12/22/23 NO CORRECTIONS HAVE BEEN MADE ART THE TIME OF THIS INSPECTION BUILDER SAID HE WILL CORRECT ON 12/27/23 ** ROAD SIDE SWALE NEEDS TO BE OPENS AND MAINTAINED IF TEMPORARY CULVERT IS INSTALLED INSTALL TO EXTING GRADE TO ALLOW WATER TO FLOW ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE (ROW) ** REMOVE PORT-A-JOHN FROM EDGE OF ROAD / ROW PUT ONTO SITE ** BUILDER ALSO INDICATED HE WILL BE REPAIRING THE SWALE ON THE TURN ACROSS FROM 20 BIG DIPPER LN AS HIS DELIVERY TRUCKS AND CONSTRUCTION VEHICLES HAD DAMAGED THE ROW ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/27/23 ____________________________________________________________________________________________________________________ 12/6/2023 - PREVIOUS INSPECTION NOTES rjg. Major damage to the swales by concrete and other trucks from this new build. Reported by house 19 who was a witness to the damage. Major damage to swales to be repaired by INB homes from this construction project. Per Frankie with INB, this will be fixed after Monday 12/11. Last big truck to deliver. Drainage insepction scheduled for 12/22/23 to make sure the rutts were repaired. | |||
| ROW - DRAINAGE | 12/27/2023 | Disapproved -FEE REQUIRED | RGROSS |
| Note: Trusses have been delivered but ruts in swale have not been repaired. Next Inspection 12/28/23. Per builder ruts would be repaired after trusses were delivered. 12/22/2023 - PREVIOUS INSPECTION NOTES ** 12/22/23 NO CORRECTIONS HAVE BEEN MADE ART THE TIME OF THIS INSPECTION BUILDER SAID HE WILL CORRECT ON 12/27/23 ** ROAD SIDE SWALE NEEDS TO BE OPENS AND MAINTAINED IF TEMPORARY CULVERT IS INSTALLED INSTALL TO EXTING GRADE TO ALLOW WATER TO FLOW ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE (ROW) ** REMOVE PORT-A-JOHN FROM EDGE OF ROAD / ROW PUT ONTO SITE ** BUILDER ALSO INDICATED HE WILL BE REPAIRING THE SWALE ON THE TURN ACROSS FROM 20 BIG DIPPER LN AS HIS DELIVERY TRUCKS AND CONSTRUCTION VEHICLES HAD DAMAGED THE ROW ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/27/23 ____________________________________________________________________________________________________________________ 12/6/2023 - PREVIOUS INSPECTION NOTES rjg. Major damage to the swales by concrete and other trucks from this new build. Reported by house 19 who was a witness to the damage. Major damage to swales to be repaired by INB homes from this construction project. Per Frankie with INB, this will be fixed after Monday 12/11. Last big truck to deliver. Drainage insepction scheduled for 12/22/23 to make sure the rutts were repaired. | |||
| ROOF SHEATHING | 12/27/2023 | APPROVED | FWILLIS |
| WALL SHEATHING | 12/27/2023 | APPROVED | FWILLIS |
| ROW - DRAINAGE | 12/22/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/22/23 NO CORRECTIONS HAVE BEEN MADE ART THE TIME OF THIS INSPECTION BUILDER SAID HE WILL CORRECT ON 12/27/23 ** ROAD SIDE SWALE NEEDS TO BE OPENS AND MAINTAINED IF TEMPORARY CULVERT IS INSTALLED INSTALL TO EXTING GRADE TO ALLOW WATER TO FLOW ** REMOVE ALL CONSTRUCTION DEBRIS FROM THE ROAD SIDE SWALE (ROW) ** REMOVE PORT-A-JOHN FROM EDGE OF ROAD / ROW PUT ONTO SITE ** BUILDER ALSO INDICATED HE WILL BE REPAIRING THE SWALE ON THE TURN ACROSS FROM 20 BIG DIPPER LN AS HIS DELIVERY TRUCKS AND CONSTRUCTION VEHICLES HAD DAMAGED THE ROW ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/27/23 ____________________________________________________________________________________________________________________ 12/6/2023 - PREVIOUS INSPECTION NOTES rjg. Major damage to the swales by concrete and other trucks from this new build. Reported by house 19 who was a witness to the damage. Major damage to swales to be repaired by INB homes from this construction project. Per Frankie with INB, this will be fixed after Monday 12/11. Last big truck to deliver. Drainage insepction scheduled for 12/22/23 to make sure the rutts were repaired. | |||
| ROW- PROJECT STATUS | 12/20/2023 | APPROVED | RGROSS |
| Note: rjg. 12/6/23. Builders large trucks destroyed the swale across from 20 Big Dipper. Frankie agreed to fix the swale damage after Monday 12.11.23 when his last big truck (trusses) were delivered. Please inspect that swale damage was repaired. | |||
| FOUND SURVEY APPROVED (OFFICE) | 12/14/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/07/2023 | APPROVED | JSTEWART |
| ROW - DRAINAGE | 12/06/2023 | Disapproved - NO FEE | RGROSS |
| Note: rjg. Major damage to the swales by concrete and other trucks from this new build. Reported by house 19 who was a witness to the damage. Major damage to swales to be repaired by INB homes from this construction project. Per Frankie with INB, this will be fixed after Monday 12/11. Last big truck to deliver. Project status scheduled for 12/20.23 to check that repairs were made. | |||
| MONOLITHIC SLAB | 11/30/2023 | APPROVED | JSTEWART |
| Note: 11/29/2023 - PREVIOUS INSPECTION NOTES 11/29/23-No termite cert posted. R319.1 Address identification.......Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm)n | |||
| MONOLITHIC SLAB | 11/29/2023 | Disapproved -FEE REQUIRED | JSTEWART |
| Note: 11/29/23-No termite cert posted. R319.1 Address identification.......Each character shall be not less than 4 inches (102 mm) in height with a stroke width of not less than 0.5 inch (12.7 mm)n | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/22/2023 | APPROVED | MGIBSON |
| WATER METER INSTALLATION REQUEST | 10/20/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 04/04/2024 | 04/08/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 01/29/2024 | 01/30/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/14/2023 | 12/14/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 12/07/2023 | 12/12/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| BADMIN | INFORMATION | 11/09/2023 | 11/09/2023 |
| Note: Marked INFORMATION By: SCOTT THOMAS - (386)986-3780 - STHOMAS@PALMCOASTGOV.COM FOUNDATION SURVEY NOT SUBMITTED | |||
| ENGIN1 | HOLD | 11/09/2023 | 11/14/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 11/09/2023 | 11/09/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/01/2023 | 08/02/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 07/26/2023 | 09/12/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 07/25/2023 | 07/26/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 07/25/2023 | 07/26/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 07/25/2023 | 07/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 07/25/2023 | 07/26/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 07/25/2023 | 07/26/2023 |
| LOCATE | COMPLETE | 07/25/2023 | 07/26/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 07/25/2023 | 07/26/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM 1. Design location on heatload needs to be Daytona Beach 2. Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 07/25/2023 | 07/31/2023 |
| Note: Released By: ROBERT GROSS - (386)986-4769 - RGROSS@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/25/2023 | 07/27/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| BADMIN | COMPLETE | 07/25/2023 | 07/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/17/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/17/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/16/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/12/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/12/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/12/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/12/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/12/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/12/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/12/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/12/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/12/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/12/2024 |
| PLAN REVIEW - REVISION | ¤32.50 | 04/12/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/12/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/02/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/02/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 10/02/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 10/02/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/02/2023 |
| IMPACT FEE FIRE | ¤420.52 | 10/02/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/02/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/02/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 10/02/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/02/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 10/02/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/02/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 10/02/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 10/02/2023 |
| SURCHARGE FS 533.721 | ¤4.10 | 10/02/2023 |
| SURCHARGE - FS 468.631 | ¤6.16 | 10/02/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/02/2023 |
| CONNECTION FEES | ¤1,166.26 | 10/02/2023 |
| WATER- TURN ON | ¤25.00 | 10/02/2023 |
| ADJUSTMENT 50% | (¤410.36) | 10/02/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/02/2023 |
| INSPECTION - RESIDENTIAL | ¤616.00 | 10/02/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤174.72 | 10/02/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/02/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/02/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 10/02/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 10/02/2023 |
| SEWER CREDIT | (¤2,065.50) | 10/02/2023 |
| SEWER INSPECTION | ¤25.00 | 10/02/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 10/02/2023 |
| WATER CREDIT | (¤400.24) | 10/02/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 10/02/2023 |
| SITE PLAN 30 | ¤30.00 | 10/02/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,249.51 |