Permit #2023080058
Permit Details
Status: COED
| Parcel Id: 07-11-31-7037-00190-0200 |
| CONDITIONED SPACE: 1840 sqft |
| GARAGE: 527 sqft |
| OPENED PORCH (WITH ROOF) : 162 sqft |
| OPENED PORCH (WITH ROOF) : 47 sqft |
| Total Square Footage: 2576 sqft |
| Block: 00190 |
| Subdivision: 2176 - SECTION 37-LAKEVIEW |
| Job Phone: 386-237-8427 |
| Location Address: 11 LYNDENHURST LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 08/24/2023 |
| NOC: RECORDED |
| Applicant name: JAY DARREN CURBOW |
| Owner: MELANIE MAKAHLYA |
|
Address 8 VILLAGE VIEW WAY PALM COAST, FL 32137 |
| Lot: 0200 |
| Contracted Stated Job Value: ¤323,300.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BLUE WATER HOMES INC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4881 PALM COAST PARKWAY NW UNIT 1 PALM COAST, FL 32137 |
CBC1258679 (Exp: 08/31/2026) | 386-445-3405 |
Sub Contractors
WILLIAM FRANK DUDLEY JR.
| Status | Location Address | State License Number | Phone |
| ACTIVE |
P.O. BOX 978 Bunnell, FL 32110 |
EC0003177 (Exp: 08/31/2026) | (386)437-3068 |
BRETT CHRISTIAN GIBSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
250 SEGOVIA RD ST AUGUSTINE, FL 32086 |
CAC1818423 (Exp: 08/31/2026) | 904-229-8131 |
JEFFREY TROY SABAKA
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2191 DEERWOOD ACRES DR ST AUGUSTINE, FL 32084 |
CFC1427439 (Exp: 08/31/2026) | 904-838-2218 | 904-819-0965 |
JACK DOUGLAS LANIER
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
485 COMMERCE WAY LONGWOOD , FL 32750 |
CCC058022 (Exp: 08/31/2026) | (321)441-2300 | (321)441-2313 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 04/24/2024 | Approval - Private Provider | PPROVIDER |
| ROW - STORMWATER FINAL | 04/12/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 4/12/24 CORRECTION MADE AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ 4/11/2024 - PREVIOUS INSPECTION NOTES 4/11/24 CORRECTIONS NOT MADE. YOU NEED TO READ PREVIOUS INSPECTION NOTES. THERE IS STILL PVC PIPE, CONCRETE CHUNKS AND TRASH IN THE VACANT LOT ON THE LEFT THAT NEEDS TO BE CLEANED UP. ________________________________________________________________________________________________________________________ 4/3/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL STRAW FROM THE MEDIAN AND REPLACE ALL DAMAGE IN THE RIGHT OF WAY WITH SOD AND N THE VACANT TO THE LEFT OF YOURS LOT. Sec 300.02 e4 The Stormwater Final Inspection will include visual inspection of the pool site and adjacent properties for construction debris, proper clean up and repair to damaged terrain. Sec 300.02 e4 Road damage in the area of construction is also attributable to the Builder. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE LEFT OF YOUR LOT AND FROM YOUR LOT. Sec 300.02 e4 The Stormwater Final Inspection will include visual inspection of the pool site and adjacent properties for construction debris, proper clean up and repair to damaged terrain. | |||
| ROW - STORMWATER FINAL | 04/11/2024 | Disapproved -FEE REQUIRED | FSLADISH |
| Note: 4/11/24 CORRECTIONS NOT MADE. YOU NEED TO READ PREVIOUS INSPECTION NOTES. THERE IS STILL PVC PIPE, CONCRETE CHUNKS AND TRASH IN THE VACANT LOT ON THE LEFT THAT NEEDS TO BE CLEANED UP. ________________________________________________________________________________________________________________________ 4/3/2024 - PREVIOUS INSPECTION NOTES 1) NEED TO REMOVE ALL STRAW FROM THE MEDIAN AND REPLACE ALL DAMAGE IN THE RIGHT OF WAY WITH SOD AND N THE VACANT TO THE LEFT OF YOURS LOT. Sec 300.02 e4 The Stormwater Final Inspection will include visual inspection of the pool site and adjacent properties for construction debris, proper clean up and repair to damaged terrain. Sec 300.02 e4 Road damage in the area of construction is also attributable to the Builder. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE LEFT OF YOUR LOT AND FROM YOUR LOT. Sec 300.02 e4 The Stormwater Final Inspection will include visual inspection of the pool site and adjacent properties for construction debris, proper clean up and repair to damaged terrain. | |||
| U -UTILITY RESIDENTIAL FINAL | 04/03/2024 | FINAL APPROVED | DHANEY |
| ROW - STORMWATER FINAL | 04/03/2024 | Disapproved -FEE REQUIRED | PFLANAGAN |
| Note: 1) NEED TO REMOVE ALL STRAW FROM THE MEDIAN AND REPLACE ALL DAMAGE IN THE RIGHT OF WAY WITH SOD AND N THE VACANT TO THE LEFT OF YOURS LOT. Sec 300.02 e4 The Stormwater Final Inspection will include visual inspection of the pool site and adjacent properties for construction debris, proper clean up and repair to damaged terrain. Sec 300.02 e4 Road damage in the area of construction is also attributable to the Builder. 2) NEED TO PICK UP ALL TRASH AND CONSTRUCTION DEBRIS FROM THE VACANT LOT TO THE LEFT OF YOUR LOT AND FROM YOUR LOT. Sec 300.02 e4 The Stormwater Final Inspection will include visual inspection of the pool site and adjacent properties for construction debris, proper clean up and repair to damaged terrain. | |||
| U-CROSS CONNECTION | 04/02/2024 | APPROVED | DHANEY |
| ROW - FINAL APRON (AFTER POUR) | 04/02/2024 | APPROVED | PFLANAGAN |
| Note: At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 04/02/2024 | APPROVED | PFLANAGAN |
| Note: CORRECTION MADE -------------------------------------------------------------------- 3/28/2024 - PREVIOUS INSPECTION NOTES 3/28/24 IN THE RIGHT REAR CORNER FOLLOWING THE RIGHT PROPERTY LINE, YOU NEED TO HAVE A 4:1 SLOPE UNTIL IT JOINS UP WITH THE COMMON SWALE. IT IS MORE LIKE A 2:1 SLOPE CURRENTLY IN THE BACK CORNER. OTHERWISE, DRAINAGE WILL WORK AS INDICATED. | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/28/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 02/28/24 NEED TO CONTAIN POUR TO POUR AREA. THE FORMS HAVE 4" GAPS UNDERNEATH. EITHER BACKFILL WITH DIRT OR CONTINUE FORMS TO GROUND LEVEL. AS PART OF THE AFTER POUR WE CHECK FOR OVER POUR. OTHER CORRECTIONS HAVE BEEN MADE. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. -------------------------------------------------------------------------------------------- 2/27/2024 - PREVIOUS INSPECTION NOTES ** 02/27/24 BUILDER NEEDS TO REMOVE HIGH AREA IN DRIVEWAY ABOVE THE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA. ** NEED TO CHIP AWAY OVER POUR AT GARAGE OPENING NEED A MINIMUM OF 4 INCHES OF CONCRETE IN ENTIRE POUR AREA. ** MATERIAL AROUND CULVERT IS WET AND SOFT NEED COMPACTION FOOT SINKS 4-6 INCHES ** LEFT STINGLINE IN DRIVEWAY AS GUIDE ALSO WHITE PAINT ACROSS GARAGE OPENING WHERE TO CHIP CONCRETE AWAY ** GOOD ELEVATION WAS GOOD AT TH TIME OF THIS INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/28/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 3/28/24 IN THE RIGHT REAR CORNER FOLLOWING THE RIGHT PROPERTY LINE, YOU NEED TO HAVE A 4:1 SLOPE UNTIL IT JOINS UP WITH THE COMMON SWALE. IT IS MORE LIKE A 2:1 SLOPE CURRENTLY IN THE BACK CORNER. OTHERWISE, DRAINAGE WILL WORK AS INDICATED. | |||
| ELECTRIC - EARLY POWER | 03/21/2024 | Approval - Private Provider | PPROVIDER |
| Note: 3/20/2024 3:11:22 PM- PREVIOUS INSPECTION NOTES | |||
| ELECTRIC - EARLY POWER | 03/20/2024 | Disapproved- Private Provider | PPROVIDER |
| ROW- PRE-APRON (PRE-POUR) | 02/28/2024 | APPROVED - AS NOTED | TPOLACEK |
| Note: 02/28/24 NEED TO CONTAIN POUR TO POUR AREA. THE FORMS HAVE 4" GAPS UNDERNEATH. EITHER BACKFILL WITH DIRT OR CONTINUE FORMS TO GROUND LEVEL. AS PART OF THE AFTER POUR WE CHECK FOR OVER POUR. OTHER CORRECTIONS HAVE BEEN MADE. APPROVING AS NOTED. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD DOUBLE CHECK CULVERT ELEVATIONS MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. -------------------------------------------------------------------------------------------- 2/27/2024 - PREVIOUS INSPECTION NOTES ** 02/27/24 BUILDER NEEDS TO REMOVE HIGH AREA IN DRIVEWAY ABOVE THE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA. ** NEED TO CHIP AWAY OVER POUR AT GARAGE OPENING NEED A MINIMUM OF 4 INCHES OF CONCRETE IN ENTIRE POUR AREA. ** MATERIAL AROUND CULVERT IS WET AND SOFT NEED COMPACTION FOOT SINKS 4-6 INCHES ** LEFT STINGLINE IN DRIVEWAY AS GUIDE ALSO WHITE PAINT ACROSS GARAGE OPENING WHERE TO CHIP CONCRETE AWAY ** GOOD ELEVATION WAS GOOD AT TH TIME OF THIS INSPECTION ** SEE ATTACHED PHOTOS | |||
| ROW- PRE-APRON (PRE-POUR) | 02/27/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/27/24 BUILDER NEEDS TO REMOVE HIGH AREA IN DRIVEWAY ABOVE THE ROW NEED A MINIMUM OF 4 INCHES OF CONCRETE IN DRIVEWAY POUR AREA. ** NEED TO CHIP AWAY OVER POUR AT GARAGE OPENING NEED A MINIMUM OF 4 INCHES OF CONCRETE IN ENTIRE POUR AREA. ** MATERIAL AROUND CULVERT IS WET AND SOFT NEED COMPACTION FOOT SINKS 4-6 INCHES ** LEFT STINGLINE IN DRIVEWAY AS GUIDE ALSO WHITE PAINT ACROSS GARAGE OPENING WHERE TO CHIP CONCRETE AWAY ** GOOD ELEVATION WAS GOOD AT TH TIME OF THIS INSPECTION ** SEE ATTACHED PHOTOS | |||
| U - SEWER TIE IN | 02/15/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| PEP TANK INSTALLATION REQUEST | 01/31/2024 | APPROVED | BVITALE |
| Note: 1/29/2024 9:40:43 AM- PREVIOUS INSPECTION NOTES STUCCO | |||
| PEP TANK INSTALLATION REQUEST | 01/26/2024 | Disapproved -FEE REQUIRED | BVITALE |
| Note: STUCCO | |||
| LATH/BRICK/ WATER BARRIER | 01/25/2024 | Approval - Private Provider | PPROVIDER |
| INSULATION | 01/22/2024 | Approval - Private Provider | PPROVIDER |
| ALL ROUGH | 01/17/2024 | Approval - Private Provider | BBEMBRY |
| WALL SHEATHING | 12/07/2023 | Approval - Private Provider | PPROVIDER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/07/2023 | Approval - Private Provider | PPROVIDER |
| ROOF VALLEY & METAL | 12/07/2023 | Approval - Private Provider | PPROVIDER |
| FOUND SURVEY APPROVED (OFFICE) | 12/06/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 11/01/2023 | Approval - Private Provider | PPROVIDER |
| MONOLITHIC SLAB | 10/18/2023 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 10/12/2023 | APPROVED - AS NOTED | EMADISON |
| Note: ** 10/12 23 IT IS THE BUILDERS RESPONSIBILITY TO MAINATIN SEDIMENT AND EROSION CONTROL ON THE JOB SITE. AS WELL AS KEEPING THE DRAINAGE OPEN _________________________________________________________________________________________________________________________ 10/9/2023 - PREVIOUS INSPECTION NOTES ** 10/09/23 BUILDER NEEDS TO OPEN ROAD SIDE SWALE WHERE TEMPORARY CULVERT WAS REMOVED NEED TO REMOVE EXCESS MATERIAL YOU PUT IN PLACE ** BUILDER INSTALL SILT FENCE DOWN RIGHT SIDE OF PROPERTY THEN ALSO FROM RIGHT CORNER ACROSS THE FRONT UP TO YOUR ACCESS POINT TO LOT ** FOLLOW UP INSPECTION ON 10/12/23 _____________________________________________________________________________________________________________________ rjg - Caller at 13 says that there should be silt fence around new construction site. Please inspect. 9/29/2023 - PREVIOUS INSPECTION NOTES ** 09/29/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR SITE IS BLOCKING THE FLOW OF STORMWATER , YOUR TEMPORARY PIPE IS NOT EFFECTIVE AS ITS BEEN INSTALLED HIGHER THAN THE SWALE DRAINAGE YOUR SITE IS CREATING A NEGATIVE IMPACT OF SURROUNDING PROPERTIES. ** NEED TO REMOVE ANY SEDIMENT (DIRT, MUD) FROM ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/03/23 _____________________________________________________________________________________________________________________ rjg. Caller at 9 says the builder has the swale all blocked off. Please inspect. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 10/11/2023 | Approval - Private Provider | PPROVIDER |
| GRAVITY SEWER TEST | 10/11/2023 | Approval - Private Provider | PPROVIDER |
| ROW - DRAINAGE | 10/09/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 10/09/23 BUILDER NEEDS TO OPEN ROAD SIDE SWALE WHERE TEMPORARY CULVERT WAS REMOVED NEED TO REMOVE EXCESS MATERIAL YOU PUT IN PLACE ** BUILDER INSTALL SILT FENCE DOWN RIGHT SIDE OF PROPERTY THEN ALSO FROM RIGHT CORNER ACROSS THE FRONT UP TO YOUR ACCESS POINT TO LOT ** FOLLOW UP INSPECTION ON 10/12/23 _________________________________________________________________________________________________________________________ _ ** 10/06/23 **INSPECTION CHANGED TO A PRIORITY ONE STATUS NO OTHER INSPECTIONS CAN BE RESULTED UNTIL CORRECTIONS HAVE BEEN MADE AND DRAINAGE INSPECTION HAS BEEN APPROVED** ** BUILDERS SITE IS NEGATIVELY IMPACTING THE ADJACENT PROPERTIES ON THE RIGHT AND LEFT SIDES ** YOU ARE REQUIRED TO PROPERLY INSTALL SILT FENCING AROUND THE PERIMETER OF YOUR SITE THIS NEEDS TO BE DONE IMMEDIATELY TO PREVENT MORE SEDIMENT FROM ERODING AND LEAVING YOUR SITE . ** BUILDER IS REQUIRED TO CLEAN ERODED SEDIMENT FROM THE ADJACENT PROPERTIES. ( INCLUDING THE SEDIMENT THAT HAS BEEN WASHED UNDER THE FENCE AT 44 FENWOOD ) ** BUILDER ALSO NEEDS TO INSTALL THE JOB SITES PERMIT BOX ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/09/23 _____________________________________________________________________________________________________________________ rjg - Caller at 13 says that there should be silt fence around new construction site. Please inspect. 9/29/2023 - PREVIOUS INSPECTION NOTES ** 09/29/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR SITE IS BLOCKING THE FLOW OF STORMWATER , YOUR TEMPORARY PIPE IS NOT EFFECTIVE AS ITS BEEN INSTALLED HIGHER THAN THE SWALE DRAINAGE YOUR SITE IS CREATING A NEGATIVE IMPACT OF SURROUNDING PROPERTIES. ** NEED TO REMOVE ANY SEDIMENT (DIRT, MUD) FROM ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/03/23 _____________________________________________________________________________________________________________________ rjg. Caller at 9 says the builder has the swale all blocked off. Please inspect. | |||
| ROW - DRAINAGE | 09/29/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** 09/29/23 BUILDER NEEDS TO OPEN THE ROAD SIDE SWALE AS YOUR SITE IS BLOCKING THE FLOW OF STORMWATER , YOUR TEMPORARY PIPE IS NOT EFFECTIVE AS ITS BEEN INSTALLED HIGHER THAN THE SWALE DRAINAGE YOUR SITE IS CREATING A NEGATIVE IMPACT OF SURROUNDING PROPERTIES. ** NEED TO REMOVE ANY SEDIMENT (DIRT, MUD) FROM ROADWAY ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 10/03/23 _____________________________________________________________________________________________________________________ rjg. Caller at 9 says the builder has the swale all blocked off. Please inspect. | |||
| WATER METER INSTALLATION REQUEST | 09/07/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 12/06/2023 | 12/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/06/2023 | 12/06/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/23/2023 | 08/23/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/16/2023 | 08/16/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Must have a minimum of 16 - 3 gallon foundation plantings with a minimum of 8 along the front and four along each front side. Plantings must be planted within 2 1/2 to 8 ft from the home's foundation | |||
| SW1 | COMPLETE | 08/16/2023 | 08/23/2023 |
| Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM COMMIN SWALE WAS DETERMIND DO TO THE 10' OFF SET ELEVATIONS SHOWS THAT IT WOULD WORK | |||
| ENGIN1 | COMPLETE | 08/16/2023 | 08/16/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/01/2023 | 08/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| LOCATE | COMPLETE | 08/01/2023 | 08/02/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/01/2023 | 08/09/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM NEED TO MAKE RIGHT SIDE A COMMON SWALE | |||
| ZON | HOLD | 08/01/2023 | 08/01/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House layout on landscape plan doesn't match site and plans Lot number on site plan/survey is incorrect within the lot boundaries | |||
| SWALE | COMPLETE | 08/01/2023 | 09/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/22/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/22/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 04/22/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/22/2024 |
| SW ENG REINSPECTION 20 | ¤20.00 | 04/22/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 04/22/2024 |
| UTILITY PEP REINSPECTION | ¤40.00 | 04/22/2024 |
| SEWER CREDIT | (¤2,291.75) | 08/24/2023 |
| SEWER INSPECTION | ¤25.00 | 08/24/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 08/24/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 08/24/2023 |
| SITE PLAN 30 | ¤30.00 | 08/24/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 08/24/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 08/24/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 08/24/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 08/24/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 08/24/2023 |
| SW ENG PRE APRON | ¤30.00 | 08/24/2023 |
| WATER- TURN ON | ¤25.00 | 08/24/2023 |
| ADJUSTMENT 50% | (¤15.00) | 08/24/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/24/2023 |
| ADMINISTRATIVE - RESID PP | ¤225.00 | 08/24/2023 |
| CONNECTION FEES | ¤1,166.26 | 08/24/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 08/24/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 08/24/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 08/24/2023 |
| IMPACT FEE FIRE | ¤420.52 | 08/24/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 08/24/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 08/24/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 08/24/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 08/24/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 08/24/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 08/24/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 08/24/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 08/24/2023 |
| SURCHARGE FS 533.721 | ¤2.40 | 08/24/2023 |
| SURCHARGE - FS 468.631 | ¤3.60 | 08/24/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 08/24/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,013.88 |