Permit #2023080111
Permit Details
Status: COED
| Parcel Id: 07-11-31-7007-00150-0310 |
| CONDITIONED SPACE: 1903 sqft |
| GARAGE: 435 sqft |
| OPENED PORCH (WITH ROOF) : 182 sqft |
| OPENED PORCH (WITH ROOF) : 70 sqft |
| Total Square Footage: 2590 sqft |
| Block: 00150 |
| Subdivision: 2185 - SECTION 7-FLORIDA PARK |
| Job Phone: 202-494-2019 |
| Location Address: 50 FOLSON LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 10/09/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0310 |
| Contracted Stated Job Value: ¤175,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
JOSEPH HORATIO STRADA JR
| Status | Location Address | State License Number | Phone |
| ACTIVE |
3400 ST JOHNS PARKWAY SANFORD, FL 32771 |
EC13003715 (Exp: 08/31/2026) | 877-906-1113 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/27/2024 | FINAL APPROVED | JWALKER |
| Note: 3/26/2024 - PREVIOUS INSPECTION NOTES 1. no power at ref. outlet 2. FBC.R. M1303.1 need to identify maximum over current breaker size on air handler unit with factory applied label. 3. need to fill annular space arounf electric in ahu closet where it inters wall per FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 | |||
| BLD - BUILDING FINAL | 03/26/2024 | Disapproved - NO FEE | LMILLER |
| Note: 1. no power at ref. outlet 2. FBC.R. M1303.1 need to identify maximum over current breaker size on air handler unit with factory applied label. 3. need to fill annular space arounf electric in ahu closet where it inters wall per FBC ENERGY CONSERVATION RESIDENTIAL PROVISIONS CHAPTER 4- R402.4.1 | |||
| ROW - FINAL APRON (AFTER POUR) | 03/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/26/24 PIPE GOOD. CUTS MADE. CULVERT CLEAN. HOT PATCH COMPLETED. _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/25/24 UPON WALKING THE PROPERTY DETERMINED THAT THE DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 03/26/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/26/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 3/25/24 UPON WALKING THE PROPERTY DETERMINED THAT THE DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U -UTILITY RESIDENTIAL FINAL | 03/26/2024 | FINAL APPROVED | DHANEY |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/25/2024 | APPROVED | FSLADISH |
| Note: Inspector Notes from Inspection 9270 ** 02/27/24 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________________ 2/26/2024 - PREVIOUS INSPECTION NOTES ** 02/26/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION ***NO CORRECTIONS MADE*** ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ____________________________________________________________________________________________________________________ 2/23/2024 - PREVIOUS INSPECTION NOTES ** ** 02/23/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION NO CORRECTIONS MADE ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ________________________________________________________________________________________________________________________ 2/22/2024 - PREVIOUS INSPECTION NOTES ** 02/22/24 BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/25/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 3/25/24 UPON WALKING THE PROPERTY DETERMINED THAT THE DRAINAGE WILL WORK AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U-CROSS CONNECTION | 03/22/2024 | APPROVED | DHANEY |
| ROW- PRE-APRON (PRE-POUR) | 02/28/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 02/27/24 CORRECTIONS MADE READY TO POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL _________________________________________________________________________________________________________________ 2/26/2024 - PREVIOUS INSPECTION NOTES ** 02/26/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION ***NO CORRECTIONS MADE*** ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ____________________________________________________________________________________________________________________ 2/23/2024 - PREVIOUS INSPECTION NOTES ** ** 02/23/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION NO CORRECTIONS MADE ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ________________________________________________________________________________________________________________________ 2/22/2024 - PREVIOUS INSPECTION NOTES ** 02/22/24 BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/26/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 02/26/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION ***NO CORRECTIONS MADE*** ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ____________________________________________________________________________________________________________________ 2/23/2024 - PREVIOUS INSPECTION NOTES ** ** 02/23/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION NO CORRECTIONS MADE ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ________________________________________________________________________________________________________________________ 2/22/2024 - PREVIOUS INSPECTION NOTES ** 02/22/24 BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/23/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** ** 02/23/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS INSPECTION NO CORRECTIONS MADE ** BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. ________________________________________________________________________________________________________________________ 2/22/2024 - PREVIOUS INSPECTION NOTES ** 02/22/24 BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. | |||
| ROW- PRE-APRON (PRE-POUR) | 02/22/2024 | Disapproved - NO FEE | TPOLACEK |
| Note: ** 02/22/24 BUILDER NEEDS TO REMOVE MATERIAL FROM AROUND THE CULVERT CURRENTLY TO MUCH CULVERT NEEDS TO BE BURIED HALF WAY SO THE CONCRETE ENCASES THE CULVERT. ATTACHED IS THE CULVERT 300.E CITY STANDARD DIAGRAM. AT THE TIME OF THIS INSPECTION PIPE IS GOOD | |||
| ELECTRIC - EARLY POWER | 02/21/2024 | APPROVED | AGAETANO |
| INSULATION | 01/17/2024 | APPROVED | AGAETANO |
| ALL ROUGH | 01/12/2024 | APPROVED | AGAETANO |
| Note: 1/11/2024 - PREVIOUS INSPECTION NOTES 1/10/2024 - PREVIOUS INSPECTION NOTES 01-10-2024 1. Wires not phased out. 2. Head test failed. 3. Energy calcs not on site. Inspection stopped. 01-11-2024 Above issue not resolved. Head test failed. | |||
| ALL ROUGH | 01/11/2024 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 1/10/2024 - PREVIOUS INSPECTION NOTES 01-10-2024 1. Wires not phased out. 2. Head test failed. 3. Energy calcs not on site. Inspection stopped. 01-11-2024 Above issue not resolved. Head test failed. | |||
| LATH/BRICK/ WATER BARRIER | 01/11/2024 | APPROVED | AGAETANO |
| ALL ROUGH | 01/10/2024 | Disapproved - NO FEE | AGAETANO |
| Note: 01-10-2024 1. Wires not phased out. 2. Head test failed. 3. Energy calcs not on site. Inspection stopped. | |||
| ROOF VALLEY & METAL | 01/02/2024 | APPROVED | AGAETANO |
| Note: Inspector Notes from Inspection 2460 12/27/2023 - PREVIOUS INSPECTION NOTES 12/21/2023 - PREVIOUS INSPECTION NOTES 12/18/2023 - PREVIOUS INSPECTION NOTES 12-18-2023 1. Drawings are ripped, wet, and torn. Please have a clean, dry set of approved drawings on site for inspections. 2. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 12-21-2023 1. Truss layout not on site. 2. Garage anchors not fastened properly. Check all. 12-27-2023 Truss layout is too small to read. Please have a large readable set of drawings and documents on site for all inspections. 12-28-2023 Please have trash removed prior to next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/28/2023 | APPROVED - AS NOTED | AGAETANO |
| Note: 12/27/2023 - PREVIOUS INSPECTION NOTES 12/21/2023 - PREVIOUS INSPECTION NOTES 12/18/2023 - PREVIOUS INSPECTION NOTES 12-18-2023 1. Drawings are ripped, wet, and torn. Please have a clean, dry set of approved drawings on site for inspections. 2. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 12-21-2023 1. Truss layout not on site. 2. Garage anchors not fastened properly. Check all. 12-27-2023 Truss layout is too small to read. Please have a large readable set of drawings and documents on site for all inspections. 12-28-2023 Please have trash removed prior to next inspection. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/27/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 12/21/2023 - PREVIOUS INSPECTION NOTES 12/18/2023 - PREVIOUS INSPECTION NOTES 12-18-2023 1. Drawings are ripped, wet, and torn. Please have a clean, dry set of approved drawings on site for inspections. 2. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 12-21-2023 1. Truss layout not on site. 2. Garage anchors not fastened properly. Check all. 12-27-2023 Truss layout is too small to read. Please have a large readable set of drawings and documents on site for all inspections. | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/21/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 12/18/2023 - PREVIOUS INSPECTION NOTES 12-18-2023 1. Drawings are ripped, wet, and torn. Please have a clean, dry set of approved drawings on site for inspections. 2. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. 12-21-2023 1. Truss layout not on site. 2. Garage anchors not fastened properly. Check all. | |||
| ROOF VALLEY & METAL | 12/21/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 12-21-2023 Truss layout not on site. Braces/ tie down inspection will need to be approved prior to roof valley metal inspection and approval. | |||
| ELECTRIC-TUG | 12/21/2023 | APPROVED | AGAETANO |
| Note: 12/15/2023 - PREVIOUS INSPECTION NOTES 12/15/23 via phone | |||
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/18/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 12-18-2023 1. Drawings are ripped, wet, and torn. Please have a clean, dry set of approved drawings on site for inspections. 2. Job site is a mess. Please remove trash prior to next inspection. Inspection stopped. | |||
| WALL SHEATHING | 12/15/2023 | APPROVED | FWILLIS |
| Note: 12/14/2023 - PREVIOUS INSPECTION NOTES NOT READY | |||
| ELECTRIC-TUG | 12/15/2023 | CANCELLED BY APPLICANT | JSTEWART |
| Note: 12/15/23 via phone | |||
| WALL SHEATHING | 12/14/2023 | CANCELLED BY APPLICANT | FWILLIS |
| Note: NOT READY | |||
| ROOF SHEATHING | 12/14/2023 | APPROVED | FWILLIS |
| ROW - DRAINAGE | 12/11/2023 | APPROVED | EMADISON |
| Note: 12/8/2023 - PREVIOUS INSPECTION NOTES ** 12/08/23 CORRECTION STILL REQUIRED TO REMOVE TRUSSES FROM EDGE OF ROAD AS WELL AS LUMBER ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 12/11/23 _____________________________________________________________________________________________________________________ 12/7/2023 - PREVIOUS INSPECTION NOTES ** 12/07/23 CORRECTION STILL REQUIRED TO REMOVE TRUSSES FROM EDGE OF ROAD AS WELL AS LUMBER ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 12/08/23 12/6/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/07/23 | |||
| ROW - DRAINAGE | 12/08/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/08/23 CORRECTION STILL REQUIRED TO REMOVE TRUSSES FROM EDGE OF ROAD AS WELL AS LUMBER ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 12/11/23 _____________________________________________________________________________________________________________________ 12/7/2023 - PREVIOUS INSPECTION NOTES ** 12/07/23 CORRECTION STILL REQUIRED TO REMOVE TRUSSES FROM EDGE OF ROAD AS WELL AS LUMBER ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 12/08/23 12/6/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/07/23 | |||
| ROW - DRAINAGE | 12/07/2023 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 12/07/23 CORRECTION STILL REQUIRED TO REMOVE TRUSSES FROM EDGE OF ROAD AS WELL AS LUMBER ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS FROM TODAYS INSPECTION ** FOLLOW UP INSPECTION ON 12/08/23 12/6/2023 - PREVIOUS INSPECTION NOTES ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES/ LUMBER FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/07/23 | |||
| ROW - DRAINAGE | 12/06/2023 | Disapproved - NO FEE | EMADISON |
| Note: ** BUILDER NEEDS TO IMMEDIATELY REMOVE THE TRUSSES FROM THE EDGE OF ROAD AND ROAD SIDE SWALE YOU HAVE CREATED A SAFETY HAZARD FOR MOTORISTS, PEDESTRIANS, AND BICYCLISTS ** YOU MUST ALSO KEEP THE ROAD SIDE SWALE UNOBSTRUCTED ** THE INSPECTION PRIORITY HAS BEEN CHANGED TO A PRIORITY (1) WHICH MEANS NO OTHE RINSPECTIONS CAN BE RESULTED UNTIL THIS IS CORRECTED ** FOLLOW UP INSPECTIONS WILL BE EVERYDAY DUE TO THE HAZARD YOU HAVE CREATED ** SEE ATTACHED PHOTOS ** FOLLOW UP INSPECTION ON 12/07/23 | |||
| TIE BEAM / LINTEL | 11/29/2023 | APPROVED | FWILLIS |
| Note: 11/29/23 - ITEMS CORRECTED 11/28/2023 - PREVIOUS INSPECTION NOTES 11-28-2023 1. Multiple dowels not proper distance. Check all. 2. Missed dowel. Noted on drawings. | |||
| TIE BEAM / LINTEL | 11/28/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 11-28-2023 1. Multiple dowels not proper distance. Check all. 2. Missed dowel. Noted on drawings. | |||
| FOUND SURVEY APPROVED (OFFICE) | 11/28/2023 | APPROVED | TBAKER |
| MONOLITHIC SLAB | 11/15/2023 | APPROVED | AGAETANO |
| Note: 11/14/2023 - PREVIOUS INSPECTION NOTES 11/13/2023 - PREVIOUS INSPECTION NOTES 121-13-2023 1. Drawings are dirty and ripped. Please provide a large full set of approved drawings for inspections. 2. Slab area needs to be tamped. Inspection stopped. 11-14-2023 1. Slab area not tamped. | |||
| MONOLITHIC SLAB | 11/14/2023 | Disapproved -FEE REQUIRED | AGAETANO |
| Note: 11/13/2023 - PREVIOUS INSPECTION NOTES 121-13-2023 1. Drawings are dirty and ripped. Please provide a large full set of approved drawings for inspections. 2. Slab area needs to be tamped. Inspection stopped. 11-14-2023 1. Slab area not tamped. | |||
| GRAVITY SEWER TEST | 11/13/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRTUAL INSPECTION | |||
| MONOLITHIC SLAB | 11/13/2023 | Disapproved - NO FEE | AGAETANO |
| Note: 121-13-2023 1. Drawings are dirty and ripped. Please provide a large full set of approved drawings for inspections. 2. Slb are needs to be tamped. 3. No head test. Inspection stopped. | |||
| U - SEWER TIE IN | 11/13/2023 | APPROVED - AS NOTED | MGIBSON |
| Note: THIS WAS A VIRYUAL INSPECTION | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/07/2023 | APPROVED | KSANDOE |
| WATER METER INSTALLATION REQUEST | 10/19/2023 | APPROVED | CBOWERMASTER |
| WILDLIFE CHECK - ENVIRONMENTAL | 08/04/2023 | APPROVED | DRODRIGUEZ |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/15/2024 | 03/19/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 11/28/2023 | 11/28/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 11/28/2023 | 11/29/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 11/27/2023 | 11/28/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Slab elevation on foundation survey is 10+' higher than that of site plan. | |||
| ZON | COMPLETE | 11/27/2023 | 11/27/2023 |
| Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 11/15/2023 | 11/15/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 11/15/2023 | 11/15/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 08/11/2023 | 08/11/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/03/2023 | 09/15/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/02/2023 | 08/10/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/02/2023 | 08/04/2023 |
| LOCATE | COMPLETE | 08/02/2023 | 08/02/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | CANCEL | 08/02/2023 | 08/04/2023 |
| SW1 | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/02/2023 | 08/02/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Need one additional tree for this lot size | |||
| BADMIN | COMPLETE | 08/02/2023 | 08/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| PLENV | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 08/03/2023 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot | |||
| MECH | COMPLETE | 08/02/2023 | 08/04/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| CONTRACTOR CHANGE | ¤20.00 | 03/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/22/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 03/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/22/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/22/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/22/2024 |
| SW ENG REINSPECTION 30 | ¤30.00 | 03/22/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/22/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/22/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/22/2024 |
| SW ENG - INSPECTION 20 | ¤20.00 | 03/22/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 10/09/2023 |
| SW ENG PRE APRON | ¤30.00 | 10/09/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 10/09/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 10/09/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 10/09/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 10/09/2023 |
| SEWER INSPECTION | ¤25.00 | 10/09/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 10/09/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 10/09/2023 |
| SITE PLAN 30 | ¤30.00 | 10/09/2023 |
| CONNECTION FEES | ¤1,166.26 | 10/09/2023 |
| WATER- TURN ON | ¤25.00 | 10/09/2023 |
| ADJUSTMENT 50% | (¤436.84) | 10/09/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 10/09/2023 |
| INSPECTION - RESIDENTIAL | ¤657.25 | 10/09/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤186.42 | 10/09/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 10/09/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 10/09/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 10/09/2023 |
| IMPACT FEE FIRE | ¤420.52 | 10/09/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 10/09/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 10/09/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 10/09/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 10/09/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 10/09/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 10/09/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 10/09/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 10/09/2023 |
| SURCHARGE FS 533.721 | ¤4.37 | 10/09/2023 |
| SURCHARGE - FS 468.631 | ¤6.55 | 10/09/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 10/09/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤21,697.38 |