Permit #2023080129
Permit Details
Status: COED
| Parcel Id: 07-11-31-7030-00050-0060 |
| CONDITIONED SPACE: 1650 sqft |
| GARAGE: 396 sqft |
| OPENED PORCH (WITH ROOF) : 119 sqft |
| Total Square Footage: 2165 sqft |
| Block: 00050 |
| Subdivision: 2154 - SECTION 30-ROYAL PALMS |
| Job Phone: 202-494-2019 |
| Location Address: 10 RAEMOND LN |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 09/18/2023 |
| NOC: RECORDED |
| Applicant name: GARY ANDREW FISCHER |
| Owner: INB FUND 2 LLC |
|
Address 3670 MAGUIRE BOULEVARD SUITE 220 ORLANDO, FL 32803 |
| Lot: 0060 |
| Contracted Stated Job Value: ¤150,000.00 |
| Job Description: SINGLE FAMILY RESIDENCE |
| Type: CN |
Contractor
INB HOMES
| Status | Location Address | Mailing Address | State License Number | Phone |
| ACTIVE |
3670 MAGUIRE BLVD ORLANDO, FL 32803 |
SUITE 210 ORLANDO, FL 32803 |
CGC048746 (Exp: 08/31/2026) | 407-476-8195 |
Sub Contractors
ROBERT MICHAEL RENNER
| Status | Location Address | State License Number | Phone |
| ACTIVE |
531 CODISCO WAY SANFORD, FL 32771 |
CAC051477 (Exp: 08/31/2026) | 407-333-2665 |
HEATH EDWARD SANFORD
| Status | Location Address | State License Number | Phone |
| ACTIVE |
126 EAST END RD SAN MATEO, FL 32187 |
CFC1429896 (Exp: 08/31/2026) | 386-871-8823 |
TERRY BRICE DICKERSON
| Status | Location Address | State License Number | Phone |
| ACTIVE |
4300 ST JOHN'S PARKWAY ALPHARETTA, GA 30009 |
CCC1326209 (Exp: 08/31/2026) | 407-548-6733 |
JOSEPH C WRIGHT
| Status | Location Address | Mailing Address | State License Number | Phone | Fax |
| ACTIVE |
15 HARGROVE LANE PALM COAST, FL 32137 |
UNIT 3 D PALM COAST, FL 32137 |
EC13003278 (Exp: 08/31/2026) | 386-447-9644 | 386-447-9633 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 03/21/2024 | FINAL APPROVED | AGAETANO |
| Note: 3/19/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 03/19/2024 | CANCELLED BY APPLICANT | WEB |
| BLD - BUILDING FINAL | 03/19/2024 | CANCELLED BY APPLICANT | JWALKER |
| U-CROSS CONNECTION | 03/19/2024 | APPROVED - AS NOTED | LFITZGERALD |
| Note: no irr-no crossconnection | |||
| ROW - STORMWATER FINAL | 03/19/2024 | APPROVED | EMADISON |
| Note: ** 03/19/24 CORRECTIONS MADE ** ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________ 3/15/2024 - PREVIOUS INSPECTION NOTES ** 03/15/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS FIELD SURVEY INSPECTION THAT WAS APPROVED AS NOTED THE CORRECTIONS NEEDED WERE ALSO IN THE (ROW STORMWATER FINAL) ** RIGHT SIDE SWALE AT PROPERTY LINE SHAVE DOWN HIGH SPOT AND RAISE LOW SPOT ___________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 03/14/24 RIGHT SIDE SWALE AT PROPERTY LINE SHAVE DOWN HIGH SPOT AND RAISE LOW SPOT | |||
| U -UTILITY RESIDENTIAL FINAL | 03/15/2024 | FINAL APPROVED | LFITZGERALD |
| ROW - FINAL APRON (AFTER POUR) | 03/15/2024 | APPROVED | EMADISON |
| Note: ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. | |||
| ROW - STORMWATER FINAL | 03/15/2024 | Disapproved -FEE REQUIRED | EMADISON |
| Note: ** 03/15/24 BUILDER NEEDS TO REVIEW NOTES FROM PREVIOUS FIELD SURVEY INSPECTION THAT WAS APPROVED AS NOTED THE CORRECTIONS NEEDED WERE ALSO IN THE (ROW STORMWATER FINAL) ** RIGHT SIDE SWALE AT PROPERTY LINE SHAVE DOWN HIGH SPOT AND RAISE LOW SPOT ___________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 ** 03/14/24 RIGHT SIDE SWALE AT PROPERTY LINE SHAVE DOWN HIGH SPOT AND RAISE LOW SPOT | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 03/14/2024 | APPROVED | EMADISON |
| ROW FIELD SURVEY /GRADING CERTIFICATION | 03/14/2024 | APPROVED - AS NOTED | EMADISON |
| Note: ** 03/14/24 RIGHT SIDE SWALE AT PROPERTY LINE SHAVE DOWN HIGH SPOT AND RAISE LOW SPOT | |||
| ROW- PRE-APRON (PRE-POUR) | 02/23/2024 | APPROVED | PFLANAGAN |
| Note: IT'S YOUR RESPONSIBILITY TO CHECK THE CULVERT ELEVATIONS BEFORE POURING CONCRETE. ALL CONCRETE NEEDS TO BE A MINIMUM OF 3000PSI WITH FIBER OR WITH METAL MESH IN THE CONCRETE TO MEET ALL CITY'S STANDARDS. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. | |||
| U - SEWER TIE IN | 02/09/2024 | APPROVED | MGIBSON |
| Note: 2/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. SEE GRAVITY SEWER NOTE | |||
| GRAVITY SEWER TEST | 02/09/2024 | APPROVED | MGIBSON |
| Note: 2/7/2024 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2060 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. GRAVITY SEWER NOT RAN, NORE IS SEWER TAP MADE | |||
| ELECTRIC - EARLY POWER | 02/08/2024 | APPROVED | JWALKER |
| ELECTRIC-TUG | 02/07/2024 | APPROVED | JWALKER |
| Note: 1/11/2024 - PREVIOUS INSPECTION NOTES NEED TO RE-ATTACH GROUNDING ELECTRODE CONDUCTOR TO 2ND GROUND ROD | |||
| GRAVITY SEWER TEST | 02/07/2024 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. GRAVITY SEWER NOT RAN, NORE IS SEWER TAP MADE | |||
| U - SEWER TIE IN | 02/07/2024 | Disapproved - NO FEE | MGIBSON |
| Note: Inspector Notes from Inspection 2060 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. SEE GRAVITY SEWER NOTE | |||
| PEP TANK INSTALLATION REQUEST | 01/30/2024 | APPROVED | BVITALE |
| LATH/BRICK/ WATER BARRIER | 01/24/2024 | APPROVED | JWALKER |
| Note: 1/23/2024 - PREVIOUS INSPECTION NOTES The zip tape used at the rear slider needs to have wire mesh over top of it installed. Zip tape is not an approved sub surface for plaster. | |||
| LATH/BRICK/ WATER BARRIER | 01/23/2024 | Disapproved - NO FEE | JWALKER |
| Note: The zip tape used at the rear slider needs to have wire mesh over top of it installed. Zip tape is not an approved sub surface for plaster. | |||
| INSULATION | 01/17/2024 | APPROVED | JWALKER |
| Note: Inspector Notes from Inspection 2420 1. The 14" flex duct above the living room area is not supported and is being constricted at the turns. The duct needs to be lengthened, lifted off the trusses bottom chords and supported. Reseal where it meets the supply plenum also. Please have correction completed prior to scheduling the insulation inspection. | |||
| ALL ROUGH | 01/12/2024 | APPROVED - AS NOTED | JWALKER |
| Note: 1. The 14" flex duct above the living room area is not supported and is being constricted at the turns. The duct needs to be lengthened, lifted off the trusses bottom chords and supported. Reseal where it meets the supply plenum also. Please have correction completed prior to scheduling the insulation inspection. | |||
| ELECTRIC-TUG | 01/11/2024 | Disapproved - NO FEE | RMARTIN |
| Note: NEED TO RE-ATTACH GROUNDING ELECTRODE CONDUCTOR TO 2ND GROUND ROD | |||
| ROOF VALLEY & METAL | 01/08/2024 | APPROVED | JWALKER |
| Note: 1/4/2024 - PREVIOUS INSPECTION NOTES 1/4/24 Correction listed below still has not been made. 12/28/2023 - PREVIOUS INSPECTION NOTES 12/28/23 Below listed correction has not been made. 12/18/2023 - PREVIOUS INSPECTION NOTES 1. The left side and rear of the building roof. 1st row of synthetic underlayment is to be double. R-905 | |||
| ROOF VALLEY & METAL | 01/04/2024 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 1/4/24 Correction listed below still has not been made. 12/28/2023 - PREVIOUS INSPECTION NOTES 12/28/23 Below listed correction has not been made. 12/18/2023 - PREVIOUS INSPECTION NOTES 1. The left side and rear of the building roof. 1st row of synthetic underlayment is to be double. R-905 | |||
| ROOF VALLEY & METAL | 01/03/2024 | CANCELLED BY APPLICANT | WEB |
| Note: 12/28/2023 - PREVIOUS INSPECTION NOTES 12/28/23 Below listed correction has not been made. 12/18/2023 - PREVIOUS INSPECTION NOTES 1. The left side and rear of the building roof. 1st row of synthetic underlayment is to be double. R-905 | |||
| ROOF VALLEY & METAL | 12/28/2023 | Disapproved -FEE REQUIRED | JWALKER |
| Note: 12/28/23 Below listed correction has not been made. 12/18/2023 - PREVIOUS INSPECTION NOTES 1. The left side and rear of the building roof. 1st row of synthetic underlayment is to be double. R-905 | |||
| ROOF VALLEY & METAL | 12/18/2023 | Disapproved - NO FEE | JWALKER |
| Note: 1. The left side and rear of the building roof. 1st row of synthetic underlayment is to be double. R-905 | |||
| WALL SHEATHING | 12/13/2023 | APPROVED | JWALKER |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 12/13/2023 | APPROVED | JWALKER |
| FOUND SURVEY APPROVED (OFFICE) | 12/06/2023 | APPROVED | TBAKER |
| TIE BEAM / LINTEL | 12/01/2023 | APPROVED | JWALKER |
| MONOLITHIC SLAB | 11/13/2023 | APPROVED | JWALKER |
| Note: 11/9/2023 - PREVIOUS INSPECTION NOTES 11/9/23 1. Rear prorch, slider wall right side corner. the F-1 footing at the corner 2' x 2' has not been dug. 2. The water service pipe listed from the plumbing 1st rough has not been corrected. 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. | |||
| MONOLITHIC SLAB | 11/09/2023 | Disapproved - NO FEE | JWALKER |
| Note: 11/9/23 1. Rear prorch, slider wall right side corner. the F-1 footing at the corner 2' x 2' has not been dug. 2. The water service pipe listed from the plumbing 1st rough has not been corrected. 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 11/03/2023 | APPROVED - AS NOTED | JWALKER |
| Note: 1. Water service pipe is either covered or not installed. Pipe will need to be installed and exposed at the mono slab inspection. | |||
| WATER METER INSTALLATION REQUEST | 10/11/2023 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| MECH | COMPLETE | 03/14/2024 | 03/14/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/24/2024 | 01/25/2024 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 12/06/2023 | 12/06/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 12/06/2023 | 12/06/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| ENGIN1 | HOLD | 11/01/2023 | 11/02/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Formboard survey is unacceptable as foundation survey. Please submit foundation survey showing location, dimensions and elevation of finished concrete foundation/slab. | |||
| ZON | COMPLETE | 11/01/2023 | 11/01/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 09/01/2023 | 09/12/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 09/01/2023 | 09/01/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 09/01/2023 | 09/01/2023 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 08/15/2023 | 08/16/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/15/2023 | 08/23/2023 |
| Note: Held By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM PLEASE READ NOTES ON LAST REVIEW FOR CHANGES | |||
| ZON | COMPLETE | 08/15/2023 | 08/15/2023 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/15/2023 | 08/17/2023 |
| Note: Released By: JPI | |||
| SWALE | COMPLETE | 08/03/2023 | 09/18/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/02/2023 | 08/10/2023 |
| Note: Released By: JPI | |||
| CUSVC | HOLD | 08/02/2023 | 08/02/2023 |
| Note: Held By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM Please correct the utility application to reflect the correct parcel number and property address. | |||
| ELEC | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/02/2023 | 08/04/2023 |
| LOCATE | COMPLETE | 08/02/2023 | 08/03/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | COMPLETE | 08/02/2023 | 08/04/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SW1 | HOLD | 08/02/2023 | 08/03/2023 |
| Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM The front property line/right away elevation are to be equal to or greater than thecenterline of the road elevation. As per Land Development Code Technical Manual, Section 300, Drawing 300.D, | |||
| ZON | HOLD | 08/02/2023 | 08/03/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location on landscape plan doesn't match plans and site plan All windows and doors facing ROW must have banding placed around them | |||
| BADMIN | COMPLETE | 08/02/2023 | 08/10/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| SW ENG REINSPECTION 20 | ¤20.00 | 03/18/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/15/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 03/15/2024 |
| CONNECTION FEES | ¤1,166.26 | 09/18/2023 |
| FIRE IMPACT FEE ADMIN | ¤12.62 | 09/18/2023 |
| FIRE IMPACT FEE ADMIN | (¤12.62) | 09/18/2023 |
| FC IMPACT FEE EMS | ¤62.00 | 09/18/2023 |
| IMPACT FEE FIRE | ¤420.52 | 09/18/2023 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 09/18/2023 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 09/18/2023 |
| IMPACT FEE PARKS | ¤1,769.15 | 09/18/2023 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 09/18/2023 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 09/18/2023 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 09/18/2023 |
| PARKS IMPACT FEE ADMIN | ¤53.07 | 09/18/2023 |
| PARKS IMPACT FEE ADMIN | (¤53.07) | 09/18/2023 |
| SURCHARGE FS 533.721 | ¤3.75 | 09/18/2023 |
| SURCHARGE - FS 468.631 | ¤5.63 | 09/18/2023 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 09/18/2023 |
| SW ENG INSPECTION 80 | ¤80.00 | 09/18/2023 |
| SW ENG PRE APRON | ¤30.00 | 09/18/2023 |
| SW ENG - REVIEW 20 | ¤20.00 | 09/18/2023 |
| SW ENG RES REVIEW 200 | ¤200.00 | 09/18/2023 |
| TRANS IMPACT FEE ADMIN | ¤54.36 | 09/18/2023 |
| TRANS IMPACT FEE ADMIN | (¤54.36) | 09/18/2023 |
| SEWER CREDIT | (¤1,147.00) | 09/18/2023 |
| SEWER INSPECTION | ¤25.00 | 09/18/2023 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 09/18/2023 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 09/18/2023 |
| SITE PLAN 30 | ¤30.00 | 09/18/2023 |
| WATER- TURN ON | ¤25.00 | 09/18/2023 |
| ADJUSTMENT 50% | (¤375.06) | 09/18/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 09/18/2023 |
| INSPECTION - RESIDENTIAL | ¤561.00 | 09/18/2023 |
| PLAN REVIEW - RESIDENTIAL | ¤159.12 | 09/18/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤20,267.07 |