Permit #2023080173

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00180-0070
CONDITIONED SPACE: 2295 sqft
GARAGE: 538 sqft
OPENED PORCH (WITH ROOF) : 201 sqft
OPENED PORCH (WITH ROOF) : 229 sqft
Total Square Footage: 3263 sqft
Block: 00180
Subdivision: 2123 - SECTION 57-ULYSSES TREES
Job Phone: 912-258-2201
Location Address: 50 UHL PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 08/24/2023
NOC: RECORDED
Applicant name: JAMES FUCETOLA III
Owner: PALM COAST COMMUNITIES LLC

Address

PO BOX 22547

ST SIMONS ISLAND, GA 31522

Lot: 0070
Contracted Stated Job Value: ¤195,000.00
Job Description: Single Family Residence
Type: CN

Contractor

PALM COAST COMMUNITIES LLC
Status Location Address State License Number Phone
INACTIVE

PO BOX 22547

PALM COAST, FL 32164

CBC1262878 (Exp: 08/31/2026) 321-501-4617

Sub Contractors

WILLIAM FRANK DUDLEY JR.
Status Location Address State License Number Phone
ACTIVE

P.O. BOX 978

Bunnell, FL 32110

EC0003177 (Exp: 08/31/2026) (386)437-3068
OLEG BELINSKIY
Status Location Address State License Number Phone
ACTIVE

19 PINE CIRCLE DRIVE19

PALM COAST, FL 32167

CCC1325974 (Exp: 08/31/2026) 386-263-7906
GARY LLOYD SHEFFIELD
Status Location Address State License Number Phone
ACTIVE

48 EAGLE LAKES DRIVE

FLAGLER BEACH, FL 32136

CAC048127 (Exp: 08/31/2026) 386-597-3280
JEFFREY TROY SABAKA
Status Location Address State License Number Phone Fax
ACTIVE

2191 DEERWOOD ACRES DR

ST AUGUSTINE, FL 32084

CFC1427439 (Exp: 08/31/2026) 904-838-2218 904-819-0965

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 02/22/2024 FINAL APPROVED BTAYLOR
U -UTILITY RESIDENTIAL FINAL 02/22/2024 FINAL APPROVED JHARDING
Note: Inspector Notes from Inspection 9035 No cross connections.
ROW - FINAL APRON (AFTER POUR) 02/21/2024 APPROVED - AS NOTED FSLADISH
Note: 2/21/24 PIPE IS GOOD. CUTS ARE MADE. CULVERTS CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/21/24 MINIMUM COPC STANDARDS MET AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 2/21/24 REQUIRED ELEVATION SHOTS ADDED. 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 I NEED ELEVATION SHOTS IN THE REAR AT THE 5 FT LINE EVERY 20FT TO DETERMINE IF DRAINAGE HAS POSITIVE FLOW AROUND AND FOWARD FROM REAR. THE RIGHT SIDE I ALSO NEED TO SEE ELEVATION SHOTS AS INDICATED ON YOUR SITE PLAN ALONG THE OFFSET TO DETERMINE IF YOU HAVE .10 OF FALL FROM REAR TO FRONT EVERY 2O FT AS IS INDICATED BY YOUR PROPOSED ELEVATIONS IN YOUR SITE PLAN. Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) 2/21/24 MINIMUM COPC STRANRDS MET AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 2/13/24 WILL HAVE A SITE MEET WITH BUILDER/GRADER TO DISCUSS RIGHT SIDE GRADING REQUIREMENTS.
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/21/2024 APPROVED - AS NOTED FSLADISH
Note: 2/21/24 REQUIRED ELEVATION SHOTS ADDED. 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 I NEED ELEVATION SHOTS IN THE REAR AT THE 5 FT LINE EVERY 20FT TO DETERMINE IF DRAINAGE HAS POSITIVE FLOW AROUND AND FOWARD FROM REAR. THE RIGHT SIDE I ALSO NEED TO SEE ELEVATION SHOTS AS INDICATED ON YOUR SITE PLAN ALONG THE OFFSET TO DETERMINE IF YOU HAVE .10 OF FALL FROM REAR TO FRONT EVERY 2O FT AS IS INDICATED BY YOUR PROPOSED ELEVATIONS IN YOUR SITE PLAN. Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)
ROW FIELD SURVEY /GRADING CERTIFICATION 02/21/2024 APPROVED - AS NOTED FSLADISH
Note: 2/21/24 MINIMUM COPC STANDARDS MET AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 2/21/24 REQUIRED ELEVATION SHOTS ADDED. 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 I NEED ELEVATION SHOTS IN THE REAR AT THE 5 FT LINE EVERY 20FT TO DETERMINE IF DRAINAGE HAS POSITIVE FLOW AROUND AND FOWARD FROM REAR. THE RIGHT SIDE I ALSO NEED TO SEE ELEVATION SHOTS AS INDICATED ON YOUR SITE PLAN ALONG THE OFFSET TO DETERMINE IF YOU HAVE .10 OF FALL FROM REAR TO FRONT EVERY 2O FT AS IS INDICATED BY YOUR PROPOSED ELEVATIONS IN YOUR SITE PLAN. Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) 2/21/24 MINIMUM COPC STRANRDS MET AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 2/13/24 WILL HAVE A SITE MEET WITH BUILDER/GRADER TO DISCUSS RIGHT SIDE GRADING REQUIREMENTS.
ROW - STORMWATER FINAL 02/21/2024 APPROVED - AS NOTED FSLADISH
Note: 2/21/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9272 2/21/24 PIPE IS GOOD. CUTS ARE MADE. CULVERTS CLEAR. HOT PATCH COMPLETED. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. _______________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 2/21/24 MINIMUM COPC STANDARDS MET AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9463 2/21/24 REQUIRED ELEVATION SHOTS ADDED. 2/13/2024 - PREVIOUS INSPECTION NOTES 2/13/24 I NEED ELEVATION SHOTS IN THE REAR AT THE 5 FT LINE EVERY 20FT TO DETERMINE IF DRAINAGE HAS POSITIVE FLOW AROUND AND FOWARD FROM REAR. THE RIGHT SIDE I ALSO NEED TO SEE ELEVATION SHOTS AS INDICATED ON YOUR SITE PLAN ALONG THE OFFSET TO DETERMINE IF YOU HAVE .10 OF FALL FROM REAR TO FRONT EVERY 2O FT AS IS INDICATED BY YOUR PROPOSED ELEVATIONS IN YOUR SITE PLAN. Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B) 2/21/24 MINIMUM COPC STRANRDS MET AT THE TIME OF THIS INSPECTION. At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________________ 2/13/24 WILL HAVE A SITE MEET WITH BUILDER/GRADER TO DISCUSS RIGHT SIDE GRADING REQUIREMENTS.
ROW- PROJECT STATUS 02/15/2024 APPROVED GBERTOLA
Note: MEETING WITH THE BUILDER AND THE INSPECTOR
ROW- FINAL SURVEY/GRADING CERTIFICATION 02/13/2024 Disapproved - NO FEE FSLADISH
Note: 2/13/24 I NEED ELEVATION SHOTS IN THE REAR AT THE 5 FT LINE EVERY 20FT TO DETERMINE IF DRAINAGE HAS POSITIVE FLOW AROUND AND FOWARD FROM REAR. THE RIGHT SIDE I ALSO NEED TO SEE ELEVATION SHOTS AS INDICATED ON YOUR SITE PLAN ALONG THE OFFSET TO DETERMINE IF YOU HAVE .10 OF FALL FROM REAR TO FRONT EVERY 2O FT AS IS INDICATED BY YOUR PROPOSED ELEVATIONS IN YOUR SITE PLAN. Rear Yard Drainage Sec 300.01(4,5,6) Sec 300.01(4,5,6) The tolerance along side lot lines is no more than 20 feet flat, with positive fall on each side.Positive fall is considered to be 0.10 feet in 20 feet.The minimum fall from the rear property line to the front is 0.50 feet Must have enough elevations to show drainage flow pattern Sec 300.01D2 Sec 300.01 D3 The interior elevations at no greater than a 20 foot grid. There must be sufficient elevation shots to indicate the intended drainage pattern Lot must drain. Sec 300.01 (A)(1)(C)(6) Sec 300.01 (A)(1)(C)(6). Unless specifically stated the subject lot must drain from back to front or a portion may be drained to an adjacent City drainage feature. (B)
U-CROSS CONNECTION 02/08/2024 APPROVED - AS NOTED JHARDING
Note: No cross connections.
ELECTRIC - EARLY POWER 01/11/2024 APPROVED RMARTIN
ROW- PRE-APRON (PRE-POUR) 01/09/2024 APPROVED GBERTOLA
Note: 1/9/23=AT THE TIME OF THE INSPECTION, THE CULVERT PIPE IS GOOD AND READY TO POUR; THE BUILDER SHOULD DOUBLE-CHECK THE CULVERT ELEVATIONS BEFORE POURING. MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300E RESIDENTIAL CULVERT DETAIL ++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++++ 1/8/2024 - PREVIOUS INSPECTION NOTES NO READY FOR INSPECTION. NOT FORMED YET
ROW- PRE-APRON (PRE-POUR) 01/08/2024 Disapproved -FEE REQUIRED GBERTOLA
Note: NO READY FOR INSPECTION. NOT FORMED YET
U - SEWER TIE IN 12/18/2023 APPROVED - AS NOTED MGIBSON
Note: THIS WAS A VIRTUAL INSPECTION
LATH/BRICK/ WATER BARRIER 12/01/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 11/27/23: Check at Insulation Inspection. * Please have address added to job box or window as required by FBC 319.1 / 501.2 * Bedroom 4 Left side of left window is missing an anchor in the middle. 11/22/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11-17-23 1. Overframing needs to be straped to trusses below.
INSULATION 12/01/2023 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 11/27/23: Check at Insulation Inspection. * Please have address added to job box or window as required by FBC 319.1 / 501.2 * Bedroom 4 Left side of left window is missing an anchor in the middle. 11/22/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11-17-23 1. Overframing needs to be straped to trusses below.
ALL ROUGH 11/27/2023 APPROVED - AS NOTED RSIMS
Note: 11/27/23: Check at Insulation Inspection. * Please have address added to job box or window as required by FBC 319.1 / 501.2 * Bedroom 4 Left side of left window is missing an anchor in the middle. 11/22/2023 - PREVIOUS INSPECTION NOTES Inspector Notes from Inspection 2460 11-17-23 1. Overframing needs to be straped to trusses below.
ALL ROUGH 11/22/2023 CANCELLED BY APPLICANT BTAYLOR
Note: Inspector Notes from Inspection 2460 11-17-23 1. Overframing needs to be straped to trusses below.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 11/17/2023 APPROVED - AS NOTED BTAYLOR
Note: 11-17-23 1. Overframing needs to be straped to trusses below.
ROOF VALLEY & METAL 11/14/2023 APPROVED BTAYLOR
ROOF SHEATHING 11/03/2023 APPROVED BTAYLOR
WALL SHEATHING 11/03/2023 APPROVED BTAYLOR
TIE BEAM / LINTEL 10/25/2023 APPROVED BTAYLOR
FOUND SURVEY APPROVED (OFFICE) 10/23/2023 APPROVED TBAKER
MONOLITHIC SLAB 10/05/2023 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 10/04/2023 APPROVED BTAYLOR
GRAVITY SEWER TEST 10/04/2023 APPROVED BTAYLOR
WATER METER INSTALLATION REQUEST 09/25/2023 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
BLD COMPLETE 11/08/2023 11/13/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ZON COMPLETE 10/23/2023 10/23/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/23/2023 10/23/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/22/2023 09/22/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 08/25/2023 08/25/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark on survey shown in wrong location - should be at opposite property line.
ZON COMPLETE 08/17/2023 08/17/2023
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON HOLD 08/16/2023 08/16/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Landscape plan not for this address
ZON HOLD 08/14/2023 08/14/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM House layout on landscape plan doesn't match plans and site plan
SWALE COMPLETE 08/03/2023 09/29/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 08/02/2023 08/10/2023
Note: Released By: JPI
CUSVC COMPLETE 08/02/2023 08/07/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 08/02/2023 08/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/02/2023 08/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/02/2023 08/04/2023
LOCATE COMPLETE 08/02/2023 08/04/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/02/2023 08/04/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/02/2023 08/09/2023
Note: Released By: PARREN FLANAGAN - (386)986-2392 - PFLANAGAN@PALMCOASTGOV.COM
ZON HOLD 08/02/2023 08/04/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Trees: One tree for every 2500 square ft. All calculations are rounded to the nearest whole number. This property requires 5 trees please make sure its a shade tree as there are 4 crepe myrtes already.
BADMIN INFORMATION 08/02/2023 08/02/2023
Note: Marked INFORMATION By: BARBIE BEMBRY - (386)986-3780 - BUILDINGDIVISION@PALMCOASTGOV.COM NOC need to include the contractor name and address. Please correct and re-record.
BADMIN COMPLETE 08/02/2023 08/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
SW ENG REINSPECTION 20 ¤20.00 02/23/2024
SW ENG REINSPECTION 30 ¤30.00 02/23/2024
SW ENG - REVIEW 20 ¤20.00 08/24/2023
SW ENG RES REVIEW 200 ¤200.00 08/24/2023
TRANS IMPACT FEE ADMIN ¤54.36 08/24/2023
TRANS IMPACT FEE ADMIN (¤54.36) 08/24/2023
SEWER CREDIT (¤850.00) 08/24/2023
SEWER INSPECTION ¤25.00 08/24/2023
SEWER CAPITAL FACILITY ¤5,344.82 08/24/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 08/24/2023
SITE PLAN 30 ¤30.00 08/24/2023
WATER- TURN ON ¤25.00 08/24/2023
ADJUSTMENT 50% (¤533.91) 08/24/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 08/24/2023
INSPECTION - RESIDENTIAL ¤808.50 08/24/2023
PLAN REVIEW - RESIDENTIAL ¤229.32 08/24/2023
CONNECTION FEES ¤1,166.26 08/24/2023
FIRE IMPACT FEE ADMIN ¤12.62 08/24/2023
FIRE IMPACT FEE ADMIN (¤12.62) 08/24/2023
FC IMPACT FEE EMS ¤62.00 08/24/2023
IMPACT FEE FIRE ¤420.52 08/24/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 08/24/2023
FC IMPACT FEE LIBRARY ¤268.00 08/24/2023
IMPACT FEE PARKS ¤1,769.15 08/24/2023
IMPACT FEE SCHOOL ¤5,450.00 08/24/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 08/24/2023
WATER -IRRIGATION INSPECTION ¤25.00 08/24/2023
PARKS IMPACT FEE ADMIN ¤53.07 08/24/2023
PARKS IMPACT FEE ADMIN (¤53.07) 08/24/2023
SURCHARGE FS 533.721 ¤5.34 08/24/2023
SURCHARGE - FS 468.631 ¤8.01 08/24/2023
SW ENG - FOUNDATION SURVEY ¤20.00 08/24/2023
SW ENG INSPECTION 80 ¤80.00 08/24/2023
SW ENG PRE APRON ¤30.00 08/24/2023
Fees Total Due: ¤0.00 Total Paid: ¤20,636.89