I want to search for...
Permit #2023080181
Permit Details
Status: COED
| Parcel Id: 07-11-31-7057-00170-0030 |
| CONDITIONED SPACE: 2306 sqft |
| GARAGE: 466 sqft |
| OPENED PORCH (WITH ROOF) : 170 sqft |
| Total Square Footage: 2942 sqft |
| Block: 00170 |
| Subdivision: - |
| Job Phone: 831-383-2883 |
| Location Address: 74 UHL PATH |
| Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY |
| Issue Date: 01/24/2024 |
| NOC: RECORDED |
| Applicant name: EDWARD LEE DAUBERT JR |
| Owner: FLORIDA SUN PARTNERS II LLC |
|
Address 6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
| Lot: 0030 |
| Contracted Stated Job Value: ¤220,324.00 |
| Job Description: Single Family Residence |
| Type: CN |
Contractor
BRITE BUILDING GROUP LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
6751 FORUM DRIVE SUITE 210 ORLANDO, FL 32821 |
CBC1266303 (Exp: 08/31/2026) | 831-383-2883 |
Sub Contractors
DUSTIN L ESTEP
| Status | Location Address | State License Number | Phone | Fax |
| ACTIVE |
2041 N HIAWASSEE RD APOPKA, FL 32703 |
CCC1330971 (Exp: 08/31/2026) | 407-702-0206 | 352-988-6629 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CAC1820196 (Exp: 08/31/2026) | 407-404-4000 |
ANTHONY OKEITH FENNELL
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N. WESTMONTE DR, SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
EC13011194 (Exp: 08/31/2026) | 407-404-4000 |
JASON LEE JAMES
| Status | Location Address | State License Number | Phone |
| ACTIVE |
217 N WESTMONTE DR SUITE 1007 ALTAMONTE SPRINGS, FL 32714 |
CFC1430061 (Exp: 08/31/2026) | 407-404-4000 |
Inspection History
| Type | Request Date | Result | Inspector |
| BLD - BUILDING FINAL | 08/29/2024 | FINAL APPROVED | BTAYLOR |
| Note: 8/28/2024 - PREVIOUS INSPECTION NOTES 8-28-24 1. Missing air registerin den and back porch. 2. No shower heads in any of the bathrooms. 3. Tile is not complete in master water closet. | |||
| ROW - STORMWATER FINAL | 08/29/2024 | APPROVED | FSLADISH |
| Note: 8/29/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________ 8/28/2024 - PREVIOUS INSPECTION NOTES 8/28/24 CULVERT PIPE IS FULL OF DIRT AT THE TIME OF THIS INSPECTION. THE ENTIRE PIPE WILL NEED TO BE CLEANED OUT TO ALLOW FLOW BEFORE ROW FINAL PASSAGE. I AM NOT GOING TO FEE YOU TODAT AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES | |||
| U -UTILITY RESIDENTIAL FINAL | 08/28/2024 | FINAL APPROVED | BWRIGHT |
| ROW - STORMWATER FINAL | 08/28/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 8/28/24 CULVERT PIPE IS FULL OF DIRT AT THE TIME OF THIS INSPECTION. THE ENTIRE PIPE WILL NEED TO BE CLEANED OUT TO ALLOW FLOW BEFORE ROW FINAL PASSAGE. I AM NOT GOING TO FEE YOU TODAT AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES | |||
| BLD - BUILDING FINAL | 08/28/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 8-28-24 1. Missing air registerin den and back porch. 2. No shower heads in any of the bathrooms. 3. Tile is not complete in master water closet. | |||
| U-CROSS CONNECTION | 08/28/2024 | APPROVED - AS NOTED | BWRIGHT |
| Note: IRR with potable water. PVB in place. No CC. | |||
| ROW - FINAL APRON (AFTER POUR) | 08/28/2024 | APPROVED | FSLADISH |
| Note: 8/28/24 PIPE ELEVATION GOOD. CUTS MADE. CULVERT FULL OF DIRT (HOLD ONROW FINAL) HOT PATCH ROAD REPAIRS COMPLETED AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/27/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/27/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES | |||
| ROW FIELD SURVEY /GRADING CERTIFICATION | 08/26/2024 | CANCELLED BY APPLICANT | FSLADISH |
| ROW- FINAL SURVEY/GRADING CERTIFICATION | 08/15/2024 | Disapproved - NO FEE | FSLADISH |
| Note: 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| ELECTRIC - EARLY POWER | 07/31/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 7-31-24 1. Emailed FPL at 3:06. | |||
| FLOOR / WALL PENETRATION | 07/25/2024 | APPROVED | BTAYLOR |
| ELECTRIC-TUG | 06/27/2024 | APPROVED | RMARTIN |
| Note: 4/24/2024 - PREVIOUS INSPECTION NOTES 4-24-24 1. Wire and ground chase are not strapped to house | |||
| GRAVITY SEWER TEST | 06/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3/28/2024 - PREVIOUS INSPECTION NOTES NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE. NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE, ALSO WILL CHECK COVERAGE AT SLAB INSPECTION FOR WATER DISTRIBUTION LINES AND WASTE IN GARAGE AREA AND GUEST BATHROOM THIS WAS A VIRTUAL INSPECTION | |||
| U - SEWER TIE IN | 06/13/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: Inspector Notes from Inspection 2060 3/28/2024 - PREVIOUS INSPECTION NOTES NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE. NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE, ALSO WILL CHECK COVERAGE AT SLAB INSPECTION FOR WATER DISTRIBUTION LINES AND WASTE IN GARAGE AREA AND GUEST BATHROOM THIS WAS A VIRTUAL INSPECTION | |||
| ROW- PRE-APRON (PRE-POUR) | 06/13/2024 | APPROVED - AS NOTED | FSLADISH |
| Note: 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. | |||
| INSULATION | 05/17/2024 | APPROVED | BTAYLOR |
| LATH/BRICK/ WATER BARRIER | 05/13/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2420 5-9-24 1. Electrical panel needs metal plug in top. 2. Where electrical panel is framed in needs fire blocking at the top plate. 3. Windows do not have matching florida approval numbers. Check at insulation. | |||
| ALL ROUGH | 05/09/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 5-9-24 1. Electrical panel needs metal plug in top. 2. Where electrical panel is framed in needs fire blocking at the top plate. 3. Windows do not have matching florida approval numbers. Check at insulation. | |||
| ROOF VALLEY & METAL | 05/02/2024 | APPROVED | BTAYLOR |
| Note: Inspector Notes from Inspection 2460 4-26-24 1. Missing engineering. | |||
| WALL SHEATHING | 04/26/2024 | APPROVED | BTAYLOR |
| ROOF SHEATHING / BRACES/TIES/DOWN CELL | 04/26/2024 | APPROVED - AS NOTED | BTAYLOR |
| Note: 4-26-24 1. Missing engineering. | |||
| ELECTRIC-TUG | 04/24/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 4-24-24 1. Wire and ground chase are not strapped to house | |||
| TIE BEAM / LINTEL | 04/16/2024 | APPROVED | BTAYLOR |
| Note: 4/15/2024 - PREVIOUS INSPECTION NOTES 4/11/2024 - PREVIOUS INSPECTION NOTES 4-11-24 1. Majority of drills pulled out . 2. Mud beds exceed 1/2" max depth. All are circled on plans. 4-15-24 1. 1 of the three dowels pulled again. Circled on plans. | |||
| TIE BEAM / LINTEL | 04/15/2024 | Disapproved - NO FEE | BTAYLOR |
| Note: 4/11/2024 - PREVIOUS INSPECTION NOTES 4-11-24 1. Majority of drills pulled out . 2. Mud beds exceed 1/2" max depth. All are circled on plans. 4-15-24 1. 1 of the three dowels pulled again. Circled on plans. | |||
| FOUND SURVEY APPROVED (OFFICE) | 04/15/2024 | APPROVED | TDOAK |
| TIE BEAM / LINTEL | 04/11/2024 | Disapproved -FEE REQUIRED | BTAYLOR |
| Note: 4-11-24 1. Majority of drills pulled out . 2. Mud beds exceed 1/2" max depth. All are circled on plans. | |||
| MONOLITHIC SLAB | 04/03/2024 | APPROVED | BTAYLOR |
| PLUMBING 1ST ROUGH UNDERGROUND | 04/01/2024 | APPROVED - AS NOTED | MGIBSON |
| Note: 3/28/2024 - PREVIOUS INSPECTION NOTES NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE. NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE, ALSO WILL CHECK COVERAGE AT SLAB INSPECTION FOR WATER DISTRIBUTION LINES AND WASTE IN GARAGE AREA AND GUEST BATHROOM | |||
| PLUMBING 1ST ROUGH UNDERGROUND | 03/28/2024 | Disapproved -FEE REQUIRED | MGIBSON |
| Note: NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE | |||
| WATER METER INSTALLATION REQUEST | 03/07/2024 | APPROVED | CBOWERMASTER |
Review History
| Department | Status | Date In | Date Out |
| ENGIN1 | COMPLETE | 08/23/2024 | 08/23/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 08/23/2024 | 08/26/2024 |
| Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD | |||
| ZON | COMPLETE | 08/23/2024 | 08/23/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 07/10/2024 | 07/10/2024 |
| Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 05/13/2024 | 05/17/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM KS | |||
| MECH | COMPLETE | 04/29/2024 | 05/02/2024 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 04/15/2024 | 04/15/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| ZON | COMPLETE | 01/03/2024 | 01/03/2024 |
| Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 01/03/2024 | 01/05/2024 |
| Note: Released By: JPI | |||
| ZON | HOLD | 12/21/2023 | 12/21/2023 |
| Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Front elevation not submitted last one was rejected | |||
| BLD | COMPLETE | 12/21/2023 | 12/27/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ZON | HOLD | 12/11/2023 | 12/11/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New plans missing the elevation pages Window facing right of way must have banding. Left side facing street. | |||
| ZON | HOLD | 10/04/2023 | 10/05/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Walkway material missing from site plan/survey Window facing row must have banding. Left side facing street. | |||
| MECH | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| CUSVC | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 10/04/2023 | 10/09/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 10/04/2023 | 10/05/2023 |
| LOCATE | COMPLETE | 10/04/2023 | 10/06/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| SW1 | COMPLETE | 10/04/2023 | 10/05/2023 |
| Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM | |||
| BLD | COMPLETE | 08/03/2023 | 08/10/2023 |
| Note: Released By: JPI | |||
| CUSVC | COMPLETE | 08/03/2023 | 08/07/2023 |
| Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM | |||
| ELEC | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM | |||
| ENGIN1 | COMPLETE | 08/03/2023 | 08/03/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM | |||
| GAS | CANCEL | 08/03/2023 | 08/04/2023 |
| LOCATE | COMPLETE | 08/03/2023 | 08/08/2023 |
| Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM | |||
| MECH | HOLD | 08/03/2023 | 08/04/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition | |||
| SW1 | COMPLETE | 08/03/2023 | 08/09/2023 |
| Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM | |||
| ZON | HOLD | 08/03/2023 | 08/03/2023 |
| Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Legal description missing on site plan/survey Flood panel number missing on site plan/survey Walkway material missing from site plan/survey Window facing row must have banding. Left side facing street. | |||
| BADMIN | COMPLETE | 08/03/2023 | 08/11/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| SWALE | COMPLETE | 08/03/2023 | 09/19/2023 |
| Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| PLAN REVIEW - REVISION | ¤32.50 | 08/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 08/29/2024 |
| REINSPECTION RESIDENTIAL | ¤40.00 | 04/02/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/02/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/02/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 04/02/2024 |
| FC IMPACT FEE EMS | ¤62.00 | 01/24/2024 |
| IMPACT FEE FIRE | ¤428.09 | 01/24/2024 |
| FC IMPACT FEE LAW ENFORCEMENT | ¤218.00 | 01/24/2024 |
| FC IMPACT FEE LIBRARY | ¤268.00 | 01/24/2024 |
| IMPACT FEE PARKS | ¤1,800.99 | 01/24/2024 |
| IMPACT FEE SCHOOL | ¤5,450.00 | 01/24/2024 |
| IMPACT FEE TRANSPORTATION | ¤1,812.00 | 01/24/2024 |
| WATER -IRRIGATION INSPECTION | ¤25.00 | 01/24/2024 |
| SURCHARGE FS 533.721 | ¤2.93 | 01/24/2024 |
| SURCHARGE - FS 468.631 | ¤4.39 | 01/24/2024 |
| SW ENG - FOUNDATION SURVEY | ¤20.00 | 01/24/2024 |
| SW ENG INSPECTION 80 | ¤80.00 | 01/24/2024 |
| SW ENG PRE APRON | ¤30.00 | 01/24/2024 |
| SW ENG - REVIEW 20 | ¤20.00 | 01/24/2024 |
| SW ENG RES REVIEW 200 | ¤200.00 | 01/24/2024 |
| SEWER CREDIT | (¤2,501.34) | 01/24/2024 |
| SEWER INSPECTION | ¤25.00 | 01/24/2024 |
| SEWER CAPITAL FACILITY | ¤5,344.82 | 01/24/2024 |
| WATER CREDIT | (¤125.79) | 01/24/2024 |
| WATER CAPITAL FACILITY FEE | ¤3,923.88 | 01/24/2024 |
| SITE PLAN 30 | ¤30.00 | 01/24/2024 |
| CONNECTION FEES | ¤1,166.26 | 01/24/2024 |
| CONTRACTOR CHANGE | ¤20.00 | 01/24/2024 |
| WATER- TURN ON | ¤25.00 | 01/24/2024 |
| ADJUSTMENT 50% | (¤512.73) | 01/24/2024 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 01/24/2024 |
| INSPECTION - RESIDENTIAL | ¤775.50 | 01/24/2024 |
| PLAN REVIEW - RESIDENTIAL | ¤219.96 | 01/24/2024 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤19,014.46 |