Permit #2023080181

Permit Details

Status: COED

Parcel Id: 07-11-31-7057-00170-0030
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
Total Square Footage: 2942 sqft
Block: 00170
Subdivision: -
Job Phone: 831-383-2883
Location Address: 74 UHL PATH
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 01/24/2024
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: FLORIDA SUN PARTNERS II LLC

Address

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

Lot: 0030
Contracted Stated Job Value: ¤220,324.00
Job Description: Single Family Residence
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CAC1820196 (Exp: 08/31/2026) 407-404-4000
ANTHONY OKEITH FENNELL
Status Location Address State License Number Phone
ACTIVE

217 N. WESTMONTE DR, SUITE 1007

ALTAMONTE SPRINGS, FL 32714

EC13011194 (Exp: 08/31/2026) 407-404-4000
JASON LEE JAMES
Status Location Address State License Number Phone
ACTIVE

217 N WESTMONTE DR SUITE 1007

ALTAMONTE SPRINGS, FL 32714

CFC1430061 (Exp: 08/31/2026) 407-404-4000

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 08/29/2024 FINAL APPROVED BTAYLOR
Note: 8/28/2024 - PREVIOUS INSPECTION NOTES 8-28-24 1. Missing air registerin den and back porch. 2. No shower heads in any of the bathrooms. 3. Tile is not complete in master water closet.
ROW - STORMWATER FINAL 08/29/2024 APPROVED FSLADISH
Note: 8/29/24 At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. __________________________________________________________________________________________________________________ 8/28/2024 - PREVIOUS INSPECTION NOTES 8/28/24 CULVERT PIPE IS FULL OF DIRT AT THE TIME OF THIS INSPECTION. THE ENTIRE PIPE WILL NEED TO BE CLEANED OUT TO ALLOW FLOW BEFORE ROW FINAL PASSAGE. I AM NOT GOING TO FEE YOU TODAT AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES
U -UTILITY RESIDENTIAL FINAL 08/28/2024 FINAL APPROVED BWRIGHT
ROW - STORMWATER FINAL 08/28/2024 Disapproved - NO FEE FSLADISH
Note: 8/28/24 CULVERT PIPE IS FULL OF DIRT AT THE TIME OF THIS INSPECTION. THE ENTIRE PIPE WILL NEED TO BE CLEANED OUT TO ALLOW FLOW BEFORE ROW FINAL PASSAGE. I AM NOT GOING TO FEE YOU TODAT AS I WAS ALREADY HERE FOR YOUR AFTERPOUR INSPECTION. PHOTO FOR REFERENCE _________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES
BLD - BUILDING FINAL 08/28/2024 Disapproved - NO FEE BTAYLOR
Note: 8-28-24 1. Missing air registerin den and back porch. 2. No shower heads in any of the bathrooms. 3. Tile is not complete in master water closet.
U-CROSS CONNECTION 08/28/2024 APPROVED - AS NOTED BWRIGHT
Note: IRR with potable water. PVB in place. No CC.
ROW - FINAL APRON (AFTER POUR) 08/28/2024 APPROVED FSLADISH
Note: 8/28/24 PIPE ELEVATION GOOD. CUTS MADE. CULVERT FULL OF DIRT (HOLD ONROW FINAL) HOT PATCH ROAD REPAIRS COMPLETED AT THE TIME OF THIS INSPECTION. ________________________________________________________________________________________________________________________ Inspector Notes from Inspection 9465 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/27/2024 APPROVED - AS NOTED FSLADISH
Note: 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ROW FIELD SURVEY /GRADING CERTIFICATION 08/27/2024 APPROVED - AS NOTED FSLADISH
Note: 8/27/24 UPON WALKING THE PROPERTY DETERMINED THAT DRAINAGE WILL WORK. 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. Inspector Notes from Inspection 9463 8/27/24 AFTER CONFERRING WITH DAN CM AND PARREN WE HAVE MADE A DETERMINATION TO ALLOW THE DRAINGE PATTERN AS INDICATED ON THE FINAL SURVEY. APPROVING THIS AS NOTED. _________________________________________________________________________________________________________________________ 8/15/2024 - PREVIOUS INSPECTION NOTES 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. 8/26/2024 - PREVIOUS INSPECTION NOTES
ROW FIELD SURVEY /GRADING CERTIFICATION 08/26/2024 CANCELLED BY APPLICANT FSLADISH
ROW- FINAL SURVEY/GRADING CERTIFICATION 08/15/2024 Disapproved - NO FEE FSLADISH
Note: 8/15/24 YOUR SURVEY SHOWS YOUR UHL PATH FRONT SWALE DRAINING UPHILL. Swale must flow in the right direction Sec. 300.01.c1 Sec. 300.01 c1The tolerance on the final swale elevations, compared to the Swale Plan, is plus or minus a tenth of a foot and must demonstrate positive fall in the direction described in the swale plan. Inspector Notes from Inspection 9270 YOUR SITE PLAN SHOWS A BERM IN THE REAR YOUR FINAL SURVEY SHOWS REAR DRAINAGE RUNNING STRAIGHT DOWN ONTO THE REAR ADJOINING PROPERTY. YOU CANNOT DRAIN ON TO ADJOINING PROPERTY CAUSING ADVERSE DRAINAGE. Rear yard will be drained Section 300.01 Section 300.01.Identify how the rear yard will be drained. The rear yard is required to drain to the front yard swale, unless the Topographic Survey/Lot Grading Plan demonstrates a rear yard drainage system with an appropriate outfall. Flooding or draining onto adjacent properties will not be allowed. 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
ELECTRIC - EARLY POWER 07/31/2024 APPROVED - AS NOTED BTAYLOR
Note: 7-31-24 1. Emailed FPL at 3:06.
FLOOR / WALL PENETRATION 07/25/2024 APPROVED BTAYLOR
ELECTRIC-TUG 06/27/2024 APPROVED RMARTIN
Note: 4/24/2024 - PREVIOUS INSPECTION NOTES 4-24-24 1. Wire and ground chase are not strapped to house
GRAVITY SEWER TEST 06/13/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 3/28/2024 - PREVIOUS INSPECTION NOTES NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE. NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE, ALSO WILL CHECK COVERAGE AT SLAB INSPECTION FOR WATER DISTRIBUTION LINES AND WASTE IN GARAGE AREA AND GUEST BATHROOM THIS WAS A VIRTUAL INSPECTION
U - SEWER TIE IN 06/13/2024 APPROVED - AS NOTED MGIBSON
Note: Inspector Notes from Inspection 2060 3/28/2024 - PREVIOUS INSPECTION NOTES NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE. NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE, ALSO WILL CHECK COVERAGE AT SLAB INSPECTION FOR WATER DISTRIBUTION LINES AND WASTE IN GARAGE AREA AND GUEST BATHROOM THIS WAS A VIRTUAL INSPECTION
ROW- PRE-APRON (PRE-POUR) 06/13/2024 APPROVED - AS NOTED FSLADISH
Note: 6/13/24 PIPE ELEVATION GOOD. READY TO POUR AT THE TIME OF THIS INSPECTION. AT THE TIME OF THE INSPECTION CULVERT PIPE IS GOOD IS READY TO POUR, IF RAIN PLEASE, BUILDER SHOULD MAKE SURE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL BEFORE POURING. DOUBLE CHECK CULVERT ELEVATIONS At the time of the inspection all minimum city requirements were met. It is the builders responsibiliy to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour.
INSULATION 05/17/2024 APPROVED BTAYLOR
LATH/BRICK/ WATER BARRIER 05/13/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2420 5-9-24 1. Electrical panel needs metal plug in top. 2. Where electrical panel is framed in needs fire blocking at the top plate. 3. Windows do not have matching florida approval numbers. Check at insulation.
ALL ROUGH 05/09/2024 APPROVED - AS NOTED BTAYLOR
Note: 5-9-24 1. Electrical panel needs metal plug in top. 2. Where electrical panel is framed in needs fire blocking at the top plate. 3. Windows do not have matching florida approval numbers. Check at insulation.
ROOF VALLEY & METAL 05/02/2024 APPROVED BTAYLOR
Note: Inspector Notes from Inspection 2460 4-26-24 1. Missing engineering.
WALL SHEATHING 04/26/2024 APPROVED BTAYLOR
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/26/2024 APPROVED - AS NOTED BTAYLOR
Note: 4-26-24 1. Missing engineering.
ELECTRIC-TUG 04/24/2024 Disapproved - NO FEE BTAYLOR
Note: 4-24-24 1. Wire and ground chase are not strapped to house
TIE BEAM / LINTEL 04/16/2024 APPROVED BTAYLOR
Note: 4/15/2024 - PREVIOUS INSPECTION NOTES 4/11/2024 - PREVIOUS INSPECTION NOTES 4-11-24 1. Majority of drills pulled out . 2. Mud beds exceed 1/2" max depth. All are circled on plans. 4-15-24 1. 1 of the three dowels pulled again. Circled on plans.
TIE BEAM / LINTEL 04/15/2024 Disapproved - NO FEE BTAYLOR
Note: 4/11/2024 - PREVIOUS INSPECTION NOTES 4-11-24 1. Majority of drills pulled out . 2. Mud beds exceed 1/2" max depth. All are circled on plans. 4-15-24 1. 1 of the three dowels pulled again. Circled on plans.
FOUND SURVEY APPROVED (OFFICE) 04/15/2024 APPROVED TDOAK
TIE BEAM / LINTEL 04/11/2024 Disapproved -FEE REQUIRED BTAYLOR
Note: 4-11-24 1. Majority of drills pulled out . 2. Mud beds exceed 1/2" max depth. All are circled on plans.
MONOLITHIC SLAB 04/03/2024 APPROVED BTAYLOR
PLUMBING 1ST ROUGH UNDERGROUND 04/01/2024 APPROVED - AS NOTED MGIBSON
Note: 3/28/2024 - PREVIOUS INSPECTION NOTES NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE. NEED TO CHANGE PLUMBING SUB-CONTRACTOR TO CORRECT ONE, ALSO WILL CHECK COVERAGE AT SLAB INSPECTION FOR WATER DISTRIBUTION LINES AND WASTE IN GARAGE AREA AND GUEST BATHROOM
PLUMBING 1ST ROUGH UNDERGROUND 03/28/2024 Disapproved -FEE REQUIRED MGIBSON
Note: NO TEST ON WASTE ANDVENT SYSTEM, NO TEST ON WATER DISTRIBUTION LINES AND THE DISTRIBUTION AND WASTE AND VENT ARE QUESTIONABLE AS FAR AS DEPTHTH FOR CONCRETE COVERAGE
WATER METER INSTALLATION REQUEST 03/07/2024 APPROVED CBOWERMASTER

Review History

Department Status Date In Date Out
ENGIN1 COMPLETE 08/23/2024 08/23/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 COMPLETE 08/23/2024 08/26/2024
Note: Released By: JOHN HOWARD - - JHOWARD@PALMCOASTGOV.COM SW1 completed review is contingent on stormwater inspector's approval of the final survey. A failed final survey inspection and/or a revised site plan indicating any significant change in drainage patterns and elevations negatively impacting neighboring lots, or the structure will result in a HOLD
ZON COMPLETE 08/23/2024 08/23/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 07/10/2024 07/10/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 05/13/2024 05/17/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM KS
MECH COMPLETE 04/29/2024 05/02/2024
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/15/2024 04/15/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/15/2024 04/15/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
ZON COMPLETE 01/03/2024 01/03/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD COMPLETE 01/03/2024 01/05/2024
Note: Released By: JPI
ZON HOLD 12/21/2023 12/21/2023
Note: Held By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM Front elevation not submitted last one was rejected
BLD COMPLETE 12/21/2023 12/27/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON HOLD 12/11/2023 12/11/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM New plans missing the elevation pages Window facing right of way must have banding. Left side facing street.
ZON HOLD 10/04/2023 10/05/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Walkway material missing from site plan/survey Window facing row must have banding. Left side facing street.
MECH COMPLETE 10/04/2023 10/05/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
BLD COMPLETE 10/04/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
CUSVC COMPLETE 10/04/2023 10/05/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 10/04/2023 10/09/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 10/04/2023 10/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 10/04/2023 10/05/2023
LOCATE COMPLETE 10/04/2023 10/06/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
SW1 COMPLETE 10/04/2023 10/05/2023
Note: Released By: EDWARD MADISON - (386)986-4770 - EMADISON@PALMCOASTGOV.COM
BLD COMPLETE 08/03/2023 08/10/2023
Note: Released By: JPI
CUSVC COMPLETE 08/03/2023 08/07/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 08/03/2023 08/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/03/2023 08/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/03/2023 08/04/2023
LOCATE COMPLETE 08/03/2023 08/08/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH HOLD 08/03/2023 08/04/2023
Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Direction house faces on Energy Calcs does not match the site plan. Revise to match per R405.4.2.1 FBC Energy Conservation 2020 7Th Edition
SW1 COMPLETE 08/03/2023 08/09/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ZON HOLD 08/03/2023 08/03/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Legal description missing on site plan/survey Flood panel number missing on site plan/survey Walkway material missing from site plan/survey Window facing row must have banding. Left side facing street.
BADMIN COMPLETE 08/03/2023 08/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 08/03/2023 09/19/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
PLAN REVIEW - REVISION ¤32.50 08/29/2024
REINSPECTION RESIDENTIAL ¤40.00 08/29/2024
REINSPECTION RESIDENTIAL ¤40.00 04/02/2024
CONTRACTOR CHANGE ¤20.00 04/02/2024
CONTRACTOR CHANGE ¤20.00 04/02/2024
CONTRACTOR CHANGE ¤20.00 04/02/2024
FC IMPACT FEE EMS ¤62.00 01/24/2024
IMPACT FEE FIRE ¤428.09 01/24/2024
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 01/24/2024
FC IMPACT FEE LIBRARY ¤268.00 01/24/2024
IMPACT FEE PARKS ¤1,800.99 01/24/2024
IMPACT FEE SCHOOL ¤5,450.00 01/24/2024
IMPACT FEE TRANSPORTATION ¤1,812.00 01/24/2024
WATER -IRRIGATION INSPECTION ¤25.00 01/24/2024
SURCHARGE FS 533.721 ¤2.93 01/24/2024
SURCHARGE - FS 468.631 ¤4.39 01/24/2024
SW ENG - FOUNDATION SURVEY ¤20.00 01/24/2024
SW ENG INSPECTION 80 ¤80.00 01/24/2024
SW ENG PRE APRON ¤30.00 01/24/2024
SW ENG - REVIEW 20 ¤20.00 01/24/2024
SW ENG RES REVIEW 200 ¤200.00 01/24/2024
SEWER CREDIT (¤2,501.34) 01/24/2024
SEWER INSPECTION ¤25.00 01/24/2024
SEWER CAPITAL FACILITY ¤5,344.82 01/24/2024
WATER CREDIT (¤125.79) 01/24/2024
WATER CAPITAL FACILITY FEE ¤3,923.88 01/24/2024
SITE PLAN 30 ¤30.00 01/24/2024
CONNECTION FEES ¤1,166.26 01/24/2024
CONTRACTOR CHANGE ¤20.00 01/24/2024
WATER- TURN ON ¤25.00 01/24/2024
ADJUSTMENT 50% (¤512.73) 01/24/2024
ADMINISTRATIVE RESIDENTIAL ¤30.00 01/24/2024
INSPECTION - RESIDENTIAL ¤775.50 01/24/2024
PLAN REVIEW - RESIDENTIAL ¤219.96 01/24/2024
Fees Total Due: ¤0.00 Total Paid: ¤19,014.46