I want to search for...

Permit #2023080183

Permit Details

Status: COED

Parcel Id: 07-11-31-7007-00030-0310
CONDITIONED SPACE: 2306 sqft
GARAGE: 466 sqft
OPENED PORCH (WITH ROOF) : 170 sqft
Total Square Footage: 2942 sqft
Block: 00030
Subdivision: 2185 - SECTION 7-FLORIDA PARK
Job Phone: 831-383-2883
Location Address: 130 FOXHALL LN
Type: BR - BUILDING RESIDENTIAL -SINGLE FAMILY
Issue Date: 11/21/2023
NOC: RECORDED
Applicant name: EDWARD LEE DAUBERT JR
Owner: FLORIDA SUN PARTNERS II LLC

Address

7345 GREENBRIAR PKWY

ORLANDO, FL 32819

Lot: 0310
Contracted Stated Job Value: ¤220,324.00
Job Description: Single Family Residence
Type: CN

Contractor

BRITE BUILDING GROUP LLC
Status Location Address State License Number Phone
ACTIVE

6751 FORUM DRIVE SUITE 210

ORLANDO, FL 32821

CBC1266303 (Exp: 08/31/2026) 831-383-2883

Sub Contractors

ROBERT MICHAEL RENNER
Status Location Address State License Number Phone
ACTIVE

531 CODISCO WAY

SANFORD, FL 32771

CAC051477 (Exp: 08/31/2026) 407-333-2665
JONATHAN M PEARSON
Status Location Address State License Number Phone Fax
ACTIVE

209 N FORSYTH ST

BUNNELL, FL 32110

CFC1425941 (Exp: 08/31/2026) 386-597-0944 386-437-4996
DUSTIN L ESTEP
Status Location Address State License Number Phone Fax
ACTIVE

2041 N HIAWASSEE RD

APOPKA, FL 32703

CCC1330971 (Exp: 08/31/2026) 407-702-0206 352-988-6629
JOSEPH HORATIO STRADA JR
Status Location Address State License Number Phone
ACTIVE

3400 ST JOHNS PARKWAY

SANFORD, FL 32771

EC13003715 (Exp: 08/31/2026) 877-906-1113

Inspection History

Type Request Date Result Inspector
BLD - BUILDING FINAL 07/29/2024 FINAL APPROVED JSTEWART
Note: 7/25/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY JSTEWART 7/25/2024 9:43:15 AM *** 1. Please relocate Outlets located at Island per 2017 NEC 210.52 (c) 5 (exception) ...receptacle outlets shall be permitted to be mounted not more than 300 mm (12 in.) below the countertop or work surface. Receptacles mounted below a countertop or work surface in accordance with this exception shall not be located where the countertop or work surface extends more than 150 mm (6 in.) beyond its support base. 2. Please seal wall Penetration (exterior) at condensation line. FBC R402.4. 3. Please relocate the discharge to 12" from foundation wall line. FBCR 318.5
BLD - BUILDING FINAL 07/25/2024 Disapproved -FEE REQUIRED JSTEWART
Note: *** NOTES ADDED BY JSTEWART 7/25/2024 9:43:15 AM *** 1. Please relocate Outlets located at Island per 2017 NEC 210.52 (c) 5 (exception) ...receptacle outlets shall be permitted to be mounted not more than 300 mm (12 in.) below the countertop or work surface. Receptacles mounted below a countertop or work surface in accordance with this exception shall not be located where the countertop or work surface extends more than 150 mm (6 in.) beyond its support base. 2. Please seal wall Penetration (exterior) at condensation line. FBC R402.4. 3. Please relocate the discharge to 12" from foundation wall line. FBCR 318.5
ROW - STORMWATER FINAL 06/24/2024 APPROVED EMADISON
U -UTILITY RESIDENTIAL FINAL 06/20/2024 FINAL APPROVED LFITZGERALD
Note: Inspector Notes from Inspection 9035 Potable water IRR with PVB installed
ROW - FINAL APRON (AFTER POUR) 06/20/2024 APPROVED GBERTOLA
Note: AT THE TIME OF THE INSPECTION, ALL MINIMUM CITY REQUIREMENTS WERE MET. IT IS THE BUILDER'S RESPONSIBILITY TO ENSURE THAT NOTHING CHANGES AFTER THIS INSPECTION IS APPROVED. THIS INCLUDES BUT IS NOT LIMITED TO THE CULVERT PIPE ELEVATION APPROVAL FOR THE CONCRETE POUR. Inspector Notes from Inspection 9465 ** 06/17/24 BEFORE FINAL ROW IS APPROVED ** RIGHT SIDE AT PROPERTY LINE IN ROW NEED TO ADD SOD TO ALL EXPOSED BARE EARTH ** NEED TO LOWER THE SOD ALONG ENTIRE EDGE OF ROAD AS THE FINISHED GRADE NEEDS TO BE 2 INCHES BELOW THE EDGE OF PAVEMENT (ROAD) BEFORE SOD IS LAID SO WATER DRAINS OF THE ROADWAY TO SWALE. SEE DRAWING 300.D TYPICAL RESIDENTIAL SWALE PROFILE
U-CROSS CONNECTION 06/18/2024 APPROVED - AS NOTED BWRIGHT
Note: Potable water IRR with PVB installed
ELECTRIC - EARLY POWER 06/18/2024 APPROVED JWALKER
Note: 6/17/2024 - PREVIOUS INSPECTION NOTES *** NOTES ADDED BY RMARTIN 6/17/2024 1:08:02 PM *** NEED TO HAVE PANEL COVER INSTALLED AND ALL CONDUCTORS IN THE PANEL LANDED/SAFED OFF
ELECTRIC - EARLY POWER 06/17/2024 Disapproved - NO FEE RMARTIN
Note: *** NOTES ADDED BY RMARTIN 6/17/2024 1:08:02 PM *** NEED TO HAVE PANEL COVER INSTALLED AND ALL CONDUCTORS IN THE PANEL LANDED/SAFED OFF
ROW- FINAL SURVEY/GRADING CERTIFICATION 06/17/2024 APPROVED EMADISON
Note:
ROW FIELD SURVEY /GRADING CERTIFICATION 06/17/2024 APPROVED - AS NOTED EMADISON
Note: ** 06/17/24 BEFORE FINAL ROW IS APPROVED ** RIGHT SIDE AT PROPERTY LINE IN ROW NEED TO ADD SOD TO ALL EXPOSED BARE EARTH ** NEED TO LOWER THE SOD ALONG ENTIRE EDGE OF ROAD AS THE FINISHED GRADE NEEDS TO BE 2 INCHES BELOW THE EDGE OF PAVEMENT (ROAD) BEFORE SOD IS LAID SO WATER DRAINS OF THE ROADWAY TO SWALE. SEE DRAWING 300.D TYPICAL RESIDENTIAL SWALE PROFILE
ROW- PRE-APRON (PRE-POUR) 05/20/2024 APPROVED - AS NOTED EMADISON
Note: ** 05/20/24 READY TO POUR / BUILDER NOTES INDUCATE THEY WILL BACK FILL FORM BOARDS BEFORE POUR ** At the time of the inspection all minimum city requirements were met. It is the builders responsibility to ensure that nothing changes after this Inspection is approved. This includes but is not limited to, the Culvert Pipe Elevation from the time of the inspection approval to the concrete pour. **MAKE SURE THERE IS 3000 PSI CONCRETE REINFORCED WITH WWF 6X6.W1.4 MESH OR FIBERGLASS REINFORCED CONCRETE (FRC) DRAWING 300,E RESIDENTIAL CULVERT DETAIL
INSULATION 05/13/2024 APPROVED FWILLIS
Note: 5/13/24 - ITEMS CORRECTED. CERTIFICATE ON SITE, FIRE FOAM INSTALLED AS REQUESTED. 5/10/2024 - PREVIOUS INSPECTION NOTES 5-10-24 1. need signed insulation certificate for sprayed foam insulation on site per r303.1.1.2 2. need fire blocking (faom) at plumbing supply line top plate at kitchen wall near laundry per R302.11 (4 5/9/2024 - PREVIOUS INSPECTION NOTES not ready for inspection, not completed,
INSULATION 05/10/2024 Disapproved - NO FEE LMILLER
Note: 5-10-24 1. need signed insulation certificate for sprayed foam insulation on site per r303.1.1.2 2. need fire blocking (faom) at plumbing supply line top plate at kitchen wall near laundry per R302.11 (4 5/9/2024 - PREVIOUS INSPECTION NOTES not ready for inspection, not completed,
INSULATION 05/09/2024 Disapproved - NO FEE LMILLER
Note: not ready for inspection, not completed,
GRAVITY SEWER TEST 05/08/2024 APPROVED MGIBSON
U - SEWER TIE IN 05/08/2024 APPROVED - AS NOTED MGIBSON
Note: ERIC TOLD PLUMBING CONTRACTO TO TIE INTO NEIGHBORING STUB UP. 4'' CAN CATCH UP TO 400 + FIXTURE UNITS
LATH/BRICK/ WATER BARRIER 05/03/2024 APPROVED JWALKER
ALL ROUGH 05/02/2024 APPROVED JWALKER
ROOF VALLEY & METAL 04/26/2024 APPROVED JSTEWART
WALL SHEATHING 04/22/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2340 4/8/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please verify work is complete prior to calling in inspections to avoid future fees R319.1 Address identification. Buildings shall be provided with approved address identification. Before next inspection. 4/5/2024 - PREVIOUS INSPECTION NOTES 4-5-24 1. No dowel layout in plans.
ROOF SHEATHING / BRACES/TIES/DOWN CELL 04/22/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2340 4/8/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please verify work is complete prior to calling in inspections to avoid future fees R319.1 Address identification. Buildings shall be provided with approved address identification. Before next inspection. 4/5/2024 - PREVIOUS INSPECTION NOTES 4-5-24 1. No dowel layout in plans.
ROOF SHEATHING 04/22/2024 APPROVED JWALKER
Note: Inspector Notes from Inspection 2340 4/8/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please verify work is complete prior to calling in inspections to avoid future fees R319.1 Address identification. Buildings shall be provided with approved address identification. Before next inspection. 4/5/2024 - PREVIOUS INSPECTION NOTES 4-5-24 1. No dowel layout in plans.
ELECTRIC-TUG 04/11/2024 APPROVED RMARTIN
FOUND SURVEY APPROVED (OFFICE) 04/08/2024 APPROVED TBAKER
TIE BEAM / LINTEL 04/08/2024 APPROVED - AS NOTED JSTEWART
Note: 4/8/24- 3307.1 Protection required. …Provisions shall be made to control water runoff and erosion during construction or demolition activities Please verify work is complete prior to calling in inspections to avoid future fees R319.1 Address identification. Buildings shall be provided with approved address identification. Before next inspection. 4/5/2024 - PREVIOUS INSPECTION NOTES 4-5-24 1. No dowel layout in plans.
TIE BEAM / LINTEL 04/05/2024 Disapproved - NO FEE BTAYLOR
Note: 4-5-24 1. No dowel layout in plans.
MONOLITHIC SLAB 03/27/2024 APPROVED JWALKER
Note: 3/26/2024 - PREVIOUS INSPECTION NOTES missing 1 number 5 bar at detail F7 on sheet A1.0
MONOLITHIC SLAB 03/26/2024 Disapproved - NO FEE LMILLER
Note: missing 1 number 5 bar at detail F7 on sheet A1.0
PLUMBING 1ST ROUGH UNDERGROUND 03/21/2024 APPROVED JWALKER
WATER METER INSTALLATION REQUEST 02/22/2024 APPROVED CBOWERMASTER
WILDLIFE CHECK - ENVIRONMENTAL 08/07/2023 APPROVED DRODRIGUEZ

Review History

Department Status Date In Date Out
BLD COMPLETE 07/10/2024 07/16/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ZON COMPLETE 07/10/2024 07/10/2024
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
BLD COMPLETE 04/09/2024 04/09/2024
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 04/08/2024 04/08/2024
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 04/08/2024 04/08/2024
Note: Released By: TRACEY DOAK - (386)986-3751 - TDOAK@PALMCOASTGOV.COM
BLD HOLD 01/04/2024 01/05/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. You need to be more clear on whats changing. What are can lights in the seal. Documents seem to be the same besides the date stamped.
BLD HOLD 01/03/2024 01/04/2024
Note: Held By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM 1. Truss packet must have a shop drawing approval stamp by engineer of record for the house.
SW1 COMPLETE 09/14/2023 09/20/2023
Note: Released By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/14/2023 09/15/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON COMPLETE 09/14/2023 09/14/2023
Note: Released By: CINDY CHIRI-GONCALVES - (386)986-4737 - CGONCALVES@PALMCOASTGOV.COM
ZON COMPLETE 09/01/2023 09/05/2023
Note: Released By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM
ENGIN1 COMPLETE 09/01/2023 09/05/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
SW1 HOLD 09/01/2023 09/12/2023
Note: Held By: GABRIEL BERTOLA - (386)986-7660 - GBERTOLA@PALMCOASTGOV.COM Drainage from the structure is to be a 6 inch (5%) minimum slope for the first 10’.(E) E.Land Development Code Technical Manual, Section 300.01 (A)(1)(B)(6)
ENGIN1 COMPLETE 08/28/2023 08/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/28/2023 08/28/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM AC pad location doesn't match on site plan, floor plan and landscape plan
SW1 COMPLETE 08/28/2023 08/28/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
BLD COMPLETE 08/03/2023 08/10/2023
Note: Released By: JPI
CUSVC COMPLETE 08/03/2023 08/03/2023
Note: Released By: HALEIGH HAND - - HHAND@PALMCOASTGOV.COM
ELEC COMPLETE 08/03/2023 08/03/2023
Note: Released By: JOSH MUNSON - (386)986-4736 - JMUNSON@PALMCOASTGOV.COM
ENGIN1 COMPLETE 08/03/2023 08/03/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
GAS CANCEL 08/03/2023 08/04/2023
LOCATE COMPLETE 08/03/2023 08/04/2023
Note: Released By: CANDACE BOWERMASTER - - CBOWERMASTER@PALMCOASTGOV.COM
MECH COMPLETE 08/03/2023 08/04/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SW1 COMPLETE 08/03/2023 08/07/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ZON HOLD 08/03/2023 08/03/2023
Note: Held By: ALISHA MOBLEY - (386)986-3751 - AMOBLEY@PALMCOASTGOV.COM Legal description missing on site plan/survey Flood panel number missing on site plan/survey Walkway material missing from site plan/survey AC pad location doesn't match on site plan, floor plan and landscape plan
BADMIN COMPLETE 08/03/2023 08/11/2023
Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM
SWALE COMPLETE 08/03/2023 09/20/2023
Note: Released By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM
ENGIN1 HOLD 08/03/2023 08/03/2023
Note: Held By: TIM BAKER - (386)986-4726 - TBAKER@PALMCOASTGOV.COM Benchmark elevation (nail at edge of pavement) is 6' higher than CL of road elevation.
PLENV COMPLETE 08/03/2023 08/04/2023
Note: Released By: DYLAN RODRIGUEZ - - DRODRIGUEZ@PALMCOASTGOV.COM Staff conducted a site visit on 08/04/2023 and found no Gopher Tortoise or their burrows. Staff suggests placing silt fence as soon as possible to prevent tortoise from moving into the lot.

Fees & Payments

(Permit is not ready for pickup until the permit has been processed and fees appear)
Description Amount Due Date Paid
REINSPECTION RESIDENTIAL ¤40.00 07/29/2024
CONTRACTOR CHANGE ¤20.00 01/16/2024
FIRE IMPACT FEE ADMIN ¤12.62 11/21/2023
FIRE IMPACT FEE ADMIN (¤12.62) 11/21/2023
FC IMPACT FEE EMS ¤62.00 11/21/2023
IMPACT FEE FIRE ¤420.52 11/21/2023
FC IMPACT FEE LAW ENFORCEMENT ¤218.00 11/21/2023
FC IMPACT FEE LIBRARY ¤268.00 11/21/2023
IMPACT FEE PARKS ¤1,769.15 11/21/2023
IMPACT FEE SCHOOL ¤5,450.00 11/21/2023
IMPACT FEE TRANSPORTATION ¤1,812.00 11/21/2023
WATER -IRRIGATION INSPECTION ¤25.00 11/21/2023
PARKS IMPACT FEE ADMIN ¤53.07 11/21/2023
PARKS IMPACT FEE ADMIN (¤53.07) 11/21/2023
SURCHARGE FS 533.721 ¤5.13 11/21/2023
SURCHARGE - FS 468.631 ¤7.69 11/21/2023
SW ENG - FOUNDATION SURVEY ¤20.00 11/21/2023
SW ENG INSPECTION 80 ¤80.00 11/21/2023
SW ENG PRE APRON ¤30.00 11/21/2023
SW ENG - REVIEW 20 ¤20.00 11/21/2023
SW ENG RES REVIEW 200 ¤200.00 11/21/2023
TRANS IMPACT FEE ADMIN ¤54.36 11/21/2023
TRANS IMPACT FEE ADMIN (¤54.36) 11/21/2023
SEWER INSPECTION ¤25.00 11/21/2023
SEWER CAPITAL FACILITY ¤5,344.82 11/21/2023
WATER CAPITAL FACILITY FEE ¤3,923.88 11/21/2023
SITE PLAN 30 ¤30.00 11/21/2023
CONNECTION FEES ¤1,166.26 11/21/2023
WATER- TURN ON ¤25.00 11/21/2023
ADJUSTMENT 50% (¤512.73) 11/21/2023
ADMINISTRATIVE RESIDENTIAL ¤30.00 11/21/2023
INSPECTION - RESIDENTIAL ¤775.50 11/21/2023
PLAN REVIEW - RESIDENTIAL ¤219.96 11/21/2023
Fees Total Due: ¤0.00 Total Paid: ¤21,475.18