Permit #2023080222
Permit Details
Status: COED
| Parcel Id: 07-11-31-7033-00330-0120 |
| Block: 00330 |
| Subdivision: 2184 - SECTION 33-ROYAL PALMS |
| Job Phone: 904-813-0124 |
| Location Address: 102 RED MILL DR |
| Type: RF - REROOF |
| Issue Date: 08/04/2023 |
| NOC: RECORDED |
| Applicant name: JORDAN R WEBB |
| Owner: REGO GEORGE M & ELIZABETH A REGO H&W |
|
Address 102 RED MILL DRIVE PALM COAST, FL 32164 |
| Lot: 0120 |
| Contracted Stated Job Value: ¤18,800.00 |
| Job Description: Reroof |
| Type: CN |
Contractor
REDTAIL ROOFING LLC
| Status | Location Address | State License Number | Phone |
| ACTIVE |
7643 GATE PARKWAY 104-177 JACKSONVILLE, FL 32256 |
CCC1331300 (Exp: 08/31/2026) | 904-813-0124 |
Inspection History
| Type | Request Date | Result | Inspector |
| ROOF FINAL | 08/24/2023 | APPROVED | RSIMS |
| Note: 8/9/2023 - PREVIOUS INSPECTION NOTES 8/9/23 1. The contractor removed 5 off ridge vents and replaced with solar operated vents. Please have the engineer submit a revision to the building department. Show the size of the attice space the solar vent specs. And required ventilation calculations. 2. The solar vents are missing fasteners. 8/7/23 went back at 2:15 1/2 roof completed per fbc at this point 8/7/2023 - PREVIOUS INSPECTION NOTES 1 stop at 11:04 am demo still underway. | |||
| ROOF FINAL | 08/09/2023 | Disapproved - NO FEE | JWALKER |
| Note: 8/9/23 1. The contractor removed 5 off ridge vents and replaced with solar operated vents. Please have the engineer submit a revision to the building department. Show the size of the attice space the solar vent specs. And required ventilation calculations. 2. The solar vents are missing fasteners. 8/7/23 went back at 2:15 1/2 roof completed per fbc at this point 8/7/2023 - PREVIOUS INSPECTION NOTES 1 stop at 11:04 am demo still underway. | |||
| ROOF AFFIDAVIT | 08/08/2023 | APPROVED | MRAMOS |
| ROOF IN PROGRESS- MIDROOF | 08/07/2023 | CANCELLED BY APPLICANT | JWALKER |
| Note: 1 stop at 11:04 am demo still underway. | |||
| ROOF IN PROGRESS- MIDROOF | 08/07/2023 | APPROVED - AS NOTED | RMARTIN |
| Note: 8/7/23 went back at 2:15 1/2 roof completed per fbc at this point 8/7/2023 - PREVIOUS INSPECTION NOTES 1 stop at 11:04 am demo still underway. |
Review History
| Department | Status | Date In | Date Out |
| BLD | COMPLETE | 08/22/2023 | 08/23/2023 |
| Note: Released By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM | |||
| BLD | HOLD | 08/17/2023 | 08/18/2023 |
| Note: Held By: CHRIS PISCITELLI - (386)986-2574 - CPISCITELLI@PALMCOASTGOV.COM Provide roof ventilation calculation per FBC 2020 7Th edition |
Fees & Payments
(Permit is not ready for pickup until the permit has been processed and fees appear)
| Description | Amount Due | Date Paid |
| ADJUSTMENT 50% | (¤45.00) | 08/04/2023 |
| ADMINISTRATIVE RESIDENTIAL | ¤30.00 | 08/04/2023 |
| INSPECTION - RESIDENTIAL | ¤60.00 | 08/04/2023 |
| SURCHARGE FS 533.721 | ¤2.00 | 08/04/2023 |
| SURCHARGE - FS 468.631 | ¤2.00 | 08/04/2023 |
| Fees | Total Due: ¤0.00 | Total Paid: ¤49.00 |